Home / Browse projects / Palghar, Maharashtra / Veena Samrajya - Sector VIII Commercial

Registered No litigation declared Commercial project

Veena Samrajya - Sector VIII Commercial

By Yamuna Realcon Private Limited

RG-MH-95813 · RERA P99000050978 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
42 of 66Construction stages doneacross 6 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
37 of 66Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Veena Samrajya - Sector VIII Commercial is a Commercial project by Yamuna Realcon Private Limited in Palghar, Maharashtra, registered with MahaRERA as P99000050978 on 17 May 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 29 of the 66 units on this registration are recorded sold or booked, and 42 of 66 construction stages are filed complete.

At a glance

Project

  • NameVeena Samrajya - Sector VIII Commercial
  • TypeCommercial
  • Location
    • Chintupada Road
    • Palghar west
    • Mahim
    • Palghar
    • 401404
  • Pincode401404
  • RERA no.P99000050978
  • ReraGenie IDRG-MH-95813

Builder

  • NameYamuna Realcon Private Limited
  • Entity typeCompany
  • CINU70100MH2015PTC270047
  • GSTIN27AACCF7382B1ZQ
  • DirectorsAshok Hargovinddas Desai, Naitik Mukesh Mehta

Key dates

this monthRegisteredMay 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 May 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings6 building records
  • Documents filed79 files

Current status

44%29 of 66 units booked
88.0%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Veena Samrajya Commercial -TYPE J2 WING FNA1001414
Veena Samrajya Commercial - TYPE A2 WING ANA1002424
Veena Samrajya Commercial - TYPE B3 WING BNA11099
Veena Samrajya Commercial -TYPE B2 WING BNA10066
Veena Samrajya Commercial - TYPE A2 WING CNA10077
Veena Samrajya Commercial -TYPE -A2 WING DNA10066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

42 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Veena Samrajya Commercial -TYPE J2 WING F81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Veena Samrajya Commercial - TYPE A2 WING A81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Veena Samrajya Commercial - TYPE B3 WING B81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Veena Samrajya Commercial -TYPE B2 WING B81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Veena Samrajya Commercial - TYPE A2 WING C81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Veena Samrajya Commercial -TYPE -A2 WING D81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,842 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jan 2026
LandownerVillageDistrict
Veena DevelopersVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityGRAM PANCHAYAT PALGHAR
Permissible FSI2840.61
Proposed, not sanctioned813 sq m
Buildings approved9
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEverest Square building, ground floor, shraddhanand road, near shiv sagar hotel, vile parle east, mu
Estimated costRs 3.66 cr
Cost incurredRs 3.22 cr
Work done88.0%
BuildingWingEstimatedIncurred
Veena Samrajya Commercial - TYPE A2 WING ANARs 62.37 lakhRs 59.25 lakh
Veena Samrajya Commercial - TYPE A2 WING CNARs 62.37 lakhRs 59.25 lakh
Veena Samrajya Commercial -TYPE -A2 WING DNARs 62.37 lakhRs 59.25 lakh
-NARs 60.00 lakhRs 30.00 lakh
Veena Samrajya Commercial -TYPE B2 WING BNARs 48.63 lakhRs 46.20 lakh
Veena Samrajya Commercial - TYPE B3 WING BNARs 43.18 lakhRs 41.02 lakh
Veena Samrajya Commercial -TYPE J2 WING FNARs 27.17 lakhRs 27.17 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjay Wade & Associates
ArchitectKPA
ArchitectAjay Wade and Associates
EngineerArun Singh
EngineerAshok Harsora
EngineerRajeev Ranjan
Chartered AccountantThar & Co.
Chartered AccountantK S N C & Co LLP
PartnerRole in project
Yamuna Realcon Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29012619626Dec 2025 → Dec 2026

Reason as filed by the promoterThe project has reached an advanced stage of completion, wherein all major constructions and development activities are completed in compliance with the sanctioned plans and applicable laws. The present application for extension of completion date is sought solely for the limited purpose of Obtaining the Occupation Certificate(OC) from the competent authority and to ensure continued compliance with the provision of the RERA Act. The Application for issuance of the OC before MHADA in respect of the said project was duly submitted on 04th December 2025 and the same is currently consideration by

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 Q4 2025-2026.pdf7 May 2026
Withdrawal Update Form 2File: Form-2 Q4 2025-2026.pdf7 May 2026
Withdrawal Update Form 3File: Form -3 Q4 2025-2026.pdf7 May 2026
Form 1File: FORM-1 Q3 WORK COMPLETION CERTIFICATE.pdf21 Jan 2026
Form 2File: Form 2 Q3 Samrajya 15012026 0001.pdf21 Jan 2026
Form 3File: Form 3 Q3 Samrajya 200120260001.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Q3 Yamuna Realcon Pvt Ltd.pdf21 Jan 2026
Form 1File: Rera Form-1 (sep-25) Yamuna.pdf14 Jan 2026
Form 2File: Yamuna Form 2 Veena Smarajya.pdf14 Jan 2026
Form 3File: Yamuna Form 3.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Samrajya Commercial Book Inventory.pdf14 Jan 2026
Form 5 (FY 2024-2025)File: Form-5.pdf24 Dec 2025
Form 1File: Architect Certificate for Shops 30-06-2025.pdf31 Jul 2025
Form 2File: Form -2 30-06-2025 Final.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate Q1 FY 25-26.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory confirmation Yamuna 30-06-2025.pdf31 Jul 2025
Form 1File: Work Completion Certificate Commerical.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf19 Jul 2025
Form 1File: Architect Certificate for Shops.pdf17 Jul 2025
Form 2File: Form 2.pdf17 Jul 2025
Form 3File: Form 3 C A Certificate Samrajya.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3 C A Certificate Samrajya.pdf17 Jul 2025
Form 1File: F1 Q2.pdf1 Jul 2025
Form 2File: F2 Q2.pdf1 Jul 2025
Form 3File: F3 Q2.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: F3 Q2.pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form-1 (June-2024).pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form-1 (Sep-2024).pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Q4.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Final.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Work Completion Certificate Commercial 30 06 2023 pdf.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Work Completion Certificate Commercial 30 09 2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31 07 2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30 11 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Samrajya 12 12 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Samrajya 13 12 2023.pdf15 Dec 2023
Building plan approvalFile: TYPE J2 WING F.pdf2 May 2023
Building plan approvalFile: TYPE-A2 WING A C D.pdf2 May 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE J2 WING F.pdf2 May 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE-A2 WING A C D.pdf2 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf25 Mar 2023
Declaration about Commencement CertificateFile: YRPL CC.pdf25 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Completion Letter Reduced.pdf25 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Sanad Yamuna.pdf24 Mar 2023
Layout approvalFile: 170123_LAYOUT PLAN-Model 01.pdf1 Mar 2023
Building plan approvalFile: TYPE B2 WING B.pdf1 Mar 2023
Building plan approvalFile: TYPE B3 WING B.pdf1 Mar 2023
Copy of Layout Approval (in case of layout)File: 170123_LAYOUT PLAN-Model 01.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE B2 WING B.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE B3 WING B.pdf1 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: yAMUNA LETTER.pdf19 Jan 2023
Proforma of Agreement for saleFile: AFS Draft For Rera YRPL _1.pdf26 Dec 2022
Proforma of Agreement for saleFile: AFS Draft For Rera YRPL _2.pdf26 Dec 2022
Proforma of Agreement for saleFile: AFS Draft For Rera YRPL _3.pdf26 Dec 2022
Proforma of Agreement for saleFile: AFS Draft For Rera YRPL _4.pdf26 Dec 2022
Proforma of Allotment letterFile: INTENDED PROVISIONAL ALLOTMENT LETTER.pdf18 Nov 2022
Deviation Report with respect to model copy of AgreementFile: List of Deviation Clauses.pdf18 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation Clauses In Allotment Letter.pdf20 Aug 2022
Copy of the legal title reportFile: 1-10_ title.pdf19 Aug 2022
Copy of the legal title reportFile: 11-19 title.pdf19 Aug 2022
Details of encumbrances concerned to LegalFile: encumbrance Legal Declaration.pdf19 Aug 2022
Other - FinanceFile: Self Declaration Finance.pdf5 Aug 2022
PAN CardFile: Yamuna Pancard.pdf29 Jul 2022
Details of encumbrances concerned to FinanceFile: Self Declaration Finance.pdf29 Jul 2022
Declaration in FORM BFile: 8 Form -B YRPL.pdf29 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate.pdf29 Jul 2022
CERSAI detailsFile: Cersai Declaration YRPL.pdf29 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf29 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf29 Jul 2022
Other - LegalFile: Bord Rsln YRPL.pdf29 Jul 2022

How this compares with Palghar

44%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Veena Samrajya - Sector VIII Commercial on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Palghar west3,200+ in Palghar

Builder: Yamuna Realcon Private Limited

Yamuna Realcon Private Limited has 1 registration on MahaRERA, including Veena Samrajya - Sector VIII Commercial. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Veena Samrajya - Sector VIII Commercial is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Veena Samrajya - Sector VIII Commercial?

The registered promoter entity is Yamuna Realcon Private Limited, a company as per the filing. Its CIN U70100MH2015PTC270047 and GSTIN 27AACCF7382B1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Veena Samrajya - Sector VIII Commercial?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Veena Samrajya - Sector VIII Commercial?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Veena Samrajya - Sector VIII Commercial?

The professionals named in the filing: Architect: Ajay Wade & Associates; Architect: KPA; Architect: Ajay Wade and Associates; Engineer: Arun Singh; Engineer: Ashok Harsora; Engineer: Rajeev Ranjan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Veena Samrajya - Sector VIII Commercial?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Veena Samrajya - Sector VIII Commercial. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Veena Samrajya - Sector VIII Commercial to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.