Home / Browse projects / Satara, Maharashtra / VIJAYANAND RESIDENCY
VIJAYANAND RESIDENCY
RG-MH-25890 · RERA P52700013273 · Last updated on MahaRERA portal: 20 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 23 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VIJAYANAND RESIDENCY is a Residential / Group Housing project by RAVINDRA ANAND WAIKAR in Satara, Maharashtra, registered with MahaRERA as P52700013273 on 21 Sep 2017. Possession was promised by 11 Nov 2024 and is now 23 months past that date.
At a glance
Project
- NameVIJAYANAND RESIDENCY
- TypeResidential / Group Housing
- Location
- Viratnagar Road
- Viratnagar
- Songirwadi (Rural) (CT)
- Wai
- Satara
- 412803
- Pincode412803
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700013273
- ReraGenie IDRG-MH-25890
Builder
- NameRAVINDRA ANAND WAIKAR
- Entity typeIndividual
- GSTIN27AANPW8683Q1Z6
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on21 Sep 2017
- Promised completion11 Nov 2024
- Revised completionNone
- Buildings1 building record
- Documents filed138 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VIJAYANAND RESIDENCY | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.
VIJAYANAND RESIDENCY: 22% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 70% |
| Podiums (if any) | 0% |
| Plinth | 70% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAVINDRA WAIKAR | Songirwadi (Rural) (CT) | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KAILASH SADASHIV JAMDADE |
| Architect | Mohan Gopal Katkar |
| Engineer | RAMDAS R JAGTAP |
| Engineer | SHUBHAM R WAIKAR |
| Chartered Accountant | S P PATIL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| RAVINDRA ANAND WAIKAR | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed138
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect form 1 april 25.pdf | 20 Apr 2025 |
| Certificates of CA (Form 3)File: ca form 3 ut april 25.pdf | 20 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer 2 ut april 25.pdf | 20 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 Jan 25.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: Ca form 3ut jan25.pdf | 4 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Form 2 ut jan 25.pdf | 4 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1 oct 24.pdf | 28 Jan 2025 |
| Certificates of CA (Form 3)File: Ca form 3 ut oct 24.pdf | 28 Jan 2025 |
| Certificates of CA (Form 5)File: form 5 ca annual report 23-24.pdf | 28 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate form 2 ut oct 24.pdf | 28 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1 july 24.pdf | 25 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 ut engineer.pdf | 22 Jul 2024 |
| Certificates of CA (Form 3)File: form 3 ut ca jul24.pdf | 22 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form arpril 24.pdf | 7 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner form 2 ut april 24.pdf | 7 May 2024 |
| Certificates of CA (Form 3)File: Ca form 3ut april 24.pdf | 7 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 jan 24.pdf | 13 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Form ut 2 feb2024.pdf | 13 Feb 2024 |
| Certificates of CA (Form 3)File: ca form 3 ut jan 24.pdf | 13 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 oct 23.pdf | 21 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Form 2 ut oct 23.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: CA FORM 3Ut oct 23.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 CA JULY 23.pdf | 18 Sep 2023 |
| Certificates of CA (Form 5)File: Annual Report form 5 22-23 (1).pdf | 18 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 july 2023.pdf | 6 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Form 2 July 2023.pdf | 6 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1 april 23.pdf | 1 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginerr Certificate form 2 April 23.pdf | 1 May 2023 |
| Certificates of CA (Form 3)File: Ca certificate form 3 april 23.pdf | 1 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate jan 23.pdf | 26 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer form jan 2023.pdf | 26 Mar 2023 |
| Certificates of CA (Form 3)File: ca form 3ut jan 23.pdf | 26 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Oct 2022.pdf | 21 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Oct Engineer Certificate.pdf | 21 Nov 2022 |
| Certificates of CA (Form 3)File: CA OCT 2022.pdf | 21 Nov 2022 |
| Certificates of CA (Form 3)File: form 3ut ca.pdf | 21 Jul 2022 |
| Certificates of CA (Form 5)File: Form 5 annual report.pdf | 21 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect July 2022.pdf | 10 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate July2022.pdf | 10 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate July2022.pdf | 10 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Jan 2022.pdf | 9 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect April 2022.pdf | 9 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Jan2022.pdf | 9 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate April2022.pdf | 9 May 2022 |
| Certificates of CA (Form 3)File: CA FORM jan2022.pdf | 9 May 2022 |
| Certificates of CA (Form 3)File: CA FORM APRIL2022.pdf | 9 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate April 2021.pdf | 5 Nov 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate July 2021.pdf | 5 Nov 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Oct 2021.pdf | 5 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate April 2021.pdf | 24 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE JULY 2021.pdf | 24 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Oct 2021.pdf | 24 Oct 2021 |
| Certificates of CA (Form 3)File: CA CERTIFICATE APRIL 2021-227.pdf | 24 Oct 2021 |
| Certificates of CA (Form 3)File: CA CERTIFICATE JULY 2021-496.pdf | 24 Oct 2021 |
| Certificates of CA (Form 3)File: CA CERTIFICATE OCT 2021-209.pdf | 24 Oct 2021 |
| Certificates of CA (Form 5)File: CA FORM 5 2020- 2021.pdf | 24 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf | 6 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate April 2020.pdf | 3 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate april 2020.pdf | 3 Feb 2021 |
| Certificates of CA (Form 3)File: Ca certificate april 2020_compressed.pdf | 3 Feb 2021 |
| Certificates of CA (Form 5)File: ca form 5 2019-2020.pdf | 3 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architecture certificate oct 2019_compressed.pdf | 2 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architecture certificate jan 20_compressed.pdf | 2 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate oct 19_compressed.pdf | 2 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate jan 20_compressed.pdf | 2 Nov 2020 |
| Certificates of CA (Form 3)File: ca certificate oct 19_compressed.pdf | 2 Nov 2020 |
| Certificates of CA (Form 3)File: ca certificate jan 20_compressed.pdf | 2 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architech certificate june 2019.pdf | 18 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate june 2019.pdf | 18 Jan 2020 |
| Certificates of CA (Form 3)File: ca certificate june 2019.pdf | 18 Jan 2020 |
| Certificates of CA (Form 5)File: CA FORM 5 SEPT 19.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architech certificate.pdf | 5 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf | 5 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 5 Jul 2019 |
| Certificates of CA (Form 3)File: ca certificate.pdf | 5 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 9 Apr 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 9 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architech 123.pdf | 8 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERT JUNE 18.pdf | 8 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERT SEPT 18.pdf | 8 Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 138 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep VIJAYANAND RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Viratnagar1,100+ in Satara
Filed coordinates, straight-line distance. 13 registered projects within 2 km.
SEVEN HILLS
VENKATESWARAA DEVELOPERS PVT LTD
BHADRESHWAR CITY
JYOTI CONSTRUCTIONS
SAKSHI VISHWA PHASE II
M/S SAKSHI NINE BLOSSOM DEVELOPERS
SAKSHI NISARG
SAKSHI CONSTRUCTION ANIL LAXMAN SAWANT
Soil Villa
Soil Properties & Infra India Ltd.
SAKSHISHILP
SAKSHI SAMUH DEVELOPERS
See every Satara project, with the district possession charts
Builder: RAVINDRA ANAND WAIKAR
RAVINDRA ANAND WAIKAR has 1 registration on MahaRERA, including VIJAYANAND RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What does it mean that VIJAYANAND RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if VIJAYANAND RESIDENCY is delayed beyond 11 Nov 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VIJAYANAND RESIDENCY?
The registered promoter entity is RAVINDRA ANAND WAIKAR, an individual as per the filing. Its GSTIN 27AANPW8683Q1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VIJAYANAND RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VIJAYANAND RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VIJAYANAND RESIDENCY?
The professionals named in the filing: Architect: KAILASH SADASHIV JAMDADE; Architect: Mohan Gopal Katkar; Engineer: RAMDAS R JAGTAP; Engineer: SHUBHAM R WAIKAR; Chartered Accountant: S P PATIL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VIJAYANAND RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback