Home / Browse projects / Mumbai Suburban, Maharashtra / PATON TOWERS

Registered No litigation declared Residential / Group Housing project

PATON TOWERS

By PRAVIN VIRAM SATRA

RG-MH-28000 · RERA P51800024618 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 75%
108 of 531Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 207 documents Report an error

PATON TOWERS is a Residential / Group Housing project by PRAVIN VIRAM SATRA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024618 on 24 Feb 2020. Possession is promised by 30 Dec 2026. 423 of the 531 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePATON TOWERS
  • TypeResidential / Group Housing
  • Location
    • Hanuman Nagar
    • Akurli Cross Road
    • Lokhandwala Complex Kandivali East Mumbai
    • Akurli
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800024618
  • ReraGenie IDRG-MH-28000

Builder

  • NamePRAVIN VIRAM SATRA
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2020PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2020
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed207 files

Current status

80%423 of 531 units booked

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PATON TOWERSNA252451813531

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.

PATON TOWERS: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed91

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots91
Closed/Covered84
Open Space7

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,955 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PATON CONSTRUCTIONS PRIVATE LIMITEDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI17853.1
Proposed, not sanctioned13,324 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 2 and Flat 1A Sagam Arcade Vallabhbhai Patel Road Vile Parle West Mumbai 400056

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepa Patel
EngineerPiyushkumar K Sura
Chartered AccountantAjay Shukla
Chartered AccountantPurav
PartnerRole in project
PRAVIN Viram SATRA-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12604214Satyam SinghPRAVIN Viram SATRA05/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed207

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 207 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 3File: PCPL RERA form 3 Jan - Mar 2026.pdf25 May 2026
Form 1File: Architect Certificate of March 26.PDF25 May 2026
Form 2File: Engineer Certificate Jan-Mar 2026 - 02-05-2026.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf25 May 2026
Form 1File: Work commence from Oct 2021.pdf1 May 2026
Form 2File: Work commence from Oct 2021.pdf1 May 2026
Form 3File: Work commence from Oct 2021.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: Work commence from Oct 2021.pdf1 May 2026
Form 1File: Work commence from Oct 2021.pdf1 May 2026
Form 2File: Work commence from Oct 2021.pdf1 May 2026
Form 3File: Work commence from Oct 2021.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: Work commence from Oct 2021.pdf1 May 2026
Form 1File: Work commence from Oct 2021.pdf1 May 2026
Form 2File: Work commence from Oct 2021.pdf1 May 2026
Form 3File: Work commence from Oct 2021.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: Work commence from Oct 2021.pdf1 May 2026
Form 1File: Work commence from Oct 2021.pdf1 May 2026
Form 2File: Work commence from Oct 2021.pdf1 May 2026
Form 3File: Work commence from Oct 2021.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: Work commence from Oct 2021.pdf1 May 2026
Form 1File: Work commence from Oct 2021.pdf1 May 2026
Form 2File: Work commence from Oct 2021.pdf1 May 2026
Form 3File: Work commence from Oct 2021.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: Work commence from Oct 2021.pdf1 May 2026
Form 1File: Work commence from Oct 2021.pdf1 May 2026
Form 2File: Work commence from Oct 2021.pdf1 May 2026
Form 3File: Work commence from Oct 2021.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: Work commence from Oct 2021.pdf1 May 2026
Form 1File: Work commence from Oct 2021.pdf1 May 2026
Form 2File: Work commence from Oct 2021.pdf1 May 2026
Form 3File: Work commence from Oct 2021.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: Work commence from Oct 2021.pdf1 May 2026
Form 1File: Architect Certificate Jan-Mar 2024.pdf9 Apr 2026
Form 2File: Engineer Certificate Jan -Mar 2024.pdf9 Apr 2026
Form 3File: PCPL Form 3 Jan march 24 table a b d e f g.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: PCPL Form 3 Jan-Mar 24 CA table c.pdf9 Apr 2026
Form 1File: Arc Certificate Oct- Dec 2023.pdf9 Apr 2026
Form 2File: EngineerbCertificate Oct-Dec 2023.pdf9 Apr 2026
Form 3File: Form 3 CA Oct Dec 2023 table a b d e f g.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: Form 3 CA Oct Dec 2023 table c.pdf9 Apr 2026
Form 1File: RERA Certificate Architect July-Sept 23.pdf9 Apr 2026
Form 2File: ENGINEER CERTIFICATE July Sept 23.pdf9 Apr 2026
Form 3File: Form 3 CA Certificate July Sept 23 table a b d e f g.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: Form 3 CA Certificate July Sept 23 table c.pdf9 Apr 2026
Form 1File: RERA Certificate Architect April - June 2023.pdf9 Apr 2026
Form 2File: Engineer Certificate Apr-June 2023.pdf9 Apr 2026
Form 3File: CA form 3 April June 2023 table a b d e f g.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: CA form 3 April June 2023 table c.pdf9 Apr 2026
Form 1File: RERA Certificate Architect Jan - March 2023.pdf9 Apr 2026
Form 2File: Engineer Certificate Jan -Mar 23.pdf9 Apr 2026
Form 3File: CA Certificate Form-3 Jan-March 23 table a b d e f g.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: CA Certificate Form-3 Jan-March 23 table c.pdf9 Apr 2026
Form 1File: Architect Certificate Oct-Dec 2022.pdf9 Apr 2026
Form 2File: Engineer Certificate Oct-Dec 2022.pdf9 Apr 2026
Form 3File: CA Cerificate Oct-Dec22 table a b d e f g.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: CA Cerificate Oct-Dec22 table c.pdf9 Apr 2026
Form 1File: Architect Certificate Jl-SP 2022.pdf9 Apr 2026
Form 2File: Form 2 Engineer Certificate JL-SP 2022.pdf9 Apr 2026
Form 3File: Form 3 JL-SP 2022.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: Form 3 JL-SP 2022 table c.pdf9 Apr 2026
Form 1File: Architect Certificate A-J 2022.pdf9 Apr 2026
Form 2File: Form 2 Engineer Certificate A-J 2022.pdf9 Apr 2026
Form 3File: Form 3 CA AP-JU 2022.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: Form 3 CA AP-JU 2022 table c.pdf9 Apr 2026
Form 1File: Architect Certificate.pdf9 Apr 2026
Form 2File: Form 2 Engineer Certificate.pdf9 Apr 2026
Form 3File: Form 3 CA .pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: Form 3 CA sold unsold.pdf9 Apr 2026
Form 1File: Architect Certificate.pdf9 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf9 Apr 2026
Form 3File: CA Cerficate Form 3.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: CA Cerficate Form 3 Sold unsold.pdf9 Apr 2026
Form 1File: Arc Certificate of Oct-Dec 2025.pdf8 Apr 2026
Form 2File: Engineer Certificate.pdf8 Apr 2026
Form 3File: Form 3_compressed.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sale no sale _compressed.pdf8 Apr 2026
Form 1File: Architects Reara Cetificate March 2025.pdf8 Apr 2026
Form 2File: Engineer Certificate.pdf8 Apr 2026
Form 3File: CA CERTIFICATE JAN TO MARCH 2025.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sale no sale.pdf8 Apr 2026

How this compares with Mumbai Suburban

80%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PATON TOWERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lokhandwala Complex Kandivali East Mumbai6,700+ in Mumbai Suburban

2 kmPATON TOWERSCompleted 45Lapsed / revoked 38Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 146 registered projects within 2 km.

Builder: PRAVIN VIRAM SATRA

PRAVIN VIRAM SATRA has 1 registration on MahaRERA, including PATON TOWERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PATON TOWERS is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PATON TOWERS?

The registered promoter entity is PRAVIN VIRAM SATRA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PATON TOWERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PATON TOWERS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PATON TOWERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PATON TOWERS?

The professionals named in the filing: Architect: Deepa Patel; Engineer: Piyushkumar K Sura; Chartered Accountant: Ajay Shukla; Chartered Accountant: Purav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PATON TOWERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PATON TOWERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PATON TOWERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.