Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Veena Samrajya - Sector VIII Commercial is a Commercial project by Yamuna Realcon Private Limited in Palghar, Maharashtra, registered with MahaRERA as P99000050978 on 17 May 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 29 of the 66 units on this registration are recorded sold or booked, and 42 of 66 construction stages are filed complete.
At a glance
Project
- NameVeena Samrajya - Sector VIII Commercial
- TypeCommercial
- Location
- Chintupada Road
- Palghar west
- Mahim
- Palghar
- 401404
- Pincode401404
- RERA no.P99000050978
- ReraGenie IDRG-MH-95813
Builder
- NameYamuna Realcon Private Limited
- Entity typeCompany
- CINU70100MH2015PTC270047
- GSTIN27AACCF7382B1ZQ
- DirectorsAshok Hargovinddas Desai, Naitik Mukesh Mehta
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 May 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings6 building records
- Documents filed79 files
Current status
Figures as on 7 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Veena Samrajya Commercial -TYPE J2 WING F | NA | 1 | 0 | 0 | 14 | 14 |
| Veena Samrajya Commercial - TYPE A2 WING A | NA | 1 | 0 | 0 | 24 | 24 |
| Veena Samrajya Commercial - TYPE B3 WING B | NA | 1 | 1 | 0 | 9 | 9 |
| Veena Samrajya Commercial -TYPE B2 WING B | NA | 1 | 0 | 0 | 6 | 6 |
| Veena Samrajya Commercial - TYPE A2 WING C | NA | 1 | 0 | 0 | 7 | 7 |
| Veena Samrajya Commercial -TYPE -A2 WING D | NA | 1 | 0 | 0 | 6 | 6 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
42 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
Veena Samrajya Commercial -TYPE J2 WING F81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Veena Samrajya Commercial - TYPE A2 WING A81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Veena Samrajya Commercial - TYPE B3 WING B81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Veena Samrajya Commercial -TYPE B2 WING B81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Veena Samrajya Commercial - TYPE A2 WING C81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Veena Samrajya Commercial -TYPE -A2 WING D81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Veena Developers | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Veena Samrajya Commercial - TYPE A2 WING A | NA | Rs 62.37 lakh | Rs 59.25 lakh |
| Veena Samrajya Commercial - TYPE A2 WING C | NA | Rs 62.37 lakh | Rs 59.25 lakh |
| Veena Samrajya Commercial -TYPE -A2 WING D | NA | Rs 62.37 lakh | Rs 59.25 lakh |
| - | NA | Rs 60.00 lakh | Rs 30.00 lakh |
| Veena Samrajya Commercial -TYPE B2 WING B | NA | Rs 48.63 lakh | Rs 46.20 lakh |
| Veena Samrajya Commercial - TYPE B3 WING B | NA | Rs 43.18 lakh | Rs 41.02 lakh |
| Veena Samrajya Commercial -TYPE J2 WING F | NA | Rs 27.17 lakh | Rs 27.17 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ajay Wade & Associates |
| Architect | KPA |
| Architect | Ajay Wade and Associates |
| Engineer | Arun Singh |
| Engineer | Ashok Harsora |
| Engineer | Rajeev Ranjan |
| Chartered Accountant | Thar & Co. |
| Chartered Accountant | K S N C & Co LLP |
| Partner | Role in project |
|---|---|
| Yamuna Realcon Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project has reached an advanced stage of completion, wherein all major constructions and development activities are completed in compliance with the sanctioned plans and applicable laws. The present application for extension of completion date is sought solely for the limited purpose of Obtaining the Occupation Certificate(OC) from the competent authority and to ensure continued compliance with the provision of the RERA Act. The Application for issuance of the OC before MHADA in respect of the said project was duly submitted on 04th December 2025 and the same is currently consideration by
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 Q4 2025-2026.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Form-2 Q4 2025-2026.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: Form -3 Q4 2025-2026.pdf | 7 May 2026 |
| Form 1File: FORM-1 Q3 WORK COMPLETION CERTIFICATE.pdf | 21 Jan 2026 |
| Form 2File: Form 2 Q3 Samrajya 15012026 0001.pdf | 21 Jan 2026 |
| Form 3File: Form 3 Q3 Samrajya 200120260001.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Q3 Yamuna Realcon Pvt Ltd.pdf | 21 Jan 2026 |
| Form 1File: Rera Form-1 (sep-25) Yamuna.pdf | 14 Jan 2026 |
| Form 2File: Yamuna Form 2 Veena Smarajya.pdf | 14 Jan 2026 |
| Form 3File: Yamuna Form 3.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Samrajya Commercial Book Inventory.pdf | 14 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form-5.pdf | 24 Dec 2025 |
| Form 1File: Architect Certificate for Shops 30-06-2025.pdf | 31 Jul 2025 |
| Form 2File: Form -2 30-06-2025 Final.pdf | 31 Jul 2025 |
| Form 3File: Form-3 CA Certificate Q1 FY 25-26.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory confirmation Yamuna 30-06-2025.pdf | 31 Jul 2025 |
| Form 1File: Work Completion Certificate Commerical.pdf | 19 Jul 2025 |
| Form 2File: Form 2.pdf | 19 Jul 2025 |
| Form 3File: Form 3.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3.pdf | 19 Jul 2025 |
| Form 1File: Architect Certificate for Shops.pdf | 17 Jul 2025 |
| Form 2File: Form 2.pdf | 17 Jul 2025 |
| Form 3File: Form 3 C A Certificate Samrajya.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 C A Certificate Samrajya.pdf | 17 Jul 2025 |
| Form 1File: F1 Q2.pdf | 1 Jul 2025 |
| Form 2File: F2 Q2.pdf | 1 Jul 2025 |
| Form 3File: F3 Q2.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: F3 Q2.pdf | 1 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form-1 (June-2024).pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form-1 (Sep-2024).pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-3.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Q4.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Final.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Work Completion Certificate Commercial 30 06 2023 pdf.pdf | 15 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Work Completion Certificate Commercial 30 09 2023.pdf | 15 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31 07 2023.pdf | 15 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30 11 2023.pdf | 15 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Samrajya 12 12 2023.pdf | 15 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Samrajya 13 12 2023.pdf | 15 Dec 2023 |
| Building plan approvalFile: TYPE J2 WING F.pdf | 2 May 2023 |
| Building plan approvalFile: TYPE-A2 WING A C D.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: TYPE J2 WING F.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: TYPE-A2 WING A C D.pdf | 2 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf | 25 Mar 2023 |
| Declaration about Commencement CertificateFile: YRPL CC.pdf | 25 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Completion Letter Reduced.pdf | 25 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Sanad Yamuna.pdf | 24 Mar 2023 |
| Layout approvalFile: 170123_LAYOUT PLAN-Model 01.pdf | 1 Mar 2023 |
| Building plan approvalFile: TYPE B2 WING B.pdf | 1 Mar 2023 |
| Building plan approvalFile: TYPE B3 WING B.pdf | 1 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: 170123_LAYOUT PLAN-Model 01.pdf | 1 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: TYPE B2 WING B.pdf | 1 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: TYPE B3 WING B.pdf | 1 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: yAMUNA LETTER.pdf | 19 Jan 2023 |
| Proforma of Agreement for saleFile: AFS Draft For Rera YRPL _1.pdf | 26 Dec 2022 |
| Proforma of Agreement for saleFile: AFS Draft For Rera YRPL _2.pdf | 26 Dec 2022 |
| Proforma of Agreement for saleFile: AFS Draft For Rera YRPL _3.pdf | 26 Dec 2022 |
| Proforma of Agreement for saleFile: AFS Draft For Rera YRPL _4.pdf | 26 Dec 2022 |
| Proforma of Allotment letterFile: INTENDED PROVISIONAL ALLOTMENT LETTER.pdf | 18 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: List of Deviation Clauses.pdf | 18 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Clauses In Allotment Letter.pdf | 20 Aug 2022 |
| Copy of the legal title reportFile: 1-10_ title.pdf | 19 Aug 2022 |
| Copy of the legal title reportFile: 11-19 title.pdf | 19 Aug 2022 |
| Details of encumbrances concerned to LegalFile: encumbrance Legal Declaration.pdf | 19 Aug 2022 |
| Other - FinanceFile: Self Declaration Finance.pdf | 5 Aug 2022 |
| PAN CardFile: Yamuna Pancard.pdf | 29 Jul 2022 |
| Details of encumbrances concerned to FinanceFile: Self Declaration Finance.pdf | 29 Jul 2022 |
| Declaration in FORM BFile: 8 Form -B YRPL.pdf | 29 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate.pdf | 29 Jul 2022 |
| CERSAI detailsFile: Cersai Declaration YRPL.pdf | 29 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 29 Jul 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf | 29 Jul 2022 |
| Other - LegalFile: Bord Rsln YRPL.pdf | 29 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Veena Samrajya - Sector VIII Commercial on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Palghar west3,200+ in Palghar
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: Yamuna Realcon Private Limited
Yamuna Realcon Private Limited has 1 registration on MahaRERA, including Veena Samrajya - Sector VIII Commercial. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Veena Samrajya - Sector VIII Commercial is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Veena Samrajya - Sector VIII Commercial?
The registered promoter entity is Yamuna Realcon Private Limited, a company as per the filing. Its CIN U70100MH2015PTC270047 and GSTIN 27AACCF7382B1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Veena Samrajya - Sector VIII Commercial?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Veena Samrajya - Sector VIII Commercial?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Veena Samrajya - Sector VIII Commercial?
The professionals named in the filing: Architect: Ajay Wade & Associates; Architect: KPA; Architect: Ajay Wade and Associates; Engineer: Arun Singh; Engineer: Ashok Harsora; Engineer: Rajeev Ranjan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Veena Samrajya - Sector VIII Commercial?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback