Registration lapsed No litigation declared Residential / Group Housing project

VERTILLAS

By AMI ESTATES LLP

RG-MH-24273 · RERA P52100012616 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • 107 complaints at MahaRERA
  • Completion date moved by 39 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2026Possession promised7 months past this date
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 99%
9 of 144Units unsoldnot recorded sold or booked
107Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

VERTILLAS is a Residential / Group Housing project by AMI ESTATES LLP in Kharadi, 411014, registered with MahaRERA as P52100012616 on 6 Sep 2017. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 39 months from the original filing. 135 of the 144 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 107 complaints are on record with the regulator.

At a glance

Project

  • NameVERTILLAS
  • TypeResidential / Group Housing
  • Location
    • Kharadi Bypass Road
    • Kharadi
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100012616
  • ReraGenie IDRG-MH-24273

Builder

  • NameAMI ESTATES LLP
  • Entity typePartnership
  • PartnersAMAAN KHOTHARI, SIDDHANT KOTHARI

Key dates

7 months past promisethis monthRegisteredSep 2017First promiseDec 2022Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Sep 2017
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 30 Dec 2022)
  • Buildings2 building records
  • Documents filed116 files

Current status

94%135 of 144 units booked
57.6%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A or TOWER 1NA242272072
TOWER B or TOWER 2NA242272072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 99%.

TOWER A or TOWER 166%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure99%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises29%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks71%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.12%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.14%
TOWER B or TOWER 266%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure99%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks71%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.12%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.14%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed216

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots216
Closed/Covered125
Open Space91
BuildingClosed/CoveredOpen SpaceTotal
TOWER A or TOWER 16246108
TOWER B or TOWER 26345108

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,300 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI6425.03
Proposed, not sanctioned6,425 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround floor, unit 2 and basement unit B, Manek Lodge, Mumbai 400007
Estimated costRs 190.00 cr
Cost incurredRs 109.48 cr
Work done57.62%
BuildingWingEstimatedIncurred
TOWER A or TOWER 1NARs 90.00 crRs 54.74 cr
TOWER B or TOWER 2NARs 90.00 crRs 54.74 cr
-NARs 10.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUBHASH SHAH AND ASSO
ArchitectSUBHASH SHAH ANDASSOCIATES
EngineerSUNIL MITALIK
EngineerASHOK SURYAWANSHI
Chartered AccountantJAMAK ASSOCIATES
Chartered AccountantAKSHAY JOSHI
PartnerRole in project
AMI ESTATES LLP-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011364Dec 2022 → Jun 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 30-06-2024

EXT52100022972Dec 2022 → Jun 2025

Reason as filed by the promoterAS PER ORDER OF THE RERA AUTHORITY

EA30062501879Dec 2022 → Mar 2026

Reason as filed by the promoterI kindly want to bring to your attention the ongoing issue we are facing regarding pending payments from our customers for the work completed in their flats. Despite numerous follow-ups by our CRM team through emails, WhatsApp messages, and phone calls, we are experiencing no payments as customers are providing various excuses for not fulfilling their financial commitments. Additionally, we have attempted to communicate the necessity of the MAHARERA extension to our customers, but unfortunately, we have not received any consent from them to proceed with the New MAHARERA Extension. Given these

Complaints filed with MahaRERA107

Case no.ComplainantRespondentFiled
CC005000000011273Mr.Bharat Gokal and Ms.Jagruti GokalAMi Estate LLP through its partners and authorized signatory31/03/2018
CC005000000106781Mrs. Pramila Ashok ChhajedM/s. Ami Estates LLP19/03/2022
CC005000000106783Mrs Reshma Manoj JainM/s. AMI Estates LLP19/03/2022
CC005000000106785MRS PRAMILA ASHOK CHHAJED AND MR KAMLESH ASHOK CHAJJEDM/s. Ami Estates LLP19/03/2022
CC005000000471203NITIN VILAS POKHARKARAMI Estates LLP partner Mr Armaan S Kothari01/07/2024
CC005000000411094Paresh Tukaram ThoratAMI Estates LLP Through Arman Kothari05/07/2024
CC005000000471222Rahul Shamrao ZanjeAMI Estates LLP Through Arman Kothari11/07/2024
CC005000000471264Tanin ChakrabortyAMI Estates LLP Through Partner Arman Sunil Kothari11/07/2024
CC005000000471159Sherin DanielAMI Estates LLP09/07/2024
CC005000000471325Somnath Vitthal BagulAMI estates LLP through partner Mr. Arman Sunil Kothari20/07/2024
CC005000000471259Gaurav Somnath KhandaveArman Sunil Kothari12/07/2024
CC005000000471351Pradnya ChavanAMI estates through its partner Mr. Arman Sunil Kothari23/07/2024
CC005000000471266Prathamesh MahangudeAMI Estates LLP through partner Arman Sunil Kothari11/07/2024
CC005000000471269Summet PardeshiAMI Estates LLP Through Partner Arman Sunil Kothari11/07/2024
CC005000000471271Nitin BansodAMI Estates LLP Through Partner Arman Sunil Kothari11/07/2024
CC005000000471224Ramakrishna PandaAMI Estates LLP Through partner Arman Sunil Kothari12/07/2024
CC005000000471282Chirag BablaniAMI Estates LLP through Partner Arman Sunil Kothari28/07/2024
CC005000000471274Kishorkumar IndureAMI Estates Through Partner Arman Sunil Kothari12/07/2024
CC005000000471287Premprakash TewaryAMI Estates LLP Through Partner Arman Sunil Kothari13/07/2024
CC005000000471273Onkar Chandrakant DevaleAMI Estates LLP through partner Arman Sunil Kothari12/07/2024
CC005000000471267Prasanna Uday PatilAMI Estates LLP Through partner Arman Sunil Kothari11/07/2024
CC005000000471272Jai Chandrakant JoshiAMI Estates LLP Through Partner Arman Sunil Kothari11/07/2024
CC005000000471288Kumul Shamlal SainiAMI Estates LLP Through partner Arman Sunil Kothari17/07/2024
CC005000000471289Puneet BathamAMI Estates LLP Through partner Arman Sunil Kothari23/07/2024
CC005000000471334Nanddeep Nachan`AMI estates through partner Arman Sunil Kothari24/07/2024
CC005000000471299Ankush GuptaAMI Estates LLP Through Partner Arman Sunil Kothari28/07/2024
CC005000000471332Harshad PurandareAMI Estates LLP Through partner Arman Sunil Kothari28/07/2024
CC005000000471292Dipak KordeAMI estates LLP through its partner Mr. Arman Sunil Kothari16/08/2024
CC005000000471290Nitin BhaleraoAMI Estates LLP Through Partner Arman Sunil Kothari18/07/2024
CC005000000471276Swapnil AmritkarAMI estates through Partner Arman Sunil Kothari12/07/2024
CC005000000471277Ravi Ashok ChhatwaniAMI Estates LLP Through Arman Sunil Kothari12/07/2024
CC005000000471298Ankit JainAMI Estates LLP Through Partner Arman Sunil Kothari13/07/2024
CC005000000471283Dnyaneshwar Laxman GundAMI Estates LLP Through Partner Arman Sunil Kothari12/07/2024
CC005000000471300Vinod Kaliram AgarwalAMI Estates LLP Through Partner Arman Sunil Kothari13/07/2024
CC005000000471328Prasad SangvikarAMI estates through its partner Arman Sunil Kothari28/07/2024
CC005000000471500SUMIT SATEJ VASTREAMI estate through partner Mr. Arman Sunil Kothari16/08/2024
CC005000000471403Manisha SinghAMI estates through tis partner Arman Sunil Kothari16/08/2024
CC005000000471368Mani BalasubramaniyanArmaan Sunil Kothari25/07/2024
CC005000000471375Gunavant PhalakAMI Estates LLP Through Partner Arman Sunil Kothari28/07/2024
CC005000000471498Gorang ParikhAMI estates through partner Mr. Arman Sunil Kothari16/08/2024
CC005000000471510Mohit MalhotraAMI estates through its partner Mr. Arman Sunil Kothari10/08/2024
CC005000000471511Amol DhaneAMI estates through its partner Mr. Arman Sunil Kothari16/08/2024
CC005000000471520Dattatraya PadalakarAMI estates through its partner Mr. Arman Sunil Kotharti16/08/2024
CC005000000471547Hrishikesh Ramchandra KadAMI estates through its partner Mr. Arman Sunil Kothari16/08/2024
CC005000000471546Akash Rahul DesardaAMI estaes through its partner Mr. Arman Sunil Kothari16/08/2024
CC12400768Anuj SharmaAMI ESTATES LLP13/11/2024
CC12400324Kailas Ramchandra AherAMI ESTATES LLP04/10/2024
CC12400462Ekant JainAMI ESTATES LLP19/10/2024
CC12400461Ashutosh JataleAMI ESTATES LLP19/10/2024
CC12400799Sourabh BhattadAMI ESTATES LLP16/11/2024
CC12400838Sukhada Vivek DharmadhikariAMI ESTATES LLP21/11/2024
CC12400839Pallavi KalwayAMI ESTATES LLP21/11/2024
CC12400882Sneh Sunil PatilAMI ESTATES LLP24/11/2024
CC12401006Jay JanaiAMI ESTATES LLP03/12/2024
CC12401039Chirag ShahAMI ESTATES LLP05/12/2024
CC12401038Prabhanjan BorwankarAMI ESTATES LLP05/12/2024
CC12401042Manoj GuptaAMI ESTATES LLP05/12/2024
CC12401074Poonam MishraAMI ESTATES LLP09/12/2024
CC12500631Srinivasa Rao KolapalliAMI ESTATES LLP22/02/2025
CC12401260Indrajeet Kumar SinghAMI ESTATES LLP28/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - ENGINEER CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - ENGINEER CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - ENGINEER CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - ENGINEER CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - ENGINEER CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - ENGINEER CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - ENGINEER CERTIFICATE .pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q1 25-26 (1).pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q2 25-26 .pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q2 25-26 .pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q3 25-26.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q3 25-26.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q4 25-26.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q4 25-26.pdf21 Apr 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE .pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - ENGINEER CERTIFICATE .pdf20 Apr 2026
Withdrawal Update Form 3File: Q1 FY 2025-26 - June 2025.pdf20 Apr 2026
Form 1File: form 1.pdf10 Jul 2025
Form 2File: Form 2 - ENGINEER CERTIFICATE .pdf10 Jul 2025
Form 3File: form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Vertillas Rera June 2025.pdf10 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A 21-22.pdf13 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf12 Jun 2025
Certificates of CA (Form 3)File: form 3.pdf12 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclosure.pdf12 Jun 2025
Certificates of CA (Form 3)File: CA Form 3.pdf12 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CA CERTIFICATE VERTILLAS.pdf10 Jun 2024
Declaration in FORM BFile: FORM B NOTARISED VERTILLAS .pdf7 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 ARCHITECT CERTIFICATE .pdf7 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ENGINEER CERTIFICATE .pdf7 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A ENGINEER CERTIFICATE VERTILLAS.pdf7 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf11 Aug 2023
OtherFile: ECLetter_compressed.pdf15 Nov 2022
Copy of the legal title reportFile: Title Report - Annxeure G.pdf17 Oct 2022
Building plan approvalFile: Sheet 2 2022 (1).pdf16 Oct 2022
Building plan approvalFile: Sheet 3 2022 (1).pdf16 Oct 2022
Building plan approvalFile: Sheet 4 2022 (1).pdf16 Oct 2022
Building plan approvalFile: Sheet 5 2022 (1).pdf16 Oct 2022
Building plan approvalFile: Sheet 6 2022 (1).pdf16 Oct 2022
Building plan approvalFile: Sheet 7 2022 (1).pdf16 Oct 2022
Building Plan Approval (IOD)File: Sheet 2 2022 (1).pdf16 Oct 2022
Building Plan Approval (IOD)File: Sheet 3 2022 (1).pdf16 Oct 2022
Building Plan Approval (IOD)File: Sheet 4 2022 (1).pdf16 Oct 2022
Building Plan Approval (IOD)File: Sheet 5 2022 (1).pdf16 Oct 2022
Building Plan Approval (IOD)File: Sheet 6 2022 (1).pdf16 Oct 2022
Building Plan Approval (IOD)File: Sheet 7 2022 (1).pdf16 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Doc123456789.pdf16 Oct 2022
Layout approvalFile: Latest Sanction Plan Vertillas Kharadi Pune (1).pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Latest Sanction Plan Vertillas Kharadi Pune (1).pdf13 Oct 2022
Layout approvalFile: Sheet-1.pdf31 Jan 2022
Layout approvalFile: Sheet-2.pdf31 Jan 2022
Layout approvalFile: Sheet-3.pdf31 Jan 2022
Layout approvalFile: Sheet-4.pdf31 Jan 2022
Layout approvalFile: Sheet-5.pdf31 Jan 2022
Layout approvalFile: Sheet-6.pdf31 Jan 2022
Layout approvalFile: Sheet-7.pdf31 Jan 2022
Copy of Layout Approval (in case of layout)File: Sheet-1.pdf31 Jan 2022
Copy of Layout Approval (in case of layout)File: Sheet-2.pdf31 Jan 2022
Copy of Layout Approval (in case of layout)File: Sheet-3.pdf31 Jan 2022
Copy of Layout Approval (in case of layout)File: Sheet-4.pdf31 Jan 2022
Copy of Layout Approval (in case of layout)File: Sheet-5.pdf31 Jan 2022
Copy of Layout Approval (in case of layout)File: Sheet-6.pdf31 Jan 2022
Copy of Layout Approval (in case of layout)File: Sheet-7.pdf31 Jan 2022
Disclosure of sold/ booked inventoryFile: inventory disclosure.pdf24 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 2017-18.pdf20 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19.pdf20 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.pdf20 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.pdf20 Jan 2022
Declaration about Commencement CertificateFile: CC COVERING LETTER.pdf17 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer form 2A 19-20.pdf17 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer form 2A 20-21.pdf17 Jan 2022
CERSAI detailsFile: CERSAI search report.pdf17 Jan 2022

Keep VERTILLAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi

2 kmVERTILLASCompleted 54Lapsed / revoked 31Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 130 registered projects within 2 km.

Builder: AMI ESTATES LLP

AMI ESTATES LLP has 1 registration on MahaRERA, including VERTILLAS. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that VERTILLAS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VERTILLAS is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VERTILLAS?

The registered promoter entity is AMI ESTATES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VERTILLAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VERTILLAS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VERTILLAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VERTILLAS?

The professionals named in the filing: Architect: SUBHASH SHAH AND ASSO; Architect: SUBHASH SHAH ANDASSOCIATES; Engineer: SUNIL MITALIK; Engineer: ASHOK SURYAWANSHI; Chartered Accountant: JAMAK ASSOCIATES; Chartered Accountant: AKSHAY JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VERTILLAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VERTILLAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VERTILLAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.