VERVE

By KOLTE-PATIL DEVELOPERS LIMITED

RG-MH-29546 · RERA P51800028783 · Last updated on MahaRERA portal: 21 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 13 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 63 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2025Possession promisedregistration recorded completed
51 of 88Construction stages doneacross 8 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

VERVE is a Others project by KOLTE-PATIL DEVELOPERS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028783 on 30 Mar 2021. The registration is recorded completed; possession was promised by 31 Jul 2025.

At a glance

Project

  • NameVERVE
  • TypeOthers
  • Location
    • Link Road
    • Bangur Nagar
    • Village Pahadi
    • Goregaon (West)
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800028783
  • ReraGenie IDRG-MH-29546

Builder

  • NameKOLTE-PATIL DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200PN1991PLC129428
  • GSTIN27AAACK7310G1ZT
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Joint Managing DirectorYashvardhan Rajesh Patil
  • Executive DirectorMilind Digambar Kolte
  • Other registrations63 more →
  • Completed14 of 64
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredMar 2021PromisedJul 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Mar 2021
  • Promised completion31 Jul 2025
  • Revised completionNone
  • Buildings8 building records
  • Documents filed93 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A - Ground to 15th FloorNA2525000
Wing A -16th FloorNA00000
Wing B - Ground to 14th floorNA240000
Wing B - 15th and 16th FloorNA20000
Wing C - Ground to 23rd FloorNA330000
Wing C - 24 to 27 FloorNA40000
Wing D - Ground to 22nd FloorNA320000
Wing D - 23rd to 27th FloorNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 21 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

51 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Installation of Lifts, at 95%.

Wing A - Ground to 15th Floor82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing A -16th Floor55%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B - Ground to 14th floor82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B - 15th and 16th Floor55%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing C - Ground to 23rd Floor72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Wing C - 24 to 27 Floor45%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Wing D - Ground to 22nd Floor72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Wing D - 23rd to 27th Floor45%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 21 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes85%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Fitness CentreYes95%

Parking filed543

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots543
Closed/Covered524
Open Space19
BuildingClosed/CoveredOpen SpaceTotal
Wing A - Ground to 15th Floor86086
Wing B - Ground to 14th floor96096
Wing B - 15th and 16th Floor10212
Wing C - Ground to 23rd Floor1350135
Wing C - 24 to 27 Floor32840
Wing D - Ground to 22nd Floor1290129
Wing D - 23rd to 27th Floor36945

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,421 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Hari Ratan Co-Op Housing Society LimitedBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI29416.04
Proposed, not sanctioned29,416 sq m
Buildings approved8
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Fortune 2000, Bandra Kurla Complex, Bandra E Mumbai

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectReza Kabul
EngineerUmang Shah
Chartered AccountantCA Nikita Bajaj
Chartered AccountantVIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS
PartnerRole in project
KOLTE-PATIL DEVELOPERS LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jan 2025

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Approved plans_verve.pdf21 Feb 2025
Copy of Layout Approval (in case of layout)File: Approved plans_verve.pdf21 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Verve.pdf22 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2446128_OC_signed.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Verve.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Verve.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Verve.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Verve.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Verve.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Verve.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: VERVE.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Hari Ratan-Verve.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Hari Ratan-Verve.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: verve.pdf11 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: hari ratan Verve.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Verve-Hari Ratan.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: verve.pdf17 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HARI RATAN part OC.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: verve.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: verve.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Verve.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Verve.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Verve.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Verve.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Verve.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: verve.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Verve Hari Ratan.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Verve.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate- March-23_Hari Ratan.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: VERVE RERA.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VERVE_20230415130259 Signed Form 3.pdf20 Apr 2023
CERSAI detailsFile: Cersai Details KPDL.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Verve.pdf12 Apr 2023
Layout approvalFile: VERVE_AMENDED_APPROVAL_PG_1-reduced.pdf16 Mar 2023
Copy of Layout Approval (in case of layout)File: VERVE_AMENDED_APPROVAL_PG_1-reduced.pdf16 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: 2366466_FurtherCC_signed.pdf16 Mar 2023
Declaration about Commencement CertificateFile: Declaration about Commencement certificate_Verve.pdf16 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Verve.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Verve.pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Verve.pdf16 Jan 2023
CERSAI detailsFile: Final File Cersai.pdf16 Jan 2023
Disclosure of sold/ booked inventoryFile: VERVE RERA.pdf11 Jan 2023
Details of encumbrancesFile: Verve.pdf7 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Verve.pdf2 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate_HARI RATAN_.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: Verve RERA20221019141015.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Hari Ratan 30 09 2022_ Signed.pdf19 Oct 2022
CERSAI detailsFile: Cersai Report.pdf18 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Certificate_Verve.pdf30 Sep 2022
Disclosure of sold/ booked inventoryFile: Verve- Hari Ratan_20220712134801.pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch - Verve.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Verve-Engg-June22.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - verve.pdf7 Jul 2022
CERSAI detailsFile: Final Cersai.pdf4 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: revalidated First CC- HR C wing.pdf6 Jun 2022
Proforma of Allotment letterFile: Draft AFS Residential.pdf6 Jun 2022
Proforma of Allotment letterFile: Draft AFS Shops.pdf6 Jun 2022
Disclosure of sold/ booked inventoryFile: Verve Hari Ratan.pdf18 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Verve.pdf8 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Verve.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Verve.pdf6 Apr 2022
CERSAI detailsFile: KPDL Cersai-compressed.pdf6 Apr 2022
Disclosure of sold/ booked inventoryFile: information verve_20220127154722-compressed.pdf27 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Verve-engg-dec21.pdf20 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Verve Architect Certificate.pdf18 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: vERVE.pdf7 Jan 2022
CERSAI detailsFile: KPDL Merge File-compressed.pdf6 Jan 2022
Building plan approvalFile: Amendletter_signed_HR_27_12_2021.pdf28 Dec 2021
Layout approvalFile: Amended Approved Plan-HR 27_12_2021_1_compressed.pdf28 Dec 2021
Copy of Layout Approval (in case of layout)File: Amended Approved Plan-HR 27_12_2021_1_compressed.pdf28 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Amendletter_signed_HR_27_12_2021.pdf28 Dec 2021
Proforma of Allotment letterFile: VERVE 7TH UPDATE AFS.pdf28 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Certificate- Verve.pdf29 Sep 2021
Layout approvalFile: VERVE_APPROVAL_PG_1_compressed.pdf16 Sep 2021
Building plan approvalFile: Amended Plan Approval Letter.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: VERVE_APPROVAL_PG_1_compressed.pdf16 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Approval Letter.pdf16 Sep 2021
Proforma of Allotment letterFile: 5th Update AFS Verve Residential 12-08-2021 clean version.pdf13 Aug 2021
Proforma of Allotment letterFile: 4th Update RERA AFS Hari Ratan 16-07-2021.pdf16 Jul 2021
Proforma of Allotment letterFile: 3rd Update RERA AFS Hari Ratan 29-06-2021.pdf29 Jun 2021

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

13 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
EVARAP51800026949Borivali, Mumbai Suburban-Nov 2020CompletedOct 2024Oct 2024
24K Stargaze - J BuildingP52100027791Bavdhan, Pune-Jan 2021CompletedJun 2024Jun 2024
Western AvenueP52100000917Wakad, Pune-Jul 2017CompletedDec 2023Registered original: Dec 2022Jan 2023
24K StargazeP52100018473Bavdhan, Pune-Nov 2018CompletedMar 2023Mar 2023
Redevelopment of Jai Vijay CHSL - Phase IP51800004446Vile-Parle (East), Mumbai Suburban-Aug 2017CompletedSep 2022Registered original: Sep 2019Sep 2022
24K ATRIAP52100000428Vishal Nagar, Pimple Nilakh, Pune-Jul 2017CompletedDec 2021Dec 2021
STARGAZEP52100009722Bavadhan BK, Pune-Aug 2017CompletedDec 2018Dec 2018
Ivy Estate Umang PremierP52100000655WAGHOLI, Pune-Jul 2017CompletedSep 2018Sep 2018
GLITTERATIP52100006257Pimpri Chinchawad (M Corp.), Pune-Aug 2017CompletedJun 2018Jun 2018
GLITTERATI IIP52100000319Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedApr 2018Registered original: Dec 2017Apr 2018
Redevelopment of Link Palace Premises Co-Op Soc. Ltd. Phase IP51800008272Andheri, Mumbai Suburban-Aug 2017CompletedMar 2018Registered original: Dec 2017Mar 2018
GlitteratiPimple Nilakh Pune - 411014187-CompletedApr 2016Apr 2016
City BayDhole-Patil road Pune-41100127-CompletedApr 2014Apr 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VERVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bangur Nagar, Village Pahadi, Goregaon (West)6,700+ in Mumbai Suburban

2 kmVERVECompleted 102Lapsed / revoked 45Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 252 registered projects within 2 km.

Builder: KOLTE-PATIL DEVELOPERS LIMITED

KOLTE-PATIL DEVELOPERS LIMITED has 64 registrations on MahaRERA, including 24K OPULA and 24K ATRIA. Its filings disclose 14 earlier MahaRERA projects: declares 13 of 14 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VERVE is delayed beyond 31 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VERVE?

The registered promoter entity is KOLTE-PATIL DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200PN1991PLC129428 and GSTIN 27AAACK7310G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VERVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VERVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VERVE?

The professionals named in the filing: Architect: Reza Kabul; Engineer: Umang Shah; Chartered Accountant: CA Nikita Bajaj; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VERVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VERVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VERVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.