Home / Browse projects / Thane, Maharashtra / Versatile Valley
Versatile Valley
RG-MH-11560 · RERA P51700003860 · Last updated on MahaRERA portal: 12 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 67 complaints at MahaRERA
- Completion date moved by 60 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Versatile Valley is a Others project by Versatile Developers in Thane, Maharashtra, registered with MahaRERA as P51700003860 on 6 Aug 2017. Possession was promised by 30 Dec 2024 and is now 22 months past that date. The completion date has moved by 60 months from the original filing. 67 complaints are on record with the regulator.
At a glance
Project
- NameVersatile Valley
- TypeOthers
- Location
- Nilje Gram Panchayat Road
- Nilje Village
- nelje
- Kalyan
- Thane
- 421204
- Pincode421204
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700003860
- ReraGenie IDRG-MH-11560
Builder
- NameVersatile Developers
- Entity typeOthers
- Named personsAnand M Thakkar, Jagruti A Thakkar, Versatile Housing & Infrastructure Private Limited
- Other registrations1 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Aug 2017
- Promised completion30 Dec 2024
- Revised completionRevised to 30 Dec 2024 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed82 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Versatile Valley | NA | 27 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
Versatile Valley: 98% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 12 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed64
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Balaram Dharma Rasal and Others | nelje | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Versatile Developers | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDelay is on account of procedural delay in applying for Occupation Certificate.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of the project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of pandemic of Covid-19. We have consent of 60.61% allottees for purpose of extension of RERA registration period of the said project. Moreover, we have completed the construction work and we have made an application for the Occupation Certificate. Compliance of the same is under progress.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 54.34% allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 52.43% allottees for purpose of extension of RERA registration period of the said project.
Complaints filed with MahaRERA67
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000023816 | Sheedhar Balaram Rasal | Aanad Mulrajbhai Thakkar | 12/04/2018 |
| CC006000000078944 | UJAWALA RASAL | versatile developers | 17/04/2019 |
| CC006000000196126 | Mrs. Neha Thakker | M/s. Versatile Develpers | 24/02/2021 |
| CC006000000196138 | Mr. Ajay R. Gupta | M/s. Versatile Develpers | 24/02/2021 |
| CC006000000196140 | Mr. Shashank Gupta | M/s. Versatile Develpers | 24/02/2021 |
| CC006000000192160 | Ankita | M/S Versatile Developers | 13/01/2020 |
| CC006000000194079 | sachin madhukar jadhav | M/s. Varsatile Developers | 18/09/2020 |
| CC006000000194335 | Arvind Athnere | Anand Thakkar | 07/10/2020 |
| CC006000000194347 | Sameer Chitnis | ANAND THAKKAR | 17/06/2021 |
| CC006000000196598 | Ashutosh Madhusudan Bakre | Versatile Developers | 02/04/2021 |
| CC006000000198070 | Nilesh Chandrakant Patil | Versatile Valley | 22/08/2021 |
| CC006000000262066 | Nilesh Chandrakant Patil | VERSATILE VALLEY | 25/07/2022 |
| CC006000000197313 | POOPATHI BALASUBRAMANIAM MUDALIYAR | M/s Versatile Developers | 25/06/2021 |
| CC006000000197472 | Roopa Sachin Joshirao | Anand M Thakkar | 23/07/2021 |
| CC006000000197548 | Brijesh Bharat Chokshi | Versatile Developers | 07/07/2021 |
| CC006000000197562 | Mr and Mrs Swapnil S Shewale | Versatile Developers | 08/07/2021 |
| CC006000000197659 | Vasudha B Khare | Versatile Developers | 20/07/2021 |
| CC006000000480065 | Vasudha B Khare | M/S VERSATILE DEVELOPERS | 16/04/2024 |
| CC006000000198161 | Amit Agarwal | Versatile Developers 1)Anand M Thakkar, 2)Jagruti A Thakkar, 3)Versatile Housing & Infra Pvt Ltd | 01/09/2021 |
| CC006000000209548 | Dattatray Sadashiv Hadawale | M/s Versatile Developers | 20/03/2022 |
| CC006000000210132 | Versatile Valley Group of Owners | Anand Thakkar | 19/03/2022 |
| CC006000000210192 | REKHA HEMRAJANI | Versatile Developers | 06/03/2022 |
| CC006000000231246 | Neelakantan Subramanian IYER | Versatile Developer | 20/05/2022 |
| CC006000000251802 | Anil Kumar Anal | Anand Mulraj Thakkar | 09/07/2022 |
| CC006000000397560 | GAJANAN NARAYAN PATIL | M/s.Versatile Developers | 29/09/2023 |
| CC006000000397565 | Sachin Dinesh Gosalia | M/s.Versatile Developers | 29/09/2023 |
| CC006000000397846 | JAGRUTI RAJIV DUTIA | M/s.Versatile Developers | 14/10/2023 |
| CC006000000397856 | DHEER RAJIV DUTIA | M/s.Versatile Develoopers | 14/10/2023 |
| CC006000000397847 | RAJIV JAGJIVAN DUTIA | M/s.Versatile Developers | 14/10/2023 |
| CC006000000428752 | HT MEDIA LIMITED | Versatile Developers | 06/01/2024 |
| CC006000000428753 | HT MEDIA LIMITED | Versatile Valley | 06/01/2024 |
| CC006000000449751 | JAYA CHARIAR VEERARAGHAVAN CHARIAR | M/S VERSATILE DEVELOPER | 21/03/2024 |
| CC006000000560791 | M/s Versatile Developers | Vasudha Khare | 15/06/2024 |
| CC12400667 | Shashank Gupta | Versatile Developers | 05/11/2024 |
| CC12400665 | Vinay Gupta | Versatile Developers | 05/11/2024 |
| CC12400663 | Neha Thakkar | Versatile Developers | 05/11/2024 |
| CC12500414 | JAYA CHARIAR VEERARAGHAVAN CHARIAR | Versatile Developers | 07/02/2025 |
| CC12500413 | Vasudha B Khare | Versatile Developers | 07/02/2025 |
| CC12500432 | Vasudha B Khare | Versatile Developers | 10/02/2025 |
| CC12500433 | SHAILESH KRISHNA DONGRE | Versatile Developers | 10/02/2025 |
| CC12500522 | RAJESH PRAKASH NAWARE | Versatile Developers | 15/02/2025 |
| CC12503564 | JAYA CHARIAR VEERARAGHAVAN CHARIAR | Versatile Developers | 07/10/2025 |
| CC12503563 | Vasudha B Khare | Versatile Developers | 07/10/2025 |
| CC12603411 | Versatile Developers | Hemal Rajgor | 03/06/2026 |
| CC12603370 | Versatile Developers | Gulab Singh (Allottee) | 02/06/2026 |
| CC12603371 | Versatile Developers | Kiran C Doke | 02/06/2026 |
| CC12603372 | Versatile Developers | Nitin Kodur | 02/06/2026 |
| CC12603373 | Versatile Developers | Umesh Kumar Rajesh Yadav | 02/06/2026 |
| CC12603374 | Versatile Developers | Gulab Singh (allotee) | 02/06/2026 |
| CC12603412 | Versatile Developers | Pravin Sonaji Telang | 03/06/2026 |
| CC12603010 | JAYA CHARIAR VEERARAGHAVAN CHARIAR | Versatile Developers | 21/05/2026 |
| CC12603013 | Vasudha B Khare | Versatile Developers | 21/05/2026 |
| CC12603413 | Versatile Developers | Ankit Umesh Gupta | 03/06/2026 |
| CC12603414 | Versatile Developers | Ankit Umesh Gupta | 03/06/2026 |
| CC12603415 | Versatile Developers | Kritika Priyen Khona | 03/06/2026 |
| CC12603436 | Versatile Developers | Kailash Jamkar | 04/06/2026 |
| CC12603437 | Versatile Developers | Sandeep Pandurag Ghorpade | 04/06/2026 |
| CC12603438 | Versatile Developers | Sudheer Kumar Gupta | 04/06/2026 |
| CC12603818 | Versatile Developers | Mrs Poornima Redla | 20/06/2026 |
| CC12603819 | Versatile Developers | Mrs Poornima Redla | 20/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 May 2025
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 12 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 15 Feb 2025 |
| Certificates of CA (Form 3)File: 20 Certificates of CA (Form 3).pdf | 15 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 15 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 - Versatile Valley as on Sep 2024 (1).pdf | 14 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 - Versatile Valley as on Sep 2024.pdf | 6 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 - Versatile Valley as on June 2024 (REVISED).pdf | 6 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 - Versatile Valley as on 31-03-2024.pdf | 6 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on Sep 2023.pdf | 6 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on Sep 2024.pdf | 6 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on June 2024 (REVISED).pdf | 6 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on March 2024.pdf | 6 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on Dec 2023.pdf | 6 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on June 2023.pdf | 6 Dec 2024 |
| Certificates of CA (Form 3)File: New Format Form 3 - Versatile Valley as on 30-06-2024 (1).pdf | 11 Nov 2024 |
| Certificates of CA (Form 3)File: 10 Certificates of CA (Form 3).pdf | 14 Oct 2024 |
| Certificates of CA (Form 3)File: New Format Form 3 - Versatile Valley as on 30-09-2023.pdf | 14 Oct 2024 |
| Certificates of CA (Form 3)File: New Format Form 3 - Versatile Valley as on 30-06-2023.pdf | 14 Oct 2024 |
| Certificates of CA (Form 3)File: m 23.pdf | 14 Oct 2024 |
| Certificates of CA (Form 3)File: New Format Form 3 - Versatile Valley as on 31-12-2023.pdf | 14 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Certificates of CA (Form 3).pdf | 14 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Certificates of CA (Form 3).pdf | 14 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sept 2024.pdf | 11 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 - Signed.pdf | 11 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - June 2024.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory_11zon.pdf | 11 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2023-24.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Versatile Valley for FY 2023-24.pdf | 11 Oct 2024 |
| Declaration in FORM BFile: Form B.pdf | 8 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf | 8 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on March 2023.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 8 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29 - Veratile Valley_11zon.pdf | 8 Jan 2024 |
| Certificates of CA (Form 3)File: FORM 3__11zon.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 17-18.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Versatile Valley FY 22-23.pdf | 8 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Versatile Valley Mar 22 - Form 2.pdf | 3 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on June 2022.pdf | 3 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on Sept 2022.pdf | 3 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Versatile Valley as on Dec 2022.pdf | 3 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3- Versatile Valley as on March 2022.pdf | 3 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 - Versatile Valley as on June 2022.pdf | 3 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 - Versatile Valley as on Sep 2022.pdf | 3 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 - Versatile Valley as on Dec 2022.pdf | 3 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 578.pdf | 13 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Information of Sold Inventory_compressed.pdf | 11 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Versatile Valley 29_11zon.pdf | 26 Feb 2022 |
| Declaration about Commencement CertificateFile: Versatile Valley- Format D.pdf | 10 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A- March 2018.pdf | 10 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A- March 2019.pdf | 10 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A- March 2020.pdf | 10 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A- March 2021.pdf | 10 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A- December 2021.pdf | 10 Feb 2022 |
| CERSAI detailsFile: Versatile Valley CERSAI.pdf | 10 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Audit 17-18.pdf | 10 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Audit 18-19.pdf | 10 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Audit 19-20.pdf | 10 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Audit 20-21.pdf | 10 Feb 2022 |
| Certificates of CA (Form 3)File: 7-12.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: 13-18.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: 19-24.pdf | 29 Jul 2017 |
| Building plan approvalFile: Locational Clearance.pdf | 18 Jul 2017 |
| Layout approvalFile: Layout.pdf | 18 Jul 2017 |
| PAN CardFile: VD PAN CARD.pdf | 18 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate.pdf | 18 Jul 2017 |
| Details of encumbrancesFile: Details of Encumbrances.pdf | 18 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 18 Jul 2017 |
| Building Plan Approval (IOD)File: Locational Clearance.pdf | 18 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 18 Jul 2017 |
| Declaration in FORM BFile: Affidavit form b.pdf | 18 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert.pdf | 18 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Structural Engg.pdf | 18 Jul 2017 |
| Certificates of CA (Form 3)File: 1-6.pdf | 18 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Versatile Valley on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nilje Village7,600+ in Thane
Filed coordinates, straight-line distance. 50 registered projects within 2 km.
Constrcution of 2557 EWS tenements at S.No.157
ARUN SHANKARRAO BORGAVE
Runwal Gardens Phase I
Runwal Residency Private Limited
Runwal Garden City Cluster 6 Tower 6 to 9
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 6A Bldg No. 53-54
Runwal Residency Private Limited
RGC Runwal My City EWS - LIG Building
HORIZON PROJECTS PVT LTD
BALAJI ESTATE PHASE 2
M/S SAI BALAJI BUILDCON
See every Thane project, with the district possession charts
Builder: Versatile Developers
Versatile Developers has 2 registrations on MahaRERA, including Versatile Valley and Versatile Valley J Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Versatile Valley shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Versatile Valley is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Versatile Valley?
The registered promoter entity is Versatile Developers, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Versatile Valley?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Versatile Valley?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Versatile Valley?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Versatile Valley?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback