Home / Browse projects / Pune, Maharashtra / SUNRISE CITY
SUNRISE CITY
RG-MH-20965 · RERA P52100007353 · Last updated on MahaRERA portal: 24 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 46 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUNRISE CITY is a Others project by AKASH ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100007353 on 17 Aug 2017. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 46 months from the original filing. 85 of the 196 units on this registration are recorded sold or booked, and 23 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSUNRISE CITY
- TypeOthers
- Location
- Final Plot No.: GAT NO 3971 1 3971 2at Talegaon Dhamdhere
- Shirur
- Pune
- 412208
- Talegaon Dhamdhere
- Shirur
- Pune
- 412208
- Pincode412208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100007353
- ReraGenie IDRG-MH-20965
Builder
- NameAKASH ENTERPRISES
- Entity typePartnership
- PartnerDAWALMALIK MEERASAB SHAIKH
- Other registrations2 more →
- Completed1 of 3
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Aug 2017
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 1 May 2022)
- Buildings3 building records
- Documents filed71 files
Current status
Figures as on 24 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BUILDING | NA | 8 | 7 | 45 | 30 | 75 |
| B BUILDING | NA | 7 | 7 | 45 | 30 | 75 |
| C BUILDING | NA | 6 | 6 | 46 | 0 | 46 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.
A BUILDING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B BUILDING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C BUILDING9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed71
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A BUILDING | 14 | 14 | 28 |
| B BUILDING | 14 | 14 | 28 |
| C BUILDING | 1 | 14 | 15 |
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MACCHINDRA BABANRAO NARKE | Karve Nagar | Pune |
| SITARAM BABANRAO NARAKE | MOHAMMADWADI | Pune |
| SATYAWAN BABANRAO NARAKE | Talegaon Dhamdhere | Pune |
| SITABAI BABANRAO NARAKE | Talegaon Dhamdhere | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A BUILDING | NA | Rs 5.81 cr | Rs 5.81 cr |
| B BUILDING | NA | Rs 5.81 cr | Rs 5.81 cr |
| C BUILDING | NA | Rs 5.81 cr | Rs 29.07 lakh |
| - | NA | Rs 20.00 lakh | Rs 19.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJENDRA HARALE |
| Engineer | ACHYUT WATVE |
| Engineer | AKASH GONNAGAR |
| Chartered Accountant | CA Aditya Narendra Pathak |
| Partner | Role in project |
|---|---|
| AKASH ENTERPRISES | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir /Madam, The project development work of the project ‘SUNRISE CITY’ is underway and we are leaving no stone unturned to finish the project work at the earliest but due to various reasons and adverse circumstances we are unable to complete the project by 01/05/2022. We have done the revised estimate of time required for completion and we are confident to complete the project by 01/05/2023. Following are some of the important reasons for delay of SUNRISE CITY project. a. The Covid 19 Virus has caused a major disruption in the entire economy and the real estate sector is worst affect
Reason as filed by the promoterWe seek extension for the project for one year due to delay in construction activities. We have obtained consent of majority of sold apartment owners. Request you to grant the extension at earliest. We would be committed to finish the project within the extended due date of completion. With this application, we have attached consent of allottees, Form B duly notarized with updated Date of completion and other documents for your reference. Request you to go through the same and approve the extension
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to issues with procurement, unforeseen site conditions, coordination challenges, delays in obtaining the Occupancy Certificate (OC), and temporary financial constraints. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We are closely monitoring progress and taking all necessary steps to ensure timely completion. Given the circumstances, we kindly request an extension until 30th September 2025 to complete the project
Reason as filed by the promoterWe are currently unable to secure the Full Occupancy Certificate (OC) for the project owing to the pending issuance of the Lift No Objection Certificate (NOC) from the relevant department. This outstanding clearance has resulted in a delay in project completion. Therefore, the promoter respectfully requests an extension of the project timeline to accommodate the resolution of this matter.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502300 | Devidas Sakharam Dharade | Akash Enterprises | 07/07/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Jun 2022
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AR.pdf | 24 Jun 2026 |
| Withdrawal Update Form 2File: ER.pdf | 24 Jun 2026 |
| Withdrawal Update Form 3File: CA - March 26_.pdf | 24 Jun 2026 |
| Withdrawal Update Form 1File: AR .pdf | 22 Jun 2026 |
| Withdrawal Update Form 2File: ER .pdf | 22 Jun 2026 |
| Withdrawal Update Form 3File: CA certificate- Dec 25.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Sep 2025 Signed.pdf | 7 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Sep 2025 Signed.pdf | 7 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Sep 2025 Signed.pdf | 7 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 2025 Signed.pdf | 7 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 2025 Signed.pdf | 7 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 2025 Signed.pdf | 7 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 2025 Signed.pdf | 7 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 2025 Signed.pdf | 7 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 2025 Signed.pdf | 7 Nov 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 1.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sunrise City.pdf | 25 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 25 Mar 2025 |
| Other - TechnicalFile: Project PERT Overviw.pdf | 25 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- 23-24.pdf | 25 Mar 2025 |
| Declaration in FORM BFile: Form B.pdf | 12 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sunrise City as on December 2024.pdf | 12 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 - Dec-24_11zon.pdf | 12 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 12 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 22-23.pdf | 12 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2a 23-24.pdf | 12 Mar 2025 |
| Declaration in FORM BFile: FORM B - SIGN AND STAMP.pdf | 15 Jun 2023 |
| Other - TechnicalFile: DISCLOSURE OF SOLD UNSOLD_compressed.pdf | 15 Jun 2023 |
| Declaration in FORM BFile: FORM B - 10-06-2023.pdf | 10 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A updated.pdf | 10 Jun 2023 |
| Other - TechnicalFile: DISCOLSURE OF SOLD FLATS1.pdf | 10 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - LETTER HEAD.pdf | 3 Jun 2023 |
| Other - LegalFile: Form B - CHANDRASHEKHAR GONNAGAR_compressed.pdf | 3 Jun 2023 |
| Other - LegalFile: FORM B.pdf | 3 Jun 2023 |
| Other - FinanceFile: Sunrise City Form 3 March 2023 new_compressed.pdf | 2 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A.pdf | 29 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf | 29 Apr 2023 |
| Proforma of Agreement for saleFile: PROFORMA AGREEMENT TO SALE.pdf | 29 Apr 2023 |
| Other - TechnicalFile: DISCOLSURE OF SOLD FLATS - filled.pdf | 29 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf | 20 Apr 2023 |
| Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf | 20 Apr 2023 |
| Declaration about Commencement CertificateFile: COMMENCEMENT_DECLARATION.pdf | 6 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A_2020_COMPRESSED.pdf | 6 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A_2021_COMPRESSED.pdf | 6 Jun 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200238913360_For_Debtor_Based_Search_06_06_2022_11_32_59_833.pdf | 6 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_DECLARATION_COMPRESSED.pdf | 6 Jun 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION_CERTIFICATE_SUNRISE_CITY_BUILDING_A_PART.pdf | 6 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM_05_2018_2019.pdf | 24 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2020.pdf | 24 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021.pdf | 24 May 2022 |
| Certificates of CA (Form 5)File: FORM 5 AKASH ENTERPRISES.pdf | 15 Oct 2018 |
| PAN CardFile: Akash Enterprises PAN Card.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: Non Encumbrance Certificate.pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: N A Order (1).pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: PMRDA COMMENCEMENT LETTER.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Promoter Declaration Form B.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: FORM 3 RERA -CA CERTIFICATE.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: AGREEMENT Draft.pdf | 31 Jul 2017 |
| Layout approvalFile: 01.pdf | 30 Jul 2017 |
| Building plan approvalFile: 01.pdf | 30 Jul 2017 |
| Building plan approvalFile: 02.pdf | 30 Jul 2017 |
| Building plan approvalFile: 03.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: Legal Report.PDF | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 01.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 01.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 02.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 03.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUNRISE CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Talegaon Dhamdhere13,700+ in Pune
SHREENATH MARKET CITY
OZONE INFRASTRUCTURE
ECO VILLAS II
Saptarshi Properties
KAMAL BAUG
SAPTARSHI BUILDCON
shikrapur Trade Centre Phase I
Pride landmarks
AMRUTKALASH
AMRUTKALASH PROPERTIES
SAI ZION
SAI BUILTCON
Builder: AKASH ENTERPRISES
AKASH ENTERPRISES has 3 registrations on MahaRERA, including SUNRISE CITY and Imperial tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SUNRISE CITY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SUNRISE CITY is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUNRISE CITY?
The registered promoter entity is AKASH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUNRISE CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SUNRISE CITY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SUNRISE CITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUNRISE CITY?
The professionals named in the filing: Architect: RAJENDRA HARALE; Engineer: ACHYUT WATVE; Engineer: AKASH GONNAGAR; Chartered Accountant: CA Aditya Narendra Pathak. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUNRISE CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback