Home / Browse projects / Thane, Maharashtra / VIHANG ATHARVA

Registered Litigation declared Others project

VIHANG ATHARVA

By REYANSHP REALTY LLP

RG-MH-23751 · RERA P51700079063 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
8 of 44Construction stages doneacross 4 buildings; furthest along: Stilt Floor, 80%
41 of 217Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

VIHANG ATHARVA is a Others project by REYANSHP REALTY LLP in Thane, Maharashtra, registered with MahaRERA as P51700079063 on 3 Feb 2025. Possession is promised by 31 Dec 2029. 176 of the 217 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.

At a glance

Project

  • NameVIHANG ATHARVA
  • TypeOthers
  • Location
    • GHODBUNDER ROAD
    • GHODBUNDER
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700079063
  • ReraGenie IDRG-MH-23751

Builder

  • NameREYANSHP REALTY LLP
  • Entity typePartnership
  • Other registrations2 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings4 building records
  • Documents filed66 files

Current status

81%176 of 217 units booked
60.8%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING BNA227512
WING CNA2241418
WING DNA25241786184
WING FNA22033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 80%.

WING B24%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor30%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D27%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING F37%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered2
Open Space88
BuildingClosed/CoveredOpen SpaceTotal
WING B04040
WING C11819
WING D13031

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,557 sq m
Land owned byThe promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2025
LandownerVillageDistrict
REYANSHP REALTY LLPThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation
Permissible FSI12865.09
Proposed, not sanctioned11,382 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRASHMI PRIME CORNER 1,SHOP NO.10-13OPP KANAKIA POLICE STATIONBEVERLY PARK, MIRA ROAD EAST
Estimated costRs 47.09 cr
Cost incurredRs 28.65 cr
Work done60.83%
BuildingWingEstimatedIncurred
WING DNARs 32.52 crRs 21.79 cr
WING BNARs 5.28 crRs 1.80 cr
WING CNARs 5.14 crRs 3.45 cr
-NARs 2.70 crRs 86.68 lakh
WING FNARs 1.45 crRs 74.18 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnish & Associates Mr Anil P Motiramani
ArchitectAnish & Associates
EngineerEpicons Consultants Pvt Ltd
EngineerGaurav Mishra
Chartered AccountantLilani & Co
Chartered AccountantR C Jain & Associates LLP
Chartered AccountantLILANI & CO.
Chartered AccountantVINOD KUMAR JAIN
PartnerRole in project
REYANSHP REALTY LLP-

Litigation declared2

CaseCourtStatus
317/2021THANEWRITTEN STATEMENT AND SAY
19622/2024HIGH COURT MUMBAIADMISSION

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: VIHANG ATHARVA FORM 1 OCT to DEC 2025.pdf6 Jun 2026
Withdrawal Update Form 1File: VIHANG ATHARVA FORM 1 OCT to DEC 2025.pdf6 Jun 2026
Withdrawal Update Form 2File: Application Form2 atharva - as per changes on 1-4-2026 (1).pdf6 Jun 2026
Withdrawal Update Form 2File: Application Form2 atharva - as per changes on 1-4-2026 (1).pdf6 Jun 2026
Withdrawal Update Form 3File: Form 3 _ Atharva _OCT - DEC 2025.pdf6 Jun 2026
Withdrawal Update Form 3File: Form 3 _ Atharva _OCT - DEC 2025.pdf6 Jun 2026
Withdrawal Update Form 1File: 20260106 ATHARVA WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf23 Feb 2026
Withdrawal Update Form 1File: 20260106 ATHARVA WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf23 Feb 2026
Withdrawal Update Form 2File: 20260210 Atharva form 2 July Sept 2025 (1).pdf23 Feb 2026
Withdrawal Update Form 2File: 20260210 Atharva form 2 July Sept 2025 (1).pdf23 Feb 2026
Withdrawal Update Form 3File: Final Form 3 for Vihang Atharva as on 300925 (2)_compressed.pdf23 Feb 2026
Withdrawal Update Form 3File: Final Form 3 for Vihang Atharva as on 300925 (2)_compressed.pdf23 Feb 2026
Form 1File: MArch 2025 RERA ATHARVA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf6 Oct 2025
Form 2File: 20250403 RERA ATHARVA ENGINEER'S CERTIFICATE .pdf6 Oct 2025
Form 3File: Form 3 as on 31 March Atharva Project.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: Form 3 as on 31 March Atharva Project.pdf6 Oct 2025
Self-declaration of Quarterly ProgressFile: MArch 2025 ATHARVA FORM 2A QUALITY ASSURANCE CERTIFICATE.pdf6 Oct 2025
Withdrawal Update Form 1File: 20250707 ATHARVA RERA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf6 Oct 2025
Withdrawal Update Form 1File: 20250707 ATHARVA RERA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf6 Oct 2025
Withdrawal Update Form 1File: 20250707 ATHARVA RERA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf6 Oct 2025
Withdrawal Update Form 1File: 20250707 ATHARVA RERA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf6 Oct 2025
Withdrawal Update Form 2File: form -2 ENGR CERT FOR COST vihang atharva.pdf6 Oct 2025
Withdrawal Update Form 2File: form -2 ENGR CERT FOR COST vihang atharva.pdf6 Oct 2025
Withdrawal Update Form 2File: form -2 ENGR CERT FOR COST vihang atharva.pdf6 Oct 2025
Withdrawal Update Form 2File: 20250903 atharva ENGINEERS CERTIFICATE.pdf6 Oct 2025
Withdrawal Update Form 3File: Form 3 as on 31.03.25 Atharva Project (3).pdf6 Oct 2025
Withdrawal Update Form 3File: Form 3 as on 31.03.25 Atharva Project (3).pdf6 Oct 2025
Withdrawal Update Form 3File: Form 3 as on 31.03.25 Atharva Project (3).pdf6 Oct 2025
Withdrawal Update Form 3File: 2025-Jun 25 Form 3 Vihang Atharva_compressed.pdf6 Oct 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 20250401 ATHARVA FORM 2A QUALITY ASSURANCE CERTIFICATE.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20250403 RERA ATHARVA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE_compressed.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20250403 RERA ATHARVA ENGINEER'S CERTIFICATE .pdf3 Apr 2025
Declaration in FORM BFile: AFFIDAVIT CUM- DECLARATION FORM B.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Reyanshp Realty LLP_ATHARVA.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form -2 ENGR CERT FOR COST vihang atharva.pdf31 Jan 2025
Other - LegalFile: INDEX -2 WITH REGISTRATION RECEIPT - Martin Correa ANDatap Sarnaik TNN4-1995-2021 Date 05-31 Jan 2025
Other - LegalFile: POA reg no 1996- dt- 5-2-2021 compressed MARTIN CORREA.pdf31 Jan 2025
Declaration about Commencement CertificateFile: declaration about commencement certificate FORMAT- D.pdf31 Jan 2025
Other - TechnicalFile: declaration FOR WING- G.pdf31 Jan 2025
Details of encumbrances concerned to FinanceFile: Atharva NON ENCUMBERANCE CERTIFICATE LEGAL.pdf29 Jan 2025
Details of encumbrances concerned to LegalFile: Atharva NON ENCUMBERANCE CERTIFICATE LEGAL.pdf29 Jan 2025
Deviation Report with respect to model copy of AgreementFile: deviation report AFS-29-01-2025.pdf29 Jan 2025
Proforma of Agreement for saleFile: AGREEMENT FOR SALE-VIHANG ATHARVA-29-01-2025.pdf29 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC WITH SHUDDHIPATRA.pdf27 Jan 2025
Other - TechnicalFile: Annexure A_Declarion-cum-Undertaking_Atharva_Signed.pdf27 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 01-Format 'B'-1.pdf27 Jan 2025
Details of encumbrances concerned to FinanceFile: NON ENCUMBERANCE CERTIFICATE - FINANCE - 25-01-2025.pdf25 Jan 2025
CERSAI detailsFile: cersai UNDERTAKING - 25-01-2025.pdf25 Jan 2025
Details of encumbrances concerned to LegalFile: NON ENCUMBERANCE CERTIFICATE - FINANCE - 25-01-2025.pdf25 Jan 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER -ATHARVA.pdf23 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation Report for Vihang Atharva.pdf23 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: format a.pdf22 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Parisha Sarnaik.pdf18 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSER OF INTEREST- PRATAP SARNAIK.pdf18 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSER OF INTERST PURVESH PRATAP SARNAIK.pdf15 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: disclouser for secured and unsecured finance.pdf15 Jan 2025
Building plan approvalFile: PLANS.pdf9 Jan 2025
Layout approvalFile: PLANS.pdf9 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part1.pdf9 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part2.pdf9 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part3.pdf9 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part4.pdf9 Jan 2025
Copy of Layout Approval (in case of layout)File: PLANS.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PERCENTAGE WORK COMPLETE CERTIFICATE.pdf9 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PLANS.pdf9 Jan 2025
PAN CardFile: REYANSHP REALTY LLP - PAN CARD.pdf27 Dec 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VIHANG LUXURIAVillage Mire. Survey 45 Hissa 1. survey 65 Hissa 1B. survey 64 Hissa 2A.530OngoingDec 2027Dec 2027

How this compares with Thane

81%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIHANG ATHARVA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHODBUNDER7,600+ in Thane

2 kmVIHANG ATHARVACompleted 36Lapsed / revoked 27Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: REYANSHP REALTY LLP

REYANSHP REALTY LLP has 3 registrations on MahaRERA, including VIHANG LUXURIA and VIHANG ATHARVA. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VIHANG ATHARVA is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIHANG ATHARVA?

The registered promoter entity is REYANSHP REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIHANG ATHARVA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIHANG ATHARVA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIHANG ATHARVA?

The professionals named in the filing: Architect: Anish & Associates Mr Anil P Motiramani; Architect: Anish & Associates; Engineer: Epicons Consultants Pvt Ltd; Engineer: Gaurav Mishra; Chartered Accountant: Lilani & Co; Chartered Accountant: R C Jain & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIHANG ATHARVA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIHANG ATHARVA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIHANG ATHARVA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.