Home / Browse projects / Mumbai Suburban, Maharashtra / Godrej Nest

Registration lapsed No litigation declared Residential / Group Housing project

Godrej Nest

By Shivam Megastructures Pvt Ltd

RG-MH-04574 · RERA P51800022159 · Last updated on MahaRERA portal: 8 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 18 months past the filed date
  • 10 complaints at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2025Possession promised18 months past this date
29 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 97%
19 of 571Units unsoldnot recorded sold or booked
10Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Godrej Nest is a Residential / Group Housing project by Shivam Megastructures Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800022159 on 4 Sep 2019. Possession was promised by 30 Apr 2025 and is now 18 months past that date. The completion date has moved by 4 months from the original filing. 552 of the 571 units on this registration are recorded sold or booked, and 29 of 44 construction stages are filed complete. 10 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Nest
  • TypeResidential / Group Housing
  • Location
    • Akurli Road
    • Hanuman Nagar
    • Kandivali East
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800022159
  • ReraGenie IDRG-MH-04574

Builder

  • NameShivam Megastructures Pvt Ltd
  • Entity typeCompany
  • DirectorGirish Shamji Chheda
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

18 months past promisethis monthRegisteredSep 2019First promiseDec 2024Revised toApr 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Sep 2019
  • Promised completion30 Apr 2025
  • Revised completionRevised to 30 Apr 2025 (originally 30 Dec 2024)
  • Buildings4 building records
  • Documents filed108 files

Current status

97%552 of 571 units booked

Figures as on 8 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing-ANA322378078
Wing-BNA322378078
Wing-CNA48392040204
Wing-DNA48392110211

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 8 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 97%.

Wing-A97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Wing-B95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Wing-C86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Wing-D85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises79%
Sanitary Fittings within the flats / premises79%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities17

As on 8 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
OthersYes0%
Fitness CenterYes0%

Parking filed562

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots562
Closed/Covered554
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
Wing-A72476
Wing-B76076
Wing-C2002202
Wing-D2062208

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,823 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Shivam DevelopersMumbai CityMumbai City
Godrej Properties LtdKurlaMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI31336.15
Proposed, not sanctioned31,336 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTrade World B-Wing Ground Floor Kamala Mills compound Senapati Bapat Marg Lower Parel Mumbai-13

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectInnovations Arhchitects
EngineerS K Consultants & Engineers
Chartered AccountantAMIT JAYESH SHAH
Chartered AccountantHAY & Associates LLP
PartnerRole in project
Shivam Megastructures Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025803Dec 2024 → Apr 2025

Reason as filed by the promoterThe project is nearly complete, with an Occupancy Certificate (OC) obtained for 569 out of 571 units, with only 2 unsold units pending OC due to technical reasons, which we are addressing. The extension will also allow us to finish common amenities like the gym, play area, and E-deck facilities. Delays caused by the COVID-19 pandemic disrupted schedules and supply chains, but we have made significant progress and now need additional time to complete the remaining work. Attached are: 1. Part Occupancy Certificate 2. Site Photos We kindly seek your approval for this extension

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC006000000209911Devendra Jagdish Mehra1) Godrej Properties Limited., 2) Shivam Megastructures Private Limited04/02/2022
CC006000000194151Sipra ThomasGoderj Properties Ltd23/09/2020
CC006000000429204RENU MILIND DHOTREShivam Megstructures Private Ltd12/02/2024
CC12500519Abhishek AgarwalShivam Megastructures Pvt Ltd15/02/2025
CC12502169Dipen Dilipkumar ShahShivam Megastructures Pvt Ltd01/07/2025
CC12600926Shivam Megastructures Pvt LtdLeela Devi J Nishad and others19/02/2026
CC12600941Shivam Megastructures Pvt LtdSanjay A Patel and others (Respondent)20/02/2026
CC12600963Shivam Megastructures Pvt LtdMangesh Gajanand Khapekar22/02/2026
CC12600964Shivam Megastructures Pvt LtdLokesh Tolani (Respondent)22/02/2026
CC12602299Shivam Megastructures Pvt LtdMangesh Madhukar Shinde18/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Aug 2024

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Godrej Nest as on March 2025.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 December 2024 - Nest.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 March 2025 - Nest.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 31st Mar, 25.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 31st Dec, 24.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Godrej Nest as on Dec 2024.pdf31 Jan 2025
Declaration in FORM BFile: Form B.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29_11zon.pdf26 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2024.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2024.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf24 Dec 2024
Declaration about Commencement CertificateFile: Format D.pdf24 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf24 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 September 2024 - Nest.pdf1 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Godrej Nest - September 2024.pdf1 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 30th Sept,24.pdf19 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - Godrej Nest.pdf6 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - Godrej Nest.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Godrej Nest as on June 2024.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Site Supervisor RERA Certificate 2021-22 onwards.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor RERA Certificate 2023-24.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 30th June,24.pdf29 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Site Supervisor RERA Certificate 2021-22 onwards.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 June 2024 - Nest.pdf28 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Godrej Nest - March 2024.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 31st Mar,24.pdf28 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 31st Mar,24.pdf28 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 31st Mar,24.pdf28 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 March 2024 - Nest.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - 31st Dec 2023.pdf11 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Godrej Nest Full CC.pdf4 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Godrej Nest Full CC.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Dec 2023.pdf4 Apr 2024
Disclosure of sold/ booked inventoryFile: Godrej Nest - Sold-Unsold Inventory - Dec 2023.pdf31 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 December 2023 - Nest.pdf26 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 June 2023 - Nest.pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 September 2023 - Nest.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Godrej Nest as on March 2023.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Godrej Nest as on June 2023.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Godrej Nest as on September 2023.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 31st March, 23.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nest RERA CA Certificate Form3_June 23.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nest RERA CA Certificate Form3_Sep 23.pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 March 2023 - Nest.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Nest - RERA CA certificate - 30th June 2022.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 30-06-2022- Godrej Nest.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2022 - Godrej Nest.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Sep 2022 - Godrej Nest.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 - Dec 2022 - Godrej Nest.pdf4 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA certificate - 30th June 2022.pdf30 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 30th September, 22.pdf30 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Nest - RERA CA Certificate - As on 31st December, 22.pdf30 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate NEST 30062022.pdf24 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Nest 30092022.pdf24 May 2023
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory - 31-03-2023.pdf18 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate NEST 31032021.pdf15 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect Certificate NEST 31032020.pdf15 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - 31-03-2022.pdf15 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect Certificate NEST 310302022.pdf15 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 3 NEST 31032022.pdf15 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 NEST 31032021.pdf15 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 NEST 31032022.pdf15 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 NEST 31032021.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rera Form 5 Nest.pdf22 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nest Engineers Certificate 31032021.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nest 31032021.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 NEST 31032022.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory - PDF - Godrej Nest.pdf2 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate All Wing S-2 March 2022 - Nest.pdf17 Jun 2022
OtherFile: Appilcation in Changes of project .pdf2 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate .pdf11 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf11 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Certificate .pdf11 Aug 2021

How this compares with Mumbai Suburban

97%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Nest on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali East6,700+ in Mumbai Suburban

2 kmGodrej NestCompleted 36Lapsed / revoked 25Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: Shivam Megastructures Pvt Ltd

Shivam Megastructures Pvt. Ltd. has 2 registrations on MahaRERA, including Godrej Tranquil and Godrej Nest. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Godrej Nest shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Godrej Nest is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Nest?

The registered promoter entity is Shivam Megastructures Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Nest?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Nest?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Nest?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Nest?

The professionals named in the filing: Architect: Innovations Arhchitects; Engineer: S K Consultants & Engineers; Chartered Accountant: AMIT JAYESH SHAH; Chartered Accountant: HAY & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Nest?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Nest. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Nest to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.