Registration lapsed No litigation declared Commercial project

shikrapur Trade Centre Phase I

By Pride landmarks

RG-MH-22308 · RERA P52100031674 · Last updated on MahaRERA portal: 22 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 13 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promised13 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
73 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

shikrapur Trade Centre Phase I is a Commercial project by Pride landmarks in Pune, Maharashtra, registered with MahaRERA as P52100031674 on 3 Nov 2021. Possession was promised by 1 Sep 2025 and is now 13 months past that date. 93 of the 166 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • Nameshikrapur Trade Centre Phase I
  • TypeCommercial
  • Location
    • Pune Nagar Road
    • shikrapur
    • Shirur
    • Pune
    • 412208
  • Pincode412208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031674
  • ReraGenie IDRG-MH-22308

Builder

  • NamePride landmarks
  • Entity typePartnership
  • PartnersVirdhawal Sambhajirao Karanje, Ramesh Laxman Bhujbal
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

13 months past promisethis monthRegisteredNov 2021PromisedSep 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Nov 2021
  • Promised completion1 Sep 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Current status

56%93 of 166 units booked
99.0%Work done, per cost certificate

Figures as on 22 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
shikrapur Trade Centre Phase INA550166166

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

shikrapur Trade Centre Phase I: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,700 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Aug 2025

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI57970.0
Proposed, not sanctioned57,970 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIKRAPUR PUNE 412208
Estimated costRs 9.60 cr
Cost incurredRs 9.50 cr
Work done98.96%
BuildingWingEstimatedIncurred
shikrapur Trade Centre Phase INARs 9.00 crRs 9.00 cr
-NARs 60.00 lakhRs 50.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX architects Association imran shaikh
EngineerManish Raut
Chartered AccountantG C BANG
Chartered AccountantKalpesh K Nagar
PartnerRole in project
Pride landmarks-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Oct 2021

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form one phase one_compressed.pdf22 Nov 2025
Withdrawal Update Form 2File: Form two phase one_compressed.pdf22 Nov 2025
Withdrawal Update Form 3File: form three phase one_compressed.pdf22 Nov 2025
Withdrawal Update Form 1File: form one phase one_compressed.pdf4 Nov 2025
Withdrawal Update Form 1File: form one phase one_compressed.pdf4 Nov 2025
Withdrawal Update Form 2File: Form two phase one_compressed.pdf4 Nov 2025
Withdrawal Update Form 2File: Form two phase one_compressed.pdf4 Nov 2025
Withdrawal Update Form 3File: form three phase one_compressed.pdf4 Nov 2025
Withdrawal Update Form 3File: form three phase one_compressed.pdf4 Nov 2025
Withdrawal Update Form 1File: form one phase one_compressed.pdf3 Nov 2025
Withdrawal Update Form 13 Nov 2025
Withdrawal Update Form 1File: form one phase one_compressed.pdf3 Nov 2025
Withdrawal Update Form 1File: form one phase one_compressed.pdf3 Nov 2025
Withdrawal Update Form 2File: Form two phase one_compressed.pdf3 Nov 2025
Withdrawal Update Form 23 Nov 2025
Withdrawal Update Form 2File: Form two phase one_compressed.pdf3 Nov 2025
Withdrawal Update Form 2File: Form two phase one_compressed.pdf3 Nov 2025
Withdrawal Update Form 3File: form three phase one_compressed.pdf3 Nov 2025
Withdrawal Update Form 33 Nov 2025
Withdrawal Update Form 3File: form three phase one_compressed.pdf3 Nov 2025
Withdrawal Update Form 3File: form three phase one_compressed.pdf3 Nov 2025
Form 2A (FY 2024-2025)File: 2025-08-28 15-43-21_compressed.pdf28 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form one phase I.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form three phase I.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form two phase I.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Phase 1.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I phase I.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III phase I.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II Phase I.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form one Phase I.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form Two Phase I.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form Three Phase I.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form one phase one.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form two phase one.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form two a phase one.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form three phase phase one.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase I form I.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase I form II.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase I form Three.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FI.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM TWO PHASE I.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ITR.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PHASE I.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PHASE ONE.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: adity.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: aditya.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHASE Iompressed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I PHASE I.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: I.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: III I.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I PHASE I.pdf23 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER PHASE I.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM II A PHASE I.pdf23 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase - I.pdf22 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q-1.pdf22 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 20230204_compressed.pdf4 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 1(2) (1).pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: new d.pdf2 Feb 2023
Layout approvalFile: phase i r.pdf23 Jun 2022
Layout approvalFile: phase i r g.pdf23 Jun 2022
Copy of Layout Approval (in case of layout)File: phase i r.pdf23 Jun 2022
Copy of Layout Approval (in case of layout)File: phase i r g.pdf23 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase I revised architect certificate.pdf23 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase I revised architect certificate.pdf23 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Phase I.pdf23 Jun 2022
Copy of the legal title reportFile: pride landmark search declaration 1 mb pdf.pdf28 Oct 2021
Declaration in FORM BFile: pride landmarks affidavite 1 mb pdf.pdf28 Oct 2021
Declaration about Commencement CertificateFile: Pride landmarks Formate D CC declaration.pdf27 Oct 2021
Copy of the legal title reportFile: Pride landmarks Search title 1 MB pdf.pdf26 Oct 2021
Details of encumbrancesFile: Pride Landmarks Encumbrance certificate.pdf26 Oct 2021
Proforma of Allotment letterFile: Pride landmarks Sale deed 1 MB PDF.pdf26 Oct 2021
Building plan approvalFile: PMRD ORDER.pdf21 Oct 2021
PAN CardFile: pan card (pride landmarks).pdf21 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: PMRD ORDER.pdf21 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: PMRD ORDER.pdf21 Oct 2021

How this compares with Pune

56%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep shikrapur Trade Centre Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near shikrapur13,700+ in Pune

2 kmshikrapur Trade Centre PCompleted 163Lapsed / revoked 118Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: Pride landmarks

Pride landmarks has 3 registrations on MahaRERA, including shikrapur Trade Centre Phase I and shikrapur Trade Centre Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that shikrapur Trade Centre Phase I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if shikrapur Trade Centre Phase I is delayed beyond 1 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of shikrapur Trade Centre Phase I?

The registered promoter entity is Pride landmarks, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in shikrapur Trade Centre Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for shikrapur Trade Centre Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at shikrapur Trade Centre Phase I?

The professionals named in the filing: Architect: CUBIX architects Association imran shaikh; Engineer: Manish Raut; Chartered Accountant: G C BANG; Chartered Accountant: Kalpesh K Nagar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in shikrapur Trade Centre Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About shikrapur Trade Centre Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save shikrapur Trade Centre Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.