Veena Serene-Residential
By VEENA REALCON PRIVATE LIMITED
RG-MH-28956 · RERA P51800027781 · Last updated on MahaRERA portal: 15 Feb 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Veena Serene-Residential is a Residential / Group Housing project by VEENA REALCON PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027781 on 3 Jan 2021. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 84 of the 84 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameVeena Serene-Residential
- TypeResidential / Group Housing
- Location
- Sahakar Nagar Road No.3
- Chembur East
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- RERA no.P51800027781
- ReraGenie IDRG-MH-28956
Builder
- NameVEENA REALCON PRIVATE LIMITED
- Entity typeCompany
- Managing DirectorNIKUNJ HARESH SANGHAVI
- Other registrations2 more →
- Completed2 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 Jan 2021
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings2 building records
- Documents filed48 files
Current status
Figures as on 15 Feb 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing-A Building-2 | NA | 18 | 16 | 46 | 7 | 53 |
| Wing-B Building-3 | NA | 18 | 0 | 24 | 7 | 31 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.
Wing-A Building-270%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing-B Building-380%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 15 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
| Fitness Centre | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ellora Project Consultant Pvt Ltd |
| Engineer | Rajeev Ranjan |
| Chartered Accountant | THAR & Com |
| Chartered Accountant | Bathiya & Associates LLP |
| Partner | Role in project |
|---|---|
| VEENA REALCON PRIVATE LIMITED | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000591515 | Chandrakala Hasmukh Mehta | Veena Realcon Pvt Ltd | 11/08/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Nov 2023
Documents filed48
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Veena Serene dec23.pdf | 15 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_PIII_Serene_merged.pdf | 8 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_PIII_Serene_merged.pdf | 8 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sahakar Nagar Plot A Part OC_compressed.pdf | 20 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 june 23.pdf | 16 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Engineer Certificate Form 2 Veena Serene.pdf | 16 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 CA Certificate Form 3 Veena Serene 30th june 2023.pdf | 16 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Veena Serene 04 04 2023.pdf | 15 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Serene March 23.pdf | 15 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate March 23.pdf | 15 May 2023 |
| Proforma of Agreement for saleFile: Serene - Draft Agreement.pdf | 24 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 30 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Veena Serene Q3.pdf | 30 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Veena Serene Q3.pdf | 30 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: VRPL Serene FY2020-21.pdf | 13 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: VRPL Serene FY2021-22.pdf | 13 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Veena Serene Architect Certificate_compressed.pdf | 1 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Veena Serene.pdf | 1 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Veena Serene.pdf | 1 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Serene.pdf | 13 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Veena Serene.pdf | 13 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate compressed.pdf | 13 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Completion Certificate.pdf | 30 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 Veena Serene.pdf | 30 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Veena Serene.pdf | 30 Jul 2022 |
| Declaration about Commencement CertificateFile: CC Declaration - Serene.pdf | 3 Mar 2022 |
| CERSAI detailsFile: CERSAI - Serene.pdf | 3 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Veena Serene - CC _compressed.pdf | 28 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Serene_compressed.pdf | 28 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Veena Serene - Engineer Certificate_compressed.pdf | 28 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Serene_compressed.pdf | 28 Feb 2022 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE - SERENE.pdf | 21 Aug 2021 |
| Declaration in FORM BFile: DA.pdf | 28 Dec 2020 |
| OtherFile: DA.pdf | 28 Dec 2020 |
| Proforma of Allotment letterFile: 14 AFS.pdf | 16 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 15 Dec 2020 |
| Layout approvalFile: 4 Approved Plans.pdf | 11 Dec 2020 |
| Building plan approvalFile: 5 IOA.pdf | 11 Dec 2020 |
| PAN CardFile: 1 PAN Card.pdf | 11 Dec 2020 |
| Copy of the legal title reportFile: 2 Title Certificate.pdf | 11 Dec 2020 |
| Details of encumbrancesFile: 3 Encumbrance.pdf | 11 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: 4 Approved Plans.pdf | 11 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 IOA.pdf | 11 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: 6 CC.pdf | 11 Dec 2020 |
| Declaration in FORM BFile: 7 FormB.pdf | 11 Dec 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect Certificate.pdf | 11 Dec 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer Certificate.pdf | 11 Dec 2020 |
| OtherFile: 20 Self Declaration.pdf | 11 Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 48 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Veena Serene-Residential on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chembur East6,700+ in Mumbai Suburban
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: VEENA REALCON PRIVATE LIMITED
VEENA REALCON PRIVATE LIMITED has 3 registrations on MahaRERA, including Veena Serenity and Veena Senterio. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Veena Serene-Residential shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Veena Serene-Residential is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Veena Serene-Residential?
The registered promoter entity is VEENA REALCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Veena Serene-Residential?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Veena Serene-Residential?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Veena Serene-Residential?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Veena Serene-Residential?
The professionals named in the filing: Architect: Ellora Project Consultant Pvt Ltd; Engineer: Rajeev Ranjan; Chartered Accountant: THAR & Com; Chartered Accountant: Bathiya & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Veena Serene-Residential?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.