Home / Browse projects / Mumbai Suburban, Maharashtra / VICEROY PRIVE

Registered No litigation declared Residential / Group Housing project

VICEROY PRIVE

By SIMBA PROPERTIES LLP

RG-MH-88826 · RERA P51800049560 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 60%
6 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

VICEROY PRIVE is a Residential / Group Housing project by SIMBA PROPERTIES LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049560 on 15 Feb 2023. Possession is promised by 31 Dec 2027. 55 of the 61 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameVICEROY PRIVE
  • TypeResidential / Group Housing
  • Location
    • 13.40 MTR ROAD
    • THAKUR VILLAGE
    • Poisar
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049560
  • ReraGenie IDRG-MH-88826

Builder

  • NameSIMBA PROPERTIES LLP
  • Entity typeOthers
  • Named personVICEROY PROPERTIES LLP
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed151 files

Current status

90%55 of 61 units booked
60.7%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VICEROY PRIVE - WING ANA403361061

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

VICEROY PRIVE - WING A: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes5%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes5%
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes10%
Open ParkingNoNot applicable

Parking filed180

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots180
Closed/Covered180

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,930 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
BOMBAY REAL ESTATE DEVELOPMENT COMPANY PVT LTDMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI22005.96
Proposed, not sanctioned806 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchROAD NO 22, MAIN ROAD B35, WAGLE INDUSTRIAL ESTATE, THANE
Estimated costRs 191.94 cr
Cost incurredRs 116.50 cr
Work done60.7%
BuildingWingEstimatedIncurred
VICEROY PRIVE - WING ANARs 177.60 crRs 116.50 cr
-NARs 14.33 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKetan Mehta
EngineerDadaso Hatekar
EngineerYogesh Jain
Chartered AccountantMehta Chokshi & Shah LLP
Chartered AccountantDilip Kumar
PartnerRole in project
SIMBA PROPERTIES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Prive Signed 2.pdf26 Jun 2026
Withdrawal Update Form 1File: Prive-Rera certificate 31 march 2026 (signed).pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 RERA as on 31st March 2026 Signed.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Prive Mar-26 For Sign CJM.pdf20 Apr 2026
Form 5 (FY 2024-2025)File: Form 5_Simba Properties_Prive_FY 2024-25.pdf28 Jan 2026
Withdrawal Update Form 1File: Viceroy Prive Form 1 Dec-25 signed CJM.pdf19 Jan 2026
Withdrawal Update Form 2File: Prive Form-2 Dec 2025 - Signed CJM.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 Prive Dec25 CJM 1.pdf19 Jan 2026
Withdrawal Update Form 1File: Form-1_Prive_Signed_Sept_25.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM 2- PRIVE Sept 25 Signed by CJM.pdf14 Jan 2026
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf14 Jan 2026
Building plan approvalFile: Building Plan Highlighted flat.pdf11 Nov 2025
Building plan approvalFile: 3rd_Amended_IOD_Certificate_Dated 07052025.pdf29 Oct 2025
Layout approvalFile: 3rd_Amended_IOD_Plans Dated_07_05_2025_compressed.pdf29 Oct 2025
Withdrawal Update Form 1File: Form-1_Prive_Signed_Sept_25.pdf19 Oct 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Sept 25 Signed by CJM.pdf19 Oct 2025
Withdrawal Update Form 3File: Prive Form 3 Signed 18102025.pdf19 Oct 2025
Withdrawal Update Form 1File: Form 1 Prive Signed Jun 25.pdf30 Sep 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Signed Jun 25.pdf30 Sep 2025
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1 Prive Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 1File: Form 1 Prive Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 1File: Form 1 Prive Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 1File: Form 1 Prive Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 1File: Form 1 Prive Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 1File: Form 1 Prive Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Signed Jun 25.pdf25 Jul 2025
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf25 Jul 2025
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf25 Jul 2025
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf25 Jul 2025
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf25 Jul 2025
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf25 Jul 2025
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf25 Jul 2025
Withdrawal Update Form 1File: Form 1 Prive Signed Jun 25.pdf22 Jul 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Signed Jun 25.pdf22 Jul 2025
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf22 Jul 2025
Withdrawal Update Form 1File: Form 1 Prive Signed Jun 25.pdf21 Jul 2025
Withdrawal Update Form 2File: FORM 2- PRIVE Signed Jun 25.pdf21 Jul 2025
Withdrawal Update Form 3File: Final Form3_Prive Jun 25 1.pdf21 Jul 2025
Form 1File: Prive Form 1 Mar25.pdf9 Jul 2025
Form 2File: Prive Form 2 Mar25.pdf9 Jul 2025
Form 3File: Prive Form 3 Mar25.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Prive Form 3 Mar25.pdf9 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PRIVE 31122024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 PRIVE 31122024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PRIVE 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD LIST.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PRIVE 31122024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 PRIVE 31122024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PRIVE 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD LIST.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PRIVE 31122024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PRIVE 31122024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 PRIVE 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD LIST.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 As on 31-03-2024 Signe Revised.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 31-03-2024 Signe Revised.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 As on 31-03-2024 Signe Revised.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 31-03-2024 Signe Revised.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 As on 31-03-2024 Signe Revised.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 As on 31-03-2024 Signe Revised.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rera Prive 30-9-24.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rera Prive 30-9-24.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rera Prive 30-9-24.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold-unsold Prive 30-9-24.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rera Prive 30-9-24.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rera Prive 30-9-24.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rera Prive 30-9-24.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold-unsold Prive 30-9-24.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rera Prive 30-9-24.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rera Prive 30-9-24.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rera Prive 30-9-24.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold-unsold Prive 30-9-24.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Prive_FY 2023-24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Prive_FY 2023-24.pdf7 Oct 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
SAVANA PHASE - 3P51800023183Thakur Village, Kandivali East, Mumbai SuburbanDec 2019CompletedJun 2027Dec 2024
SAVANA PHASE - 2P51800023159Thakur Village, Kandivali East, Mumbai SuburbanDec 2019CompletedDec 2025Jun 2024
SAVANA PHASE IP51800023099Kandivali East, Mumbai SuburbanNov 2019CompletedJun 2023Nov 2022

How this compares with Mumbai Suburban

90%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VICEROY PRIVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THAKUR VILLAGE6,700+ in Mumbai Suburban

2 kmVICEROY PRIVECompleted 29Lapsed / revoked 24Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: SIMBA PROPERTIES LLP

SIMBA PROPERTIES LLP has 4 registrations on MahaRERA, including SAVANA PHASE I and SAVANA PHASE - 2. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VICEROY PRIVE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VICEROY PRIVE?

The registered promoter entity is SIMBA PROPERTIES LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VICEROY PRIVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VICEROY PRIVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VICEROY PRIVE?

The professionals named in the filing: Architect: Ketan Mehta; Engineer: Dadaso Hatekar; Engineer: Yogesh Jain; Chartered Accountant: Mehta Chokshi & Shah LLP; Chartered Accountant: Dilip Kumar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VICEROY PRIVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VICEROY PRIVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VICEROY PRIVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.