Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
13 of 88Construction stages doneacross 8 buildings; furthest along: Installation of Lifts, 80%
244 of 275Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

SHREENATH MARKET CITY is a Others project by OZONE INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100054982 on 21 Feb 2024. Possession is promised by 1 Dec 2028. 31 of the 275 units on this registration are recorded sold or booked, and 13 of 88 construction stages are filed complete.

At a glance

Project

  • NameSHREENATH MARKET CITY
  • TypeOthers
  • Location
    • TALEGAON NHAVARA ROAD
    • TALEGAON DHAMDHERE NEAR GOVERNMENT HOSPITAL
    • Talegaon Dhamdhere
    • Shirur
    • Pune
    • 412208
  • Pincode412208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054982
  • ReraGenie IDRG-MH-94688

Builder

  • NameOZONE INFRASTRUCTURE
  • Entity typePartnership
  • PartnersMAHESH SAMBHAJIRAO KARPE, RAVINDRA DNYANESHWAR BHUJBAL, BABANRAO SOPANRAO GAIKWAD, RAKESH SUBHASH METE, HEMANTKUMAR SAMBHAJIRAO KARANJE, SHUBHAM ANKUSH RAUT, KIRAN UTTAM SARDE, AMIT SUDAM ZAGADE

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Feb 2024
  • Promised completion1 Dec 2028
  • Revised completionNone
  • Buildings8 building records
  • Documents filed109 files

Current status

11%31 of 275 units booked
25.1%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA54282755
B WINGNA54151631
C WINGNA54201838
D WINGNA54122032
E WINGNA54183250
F WINGNA5416723
G WINGNA5416723
H WINGNA5416723

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Installation of Lifts, at 80%.

A WING62%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
B WING14%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D WING23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E WING23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed463

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots463
Closed/Covered10
Open Space453
BuildingClosed/CoveredOpen SpaceTotal
A WING06161
B WING05656
C WING05656
D WING05656
E WING05656
F WING35659
G WING45660
H WING35659

Land and ownership20

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area17,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners20
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jul 2025
LandownerVillageDistrict
KISAN SHANRAO SADIGALETalegaon DhamdherePune
CHHAYA BALKRUSHNA SADIGALETalegaon DhamdherePune
AADITYA DIPAK SADIGALETalegaon DhamdherePune
SHALINI KISANRAO SADIGALETalegaon DhamdherePune
GANESH KISANRAO SADIGALETalegaon DhamdherePune
SWATI GANESH SADIGALETalegaon DhamdherePune
VIKAS KISANRAO SADIGALETalegaon DhamdherePune
ARCHANA VIKAS SADIGALETalegaon DhamdherePune
YOGESH KISANRAO SADIGALETalegaon DhamdherePune
SUPRIYA YOGESH SADIGALETalegaon DhamdherePune
DEEPALI SHEKHAR RAUTTalegaon DhamdherePune
SAVITA BALKRUSHNA SADIGALETalegaon DhamdherePune
SANTOSHI PRATIK GONJARITalegaon DhamdherePune
SUJATA ATUL GONJARETalegaon DhamdherePune
SHUBHAM DIPAK SADIGALETalegaon DhamdherePune
AISHWARYA DIPAK SADIGALETalegaon DhamdherePune
RUKMINI DIPAK SADIGALETalegaon DhamdherePune
SUREKHA VIJAY SADIGALETalegaon DhamdherePune
AARATI MORESHVAR KHAMKERTalegaon DhamdherePune
SHRIKANT VIJAY SADIGALETalegaon DhamdherePune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITIAN REGIONAL DEVELOPMENT AUTHORITY, PUNE
Permissible FSI10454.07
Proposed, not sanctioned10,454 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBAJAR PETH NEAR GRAMPANCHAYAT OFFICE TALEGAON DHAMDHERE TAL SHIRUR DIST PUNE 412208
Estimated costRs 20.72 cr
Cost incurredRs 5.21 cr
Work done25.13%
BuildingWingEstimatedIncurred
A WINGNARs 3.14 crRs 2.50 cr
E WINGNARs 3.11 crRs 93.82 lakh
B WINGNARs 2.87 crRs 18.22 lakh
C WINGNARs 2.48 crRs 61.22 lakh
D WINGNARs 2.10 crRs 71.35 lakh
F WINGNARs 2.02 cr-
H WINGNARs 1.93 cr-
G WINGNARs 1.90 cr-
-NARs 1.17 crRs 25.50 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectROOFLINE DESIGN STUDIO
EngineerMANISH MARUTI RAUT
EngineerShubham Ankush Raut
EngineerHemant Laxman Gaikwad
Chartered AccountantCA UMESH VAMAN BADGUJAR
Chartered AccountantSPAK AND CO
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
OZONE INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2028

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Q1.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Q1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Q2.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Q1.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Q2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Final Uploded.pdf26 Sep 2025
Form 1File: Architect certificate form1.pdf30 Jul 2025
Form 2File: Form 2_Final.pdf30 Jul 2025
Form 3File: Form 3 Final.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD CIRCULAR.pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate form1.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Final.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 24-25.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 2024-25.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Q3.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 UPLOAD.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate_compressed.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold circular.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Upload12.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final signed.pdf15 May 2024
Other - TechnicalFile: Order 50 upload.pdf6 Feb 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf25 Jan 2024
Copy of the legal title reportFile: Legal and search report.pdf22 Jan 2024
Other - TechnicalFile: PMRDA to RERA mail.pdf17 Jan 2024
Declaration in FORM BFile: Form B.pdf6 Jan 2024
Other - LegalFile: Deviation for allotment.pdf6 Jan 2024
Building plan approvalFile: LAYOUT PLAN.pdf3 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT PLAN.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Shreenath Market City_Registration_compressed.pdf5 Dec 2023
Proforma of Agreement for saleFile: AFS COMPRESS.pdf4 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation for agreement compressed.pdf4 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Shreenath Market City Plinth.pdf1 Dec 2023
Details of encumbrances concerned to FinanceFile: No encumbrances.pdf27 Nov 2023
Details of encumbrances concerned to LegalFile: No encumbrances.pdf27 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details.pdf4 Nov 2023
Proforma of Allotment letterFile: Allotment Letter Draft SMC Ozone Infrastructure.pdf3 Nov 2023
Deviation Report with respect to Allotment letterFile: Ozone Infrastructure SMC Deviation Report.pdf3 Nov 2023
Other - TechnicalFile: ref carpet area statment.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shreenath Marketcity_Form 1.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf1 Nov 2023
PAN CardFile: pan card ozone infrastructure.pdf27 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200284831384_For_Asset_Based_Search_27_10_2023_11_54_56_895.pdf27 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other real estate project.pdf27 Oct 2023
Layout approvalFile: 01.pdf21 Oct 2023
Building plan approvalFile: 02.pdf21 Oct 2023
Building plan approvalFile: 03.pdf21 Oct 2023
Building plan approvalFile: 04.pdf21 Oct 2023
Building plan approvalFile: 05.pdf21 Oct 2023
Building plan approvalFile: 06.pdf21 Oct 2023
Building plan approvalFile: 07.pdf21 Oct 2023
Building plan approvalFile: 08.pdf21 Oct 2023
Building plan approvalFile: 09.pdf21 Oct 2023
Building plan approvalFile: 10.pdf21 Oct 2023
Building plan approvalFile: 11.pdf21 Oct 2023
Building plan approvalFile: 12.pdf21 Oct 2023
Building plan approvalFile: 13.pdf21 Oct 2023
Building plan approvalFile: 14.pdf21 Oct 2023
Building plan approvalFile: 15.pdf21 Oct 2023
Building plan approvalFile: 16.pdf21 Oct 2023
Building plan approvalFile: 17.pdf21 Oct 2023
Building plan approvalFile: 18.pdf21 Oct 2023

How this compares with Pune

11%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREENATH MARKET CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALEGAON DHAMDHERE NEAR GOVERNMENT HOSPITAL13,700+ in Pune

2 kmSHREENATH MARKET CITYCompleted 5Lapsed / revoked 3Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: OZONE INFRASTRUCTURE

OZONE INFRASTRUCTURE has 1 registration on MahaRERA, including SHREENATH MARKET CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHREENATH MARKET CITY is delayed beyond 1 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREENATH MARKET CITY?

The registered promoter entity is OZONE INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREENATH MARKET CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREENATH MARKET CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREENATH MARKET CITY?

The professionals named in the filing: Architect: ROOFLINE DESIGN STUDIO; Engineer: MANISH MARUTI RAUT; Engineer: Shubham Ankush Raut; Engineer: Hemant Laxman Gaikwad; Chartered Accountant: CA UMESH VAMAN BADGUJAR; Chartered Accountant: SPAK AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREENATH MARKET CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREENATH MARKET CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREENATH MARKET CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.