Red flags

  • Litigation declared, 4 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 25Construction stages doneacross 4 buildings; furthest along: Excavation, 40%
55 of 135Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

VIHANG AVAANA is a Mixed project by Reyanshp Realty LLP in Thane, Maharashtra, registered with MahaRERA as PM1330002500856 on 20 Sep 2025. Possession is promised by 31 Dec 2030. 80 of the 135 units on this registration are recorded sold or booked, and 0 of 25 construction stages are filed complete.

At a glance

Project

  • NameVIHANG AVAANA
  • TypeMixed
  • Location
    • GHODBUNDER ROAD
    • GHODBUNDER
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1330002500856
  • ReraGenie IDRG-MH-65471

Builder

  • NameReyanshp Realty LLP
  • Entity typeLimited Liability Partnership
  • LLPINABB-1616
  • GSTIN27ABFFR1248H1Z6
  • PartnersPURVESH PRATAP SARNAIK, PARISHA PRATAP SARNAIK
  • Other registrations2 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2025First promiseDec 2031Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Sep 2025
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 31 Dec 2031)
  • Buildings4 building records
  • Documents filed27 files

Current status

59%80 of 135 units booked
6.2%Work done, per cost certificate

Figures as on 7 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
01 (MECHANICAL CAR PARKING TOWER)01(Mechanical car parking Tower)00000
02 (MECHANICAL CAR PARKING TOWER)02(Mechanical car parking Tower)00000
BLDG. (01)VIHANG AVAANA ARC76066
BLDG (02)VIHANG AVAANA T137371245129

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 25 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 40%.

BLDG. (01) · wing VIHANG AVAANA ARC4%
ActivityProgress
Excavation40%
Basement (if any)0%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG (02) · wing VIHANG AVAANA T15%
ActivityProgress
Excavation40%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
01 (MECHANICAL CAR PARKING TOWER) · wing 01(Mechanical car parking Tower)2%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
02 (MECHANICAL CAR PARKING TOWER) · wing 02(Mechanical car parking Tower)2%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed89

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots89
Open Space7
Stilt / Ground14
Mechanical68
BuildingOpen SpaceStilt / GroundMechanicalTotal
BLDG. (01) VIHANG AVAANA ARC014014
BLDG (02) VIHANG AVAANA T17007
01 (MECHANICAL CAR PARKING TOWER) 01(Mechanical car parking Tower)002828
02 (MECHANICAL CAR PARKING TOWER) 02(Mechanical car parking Tower)004040

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,850 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2025

Approvals and building plan

Sanctioning authorityMIRA BHAYANDAR MUNICIPAL CORPORATION
Permissible FSI11634.9
Proposed, not sanctioned11,605 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRASHMI PRIME CORNER 1,SHOP NO.10-13OPP KANAKIA POLICE STATIONBEVERLY PARK, MIRA ROAD EAST
Estimated costRs 58.27 cr
Cost incurredRs 3.61 cr
Work done6.2%
BuildingWingEstimatedIncurred
BLDG (02)VIHANG AVAANA T1Rs 45.00 crRs 2.01 cr
BLDG. (01)VIHANG AVAANA ARCRs 7.20 crRs 1.16 cr
01 (MECHANICAL CAR PARKING TOWER)01(Mechanical car parking Tower)Rs 3.60 crRs 26.40 lakh
02 (MECHANICAL CAR PARKING TOWER)02(Mechanical car parking Tower)Rs 1.70 crRs 18.38 lakh
-NARs 76.83 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnish & Associates
EngineerGaurav Mishra
EngineerEpicons Consultants Pvt. Ltd.
Chartered AccountantLILANI & CO.
Chartered AccountantR C Jain & Associates LLP
Chartered AccountantVinod Kumar Jain
PartnerRole in project
Reyanshp Realty LLP-

Litigation declared4

CaseCourtStatus
Special Civil Suit 37/2025/2025Civil CourtOngoing
Special Civil Suit 07/2025/2025Civil Court ThaneOngoing
Appeal from order No.212/2025/2025High Court MumbaiOngoing
appeal from Order stamp no. 26524 of 2025/2025High Court MumbaiOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Nov 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 20260608 Vihang Avaana - form 1 - signed.pdf7 Jul 2026
Withdrawal Update Form 1File: 20260608 Vihang Avaana - form 1 - signed.pdf7 Jul 2026
Withdrawal Update Form 2File: 20260605 FORM 2 - VIHANG AVAANA.pdf7 Jul 2026
Withdrawal Update Form 2File: 20260605 FORM 2 - VIHANG AVAANA.pdf7 Jul 2026
Withdrawal Update Form 3File: CA Copy Form 3 of AVAANA _Jan to March 2026-compressed.pdf7 Jul 2026
Withdrawal Update Form 3File: CA Copy Form 3 of AVAANA _Jan to March 2026-compressed.pdf7 Jul 2026
Withdrawal Update Form 1File: 20260227 VIHANG AVAANA FORM 1 - OCT TO DEC 2025 (1).pdf24 Mar 2026
Withdrawal Update Form 1File: 20260227 VIHANG AVAANA FORM 1 - OCT TO DEC 2025 (1).pdf24 Mar 2026
Withdrawal Update Form 2File: 20260227 VIHANG AVAANA FORM 2 - OCT TO DEC 2025.pdf24 Mar 2026
Withdrawal Update Form 2File: 20260227 VIHANG AVAANA FORM 2 - OCT TO DEC 2025.pdf24 Mar 2026
Withdrawal Update Form 3File: Form3 of AVAANA _OCT- DEC_2025 (1)_compressed.pdf24 Mar 2026
Withdrawal Update Form 3File: Form3 of AVAANA _OCT- DEC_2025 (1)_compressed.pdf24 Mar 2026
Withdrawal Update Form 1File: 20250905 SNO 101 - ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf19 Nov 2025
Withdrawal Update Form 2File: 20251105 ENGINEER CERTIFICATE 30092025.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 - Avaana.pdf19 Nov 2025
Commencement certificateFile: New revised CC.pdf17 Nov 2025
Building plan approvalFile: MBMCB_7008_2025_0044_AutoDCR (1).pdf17 Nov 2025
Building plan approvalFile: New revised CC.pdf4 Nov 2025
Building plan approvalFile: MBMCB_7008_2025_0044_AutoDCR.pdf4 Nov 2025
Withdrawal Update Form 16 Oct 2025
Withdrawal Update Form 26 Oct 2025
Withdrawal Update Form 3File: Form 3 - Avaana.pdf6 Oct 2025
Declaration and undertaking (Annexure A)File: Declaration cum undertaking annexure A.pdf10 Sep 2025
Building plan approvalFile: Final CC.pdf10 Sep 2025
Layout approvalFile: MBMCB_7008_2025_0044_AutoDCR (1).pdf29 Aug 2025
Building plan approvalFile: MBMCB_7008_2025_0044_AutoDCR (1).pdf29 Aug 2025
Building plan approval or NA orderFile: Avaana_NA ORDER _DTD20-05-2025.pdf29 Aug 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VIHANG ATHARVAP51700079063GHODBUNDER, Thane217Feb 2025OngoingDec 2029Not due yet
VIHANG LUXURIAP51700049126MIRE VILLAGE, Thane744Feb 2023OngoingDec 2027Not due yet

How this compares with Thane

59%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIHANG AVAANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHODBUNDER7,600+ in Thane

2 kmVIHANG AVAANACompleted 91Lapsed / revoked 70Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 246 registered projects within 2 km.

Builder: Reyanshp Realty LLP

REYANSHP REALTY LLP has 3 registrations on MahaRERA, including VIHANG LUXURIA and VIHANG ATHARVA. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VIHANG AVAANA is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIHANG AVAANA?

The registered promoter entity is Reyanshp Realty LLP, a limited liability partnership as per the filing. Its LLPIN ABB-1616 and GSTIN 27ABFFR1248H1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIHANG AVAANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIHANG AVAANA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIHANG AVAANA?

The professionals named in the filing: Architect: Anish & Associates; Engineer: Gaurav Mishra; Engineer: Epicons Consultants Pvt. Ltd.; Chartered Accountant: LILANI & CO.; Chartered Accountant: R C Jain & Associates LLP; Chartered Accountant: Vinod Kumar Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIHANG AVAANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIHANG AVAANA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIHANG AVAANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.