Home / Browse projects / Pune, Maharashtra / AMRUTKALASH

Registered No litigation declared Residential / Group Housing project

AMRUTKALASH

By AMRUTKALASH PROPERTIES

RG-MH-24524 · RERA P52100004921 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 60 months from the original
11 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 98%
101 of 164Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 199 documents Report an error

AMRUTKALASH is a Residential / Group Housing project by AMRUTKALASH PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100004921 on 9 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 60 months from the original filing. 63 of the 164 units on this registration are recorded sold or booked, and 11 of 33 construction stages are filed complete.

At a glance

Project

  • NameAMRUTKALASH
  • TypeResidential / Group Housing
  • Location
    • PUNE
    • Shikrapur
    • Shirur
    • 412208
  • Pincode412208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004921
  • ReraGenie IDRG-MH-24524

Builder

  • NameAMRUTKALASH PROPERTIES
  • Entity typePartnership
  • PartnersMEENA SUNIL DOMALE, MEENA SANJAY SATAV

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2022)
  • Buildings3 building records
  • Documents filed199 files

Current status

38%63 of 164 units booked
77.0%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA8756056
BNA8056056
ANA8052052

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 98%.

C42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes35%
Landscaping & Tree PlantingYes60%
Street LightingYes15%
Community BuildingsYes20%
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Dec 2025

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI7321.45
Proposed, not sanctioned7,147 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPRI BRANCH, JHAMTANI CHAMBERS 1ST FLOOR PUNE MUMBAI ROAD PIMPRI PUNE 411018
Estimated costRs 17.32 cr
Cost incurredRs 13.33 cr
Work done76.95%
BuildingWingEstimatedIncurred
CNARs 5.42 crRs 3.10 cr
BNARs 5.42 crRs 5.32 cr
ANARs 5.42 crRs 3.86 cr
-NARs 1.05 crRs 1.04 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP HARDIKAR AND ASSOCIATES YASHWANT HARDIKAR
EngineerPARAG CHOPDA P Chopda
EngineerPRAFULLA KIRTAKE
Chartered AccountantNitin B inamdar Inamdar
Chartered AccountantAmbar Shashikant Naik
Chartered AccountantPriyesh Jain
PartnerRole in project
AMRUTKALASH PROPERTIES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013338Dec 2022 → Dec 2025

Reason as filed by the promoterAmrutkalash Properties project was Registered with Rera No.P52100004921 the said project sanctioned by PMRDA on 11.07. 2017 due to post demonetization. The construction was started in 2018. There was slow booking hence, only one building i.e. 'B' Building (56 Flats ) started and it is now under completion. Building 'A' (52flats)and building 'C' (56flats) construction not started and also booking not taken for 'A' and 'C' building. Due to Covid 2019 and because of labour problem construction could not done in 2019- 2020 for building B. Now, we require extension for 'A' and 'C' building till Mar

EA12122518656Dec 2022 → Dec 2027

Reason as filed by the promoterThe Project Registration Certificate was obtained in 2017, due to post demonetization Booking of the Units were slow and same was continued in Covid-19 and post pandemic till 2020-2021 as the Project is in Rural / Suburban Area in Pune. Unfortunately, one of the Partner died in November 2021 and due to financial difficulties, the project construction work was slowed down. That as on date we have completed 90 percent work for Building B in the Project and we are also in process of obtaining Completion Certificate for B Building from the Local Authority i.e. Pune Metropolitan Region Development

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed199

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 199 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 CA 15072026.pdf13 Aug 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate 31032026.pdf30 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate 30062026.pdf30 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 31032026.pdf30 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 30062026.pdf30 Jul 2026
Withdrawal Update Form 3File: Form 3 CA certifficate 31032026.pdf30 Jul 2026
Withdrawal Update Form 3File: Form 3 CA certifficate 30062026.pdf30 Jul 2026
Withdrawal Update Form 1File: 3 Form 1 Quarter End Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: 3 Form 2 - Quarter End Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 3File: 3 Form 3 Quarter End Dec 2025.pdf17 Feb 2026
Form 1File: 2 Form 1 Quarter End Sep 2017.pdf22 Dec 2025
Form 2File: 2 Form 2 Quarter End Sep 2017.pdf22 Dec 2025
Form 3File: 2 Form 3 - Quarter End Sep 2017.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 March 2018 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 3 Form 1 - Quarter End Dec 2017.pdf22 Dec 2025
Form 2File: 3 Form 2 - Quarter End Dec 2017.pdf22 Dec 2025
Form 3File: 3 Form 3 - Quarter End Dec 2017.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 March 2018 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 4 Form 1 - Quarter End Mar 2018.pdf22 Dec 2025
Form 2File: 4 Form 2 - Quarter End Mar 2018.pdf22 Dec 2025
Form 3File: 4 Form 3 - Quarter End Mar 2018.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 March 2018 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 1 Form 1 Quarter End June 2018.pdf22 Dec 2025
Form 2File: 1 Form 2 - Quarter End June 2018.pdf22 Dec 2025
Form 3File: 1 Form 3 - Quarter End June 2018.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 1 June 2018 Sold Unsold Invenotry.pdf22 Dec 2025
Form 1File: 2 Form 1 Quarter End Sep 2018.pdf22 Dec 2025
Form 2File: 2 Form 2 - Quarter End Sep 2018.pdf22 Dec 2025
Form 3File: 2 Form 3 - Quarter End Sep 2018.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 2 Sept 2018 Sold Unsold Invenotry.pdf22 Dec 2025
Form 1File: 3 Form 1 Quarter End Dec 2018.pdf22 Dec 2025
Form 2File: 3 Form 2 - Quarter End Dec 2018.pdf22 Dec 2025
Form 3File: 3 Form 3 - Quarter End Dec 2018.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 3 Dec 2018 Sold Unsold Invenotry.pdf22 Dec 2025
Form 1File: 4 Form 1 - Quarter End Mar 2019.pdf22 Dec 2025
Form 2File: 4 Form 2 - Quarter End Mar 2019.pdf22 Dec 2025
Form 3File: 4 Form 3 - Quarter End Mar 2019.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 March 2019 Sold Unsold Invenotry.pdf22 Dec 2025
Form 1File: 1 Form 1 - Quarter End June 2019.pdf22 Dec 2025
Form 3File: 1 Form 3 Quarter End June 2019.pdf22 Dec 2025
Form 2File: 1 Form 2 - Quarter End June 2019.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 1 June 2019 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 2 Form 1 - Quarter End Sep 2019.pdf22 Dec 2025
Form 2File: 2 Form 2 - Quarter End Sep 2019.pdf22 Dec 2025
Form 3File: 2 Form 3 - Quarter End Sep 2019.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 2 Sept 2019 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 3 Form 1 - Quarter End Dec 2019.pdf22 Dec 2025
Form 2File: 3 Form 2 - Quarter End Dec 2019.pdf22 Dec 2025
Form 3File: 3 Form 3 - Quarter End Dec 2019.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 3 Dec 2019 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 4 Form 1 - Quarter End Mar 2020.pdf22 Dec 2025
Form 2File: 4 Form 2 - Quarter End Mar 2020.pdf22 Dec 2025
Form 3File: 4 Form 3 - Quarter End Mar 2020.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 March 2020 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 1 Form 1 Quarter End June 2020.pdf22 Dec 2025
Form 2File: 1 Form 2 - Quarter End June 2020.pdf22 Dec 2025
Form 3File: 1 Form 3 - Quarter End June 2020.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 1 June 2020 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 2 Form 1 - Quarter End Sept 2020.pdf22 Dec 2025
Form 2File: 2 Form 2 - Quarter End Sep 2020.pdf22 Dec 2025
Form 3File: 2 Form 3 - Quarter End Sep 2020.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 2 Sept 2020 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 3 Form 1 Quarter End Dec 2020.pdf22 Dec 2025
Form 2File: 3 Form 2 - Quarter End Dec 2020.pdf22 Dec 2025
Form 3File: 3 Form 3 - Quarter End Dec 2020.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 3 Dec 2020 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 4 Form 1 - Quarter End Mar 2021.pdf22 Dec 2025
Form 2File: 4 Form 2 - Quarter End Mar 2021.pdf22 Dec 2025
Form 3File: 4 Form 3 - Quarter End Mar 2021.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 March 2021 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 1 Form 1 - Quarter End June 2021.pdf22 Dec 2025
Form 2File: 1 Form 2 Quarter End June 21.pdf22 Dec 2025
Form 3File: 1 Form 3 - Quarter End June 2021.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 1 June 2021 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 2 Form 1 - Quarter End Sep 2021.pdf22 Dec 2025
Form 2File: 2 Form 2 - Quarter End Sep 2021.pdf22 Dec 2025
Form 3File: 2 Form 3 - Quarter End Sep 2021.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 2 Sept 2021 Sold Unsold Inventory.pdf22 Dec 2025
Form 1File: 3 Form 1 - Quarter End Dec 2021.pdf22 Dec 2025
Form 2File: 3 Form 2 Quarter End Dec 21.pdf22 Dec 2025

How this compares with Pune

38%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 60 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMRUTKALASH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmAMRUTKALASHCompleted 11Lapsed / revoked 21Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: AMRUTKALASH PROPERTIES

AMRUTKALASH PROPERTIES has 1 registration on MahaRERA, including AMRUTKALASH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AMRUTKALASH is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMRUTKALASH?

The registered promoter entity is AMRUTKALASH PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMRUTKALASH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMRUTKALASH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMRUTKALASH?

The professionals named in the filing: Architect: SANDEEP HARDIKAR AND ASSOCIATES YASHWANT HARDIKAR; Engineer: PARAG CHOPDA P Chopda; Engineer: PRAFULLA KIRTAKE; Chartered Accountant: Nitin B inamdar Inamdar; Chartered Accountant: Ambar Shashikant Naik; Chartered Accountant: Priyesh Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMRUTKALASH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMRUTKALASH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMRUTKALASH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.