Home / Browse projects / Mumbai Suburban, Maharashtra / Vighnaharta Enclave

Registered No litigation declared Residential / Group Housing project

Vighnaharta Enclave

By Vighnaharta Heights Private Limited

RG-MH-31125 · RERA P51800079459 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Rs 14.00 crore secured on the land, in favour of SMFG India Home Finanace Co Ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 10Construction stages donefurthest along: Stilt Floor, 40%
145 of 158Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Vighnaharta Enclave is a Residential / Group Housing project by Vighnaharta Heights Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079459 on 7 Mar 2025. Possession is promised by 31 Dec 2028. 13 of the 158 units on this registration are recorded sold or booked, and 2 of 10 construction stages are filed complete.

At a glance

Project

  • NameVighnaharta Enclave
  • TypeResidential / Group Housing
  • Location
    • CTS No- 828 (Pt)
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079459
  • ReraGenie IDRG-MH-31125

Builder

  • NameVighnaharta Heights Private Limited
  • Entity typeCompany
  • GSTIN27AAGCV1261P2ZU
  • DirectorsAjit Sakharam Chavan, Shreyasi Ajit Chavan
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Mar 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Current status

8%13 of 158 units booked
24.8%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A and Wing BNA18161580158

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 10 construction stages are filed complete. The stage furthest along is Stilt Floor, at 40%.

Wing A and Wing B: 24% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor40%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,301 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofSMFG India Home Finanace Co Ltd
Secured amountRs 14.00 crore
CERSAI search filedYes
Declared on24 Mar 2026
LandownerVillageDistrict
Subhash Nagar Suhas Co Op Housing Society LimitedVikhroliMumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI7449.86
Proposed, not sanctioned7,450 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSai Suman CHS,CTC No 252, Near Reliance Fresh, Station Road, Vikhroli East, Mumbai - 400083
Estimated costRs 32.00 cr
Cost incurredRs 7.94 cr
Work done24.83%
BuildingWingEstimatedIncurred
Wing A and Wing BNARs 30.40 crRs 7.94 cr
-NARs 1.60 cr-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Ellora Project Consultants Pvt Ltd
ArchitectEllora Project Consultants Pvt Ltd
EngineerM/s. Ira Structural Consultants
EngineerSK Consultants & Engineers
EngineerSuraj R Sonaje
EngineerROHIT RAVINDRA VARMA
Chartered AccountantN B Sayed & Associates
Chartered AccountantJainam Doshi & associates
Chartered AccountantVUDN & Associates LLP
PartnerRole in project
Vighnaharta Heights Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1.pdf13 Aug 2026
Withdrawal Update Form 2File: 2.pdf13 Aug 2026
Withdrawal Update Form 3File: 3.pdf13 Aug 2026
Withdrawal Update Form 1File: Form 1 - Vighnaharta Enclave as on June 2026.pdf6 Aug 2026
Withdrawal Update Form 2File: Form 2 - Vighnaharta Enclave as on June 2026 (1).pdf6 Aug 2026
Withdrawal Update Form 3File: Form 3 - Vighnaharta Enclave as on June 2026.pdf6 Aug 2026
Withdrawal Update Form 1File: Form 1 - Vighnaharta Enclave as on June 2026.pdf5 Aug 2026
Withdrawal Update Form 2File: Form 2 - Vighnaharta Enclave as on June 2026.pdf5 Aug 2026
Withdrawal Update Form 3File: Form 3 - Vighnaharta Enclave as on June 2026.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1 - Vighnaharta Enclave as on March 2026.pdf4 Aug 2026
Withdrawal Update Form 2File: Form 2 - Vighnaharta Enclave as on March 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 - Vighnaharta Enclave as on March 2026.pdf4 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf26 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 Bldg 47 24-25.pdf25 Mar 2026
Layout approvalFile: Latest Plan-1.pdf24 Mar 2026
Building plan approvalFile: Latest Plan-1.pdf24 Mar 2026
Building plan approvalFile: Latest Plan-2.pdf24 Mar 2026
Building plan approvalFile: Latest Plan-3.pdf24 Mar 2026
Building plan approvalFile: Latest Plan-4.pdf24 Mar 2026
Building plan approvalFile: Latest Plan-5.pdf24 Mar 2026
Building plan approvalFile: Latest Plan-6.pdf24 Mar 2026
Building plan approvalFile: Latest Plan-7.pdf24 Mar 2026
Building plan approvalFile: Latest Plan-8.pdf24 Mar 2026
Form 1File: Form 1 March 2025.pdf24 Mar 2026
Form 2File: Form 2 March 2025.pdf24 Mar 2026
Form 3File: Form 3 March 2025.pdf24 Mar 2026
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 31-03-2025.pdf24 Mar 2026
Withdrawal Update Form 1File: Form 1 June 2025.pdf24 Mar 2026
Withdrawal Update Form 1File: Form 1 September 2025.pdf24 Mar 2026
Withdrawal Update Form 1File: Form 1 December 2025.pdf24 Mar 2026
Withdrawal Update Form 2File: Form 2 June 2025.pdf24 Mar 2026
Withdrawal Update Form 2File: Form 2 September 2025.pdf24 Mar 2026
Withdrawal Update Form 2File: Form 2 December 2025.pdf24 Mar 2026
Withdrawal Update Form 3File: Form 3 June 2025.pdf24 Mar 2026
Withdrawal Update Form 3File: Form 3 September 2025.pdf24 Mar 2026
Withdrawal Update Form 3File: Form 3 December 2025.pdf24 Mar 2026
Other - TechnicalFile: Disclosure-Zero FSI-Vighnaharta Enclave (2).pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Disclosure for Zero FSI.pdf17 Feb 2025
Proforma of Allotment letterFile: AL_Vighnaharta Enclave.pdf28 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form 3 (2).pdf28 Dec 2024
Other - TechnicalFile: Annexure A - Order No-50 (1).pdf28 Dec 2024
Proforma of Agreement for saleFile: AFS_Vighnaharta Enclave.pdf28 Dec 2024
Other - FinanceFile: Declaration for Zero Land Cost.pdf6 Dec 2024
Declaration about Commencement CertificateFile: Format D - Declaration of Commencement Certificate.pdf5 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Account.pdf5 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B -Declaration from the bank.pdf5 Dec 2024
Other - FinanceFile: Declaration of Bank account for society.pdf4 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured and unsecured finance availed for the project.pdf4 Dec 2024
Layout approvalFile: Approved Layout - 03-06-2024.pdf3 Dec 2024
Building plan approvalFile: Approved Layout - 03-06-2024.pdf3 Dec 2024
Copy of the legal title reportFile: Final Title Report-03-11-24.pdf3 Dec 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance letter - Finance.pdf3 Dec 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter - Litigations.pdf3 Dec 2024
Copy of Layout Approval (in case of layout)File: Approved Layout - 03-06-2024.pdf3 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout - 03-06-2024.pdf3 Dec 2024
CERSAI detailsFile: Declaration of Cersai.pdf3 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf3 Dec 2024
Details of encumbrances concerned to LegalFile: No Encumbrance letter - Finance.pdf3 Dec 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Letter - Litigations.pdf3 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for sale_11zon.pdf3 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexures A.pdf3 Dec 2024
PAN CardFile: PAN CARD.pdf10 Oct 2024
Declaration in FORM BFile: Form -B (Declaration of Promoter).pdf10 Oct 2024

How this compares with Mumbai Suburban

8%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vighnaharta Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmVighnaharta EnclaveCompleted 57Lapsed / revoked 54Other 87Dot size: filed unitsN

Filed coordinates, straight-line distance. 198 registered projects within 2 km.

Builder: Vighnaharta Heights Private Limited

VIGHNAHARTA HEIGHTS PRIVATE LIMITED has 3 registrations on MahaRERA, including KANNAMWAR NAGAR DATTA NIWAS and Vighnaharta Infinity. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Vighnaharta Enclave is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vighnaharta Enclave?

The registered promoter entity is Vighnaharta Heights Private Limited, a company as per the filing. Its GSTIN 27AAGCV1261P2ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vighnaharta Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vighnaharta Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vighnaharta Enclave?

The professionals named in the filing: Architect: M/s. Ellora Project Consultants Pvt Ltd; Architect: Ellora Project Consultants Pvt Ltd; Engineer: M/s. Ira Structural Consultants; Engineer: SK Consultants & Engineers; Engineer: Suraj R Sonaje; Engineer: ROHIT RAVINDRA VARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vighnaharta Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vighnaharta Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vighnaharta Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.