Home / Browse projects / Satara, Maharashtra / VEDANT PARK

Registered No litigation declared Others project

VEDANT PARK

By UNIQUE CONSTRUCTION

RG-MH-77280 · RERA P52700054756 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
0 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

VEDANT PARK is a Others project by UNIQUE CONSTRUCTION in Satara, Maharashtra, registered with MahaRERA as P52700054756 on 12 Feb 2024. Possession is promised by 31 Dec 2028. 37 of the 37 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameVEDANT PARK
  • TypeOthers
  • Location
    • VINCHURNI ROAD
    • NEAR SHIVAJIRAJE ENGLISH MEDIUM SCHOOL
    • Jadhavwadi (563279)
    • Phaltan
    • Satara
    • 415523
  • Pincode415523
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700054756
  • ReraGenie IDRG-MH-77280

Builder

  • NameUNIQUE CONSTRUCTION
  • Entity typePartnership
  • PartnersAJINKYA LALASO LAKADE, CHAITANYA SUNIL KUMBHAR
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

100%37 of 37 units booked
106.8%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VEDANT PARKNA6629837

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

VEDANT PARK: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area931 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jul 2025

Approvals and building plan

Sanctioning authorityTOWN PLANNING DEPARTMENT OF SATARA
Permissible FSI2097.92
Proposed, not sanctioned2,098 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIV RATAN, TRAINING COLLEGE ROAD,LAXMINAGAR, PHALTAN- 415523
Estimated costRs 4.58 cr
Cost incurredRs 4.89 cr
Work done106.75%
BuildingWingEstimatedIncurred
VEDANT PARKNARs 4.58 crRs 4.89 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANKET GURULING JANGAM
EngineerAJINKYA LALASO LAKADE
Chartered AccountantNIKHIL SUBHASH BHOITE
PartnerRole in project
UNIQUE CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate Form 1.pdf28 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate Form 2.pdf28 Apr 2026
Withdrawal Update Form 3File: CA Certificate Form 3.pdf28 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Q3.pdf7 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Q3 .pdf7 Feb 2026
Withdrawal Update Form 3File: CA Certificate Q3.pdf7 Feb 2026
Withdrawal Update Form 1File: Architect Certificate 2025 Q2.pdf20 Dec 2025
Withdrawal Update Form 1File: Architect Certificate 2025 Q2.pdf20 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Q2 2025.pdf20 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Q2 2025.pdf20 Dec 2025
Withdrawal Update Form 3File: CA certificate 2025 Q2_compressed.pdf20 Dec 2025
Withdrawal Update Form 3File: CA certificate 2025 Q2_compressed.pdf20 Dec 2025
Form 2A (FY 2025-2026)File: Form 2A.pdf6 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A 24.pdf29 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A 25.pdf29 Aug 2025
Form 1File: Architect Certificate.pdf9 Aug 2025
Form 2File: Engineer Certificate.pdf9 Aug 2025
Form 3File: CA CERTIFICATE_compressed (1).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q1 24-25.pdf9 Aug 2025
Form 1File: Architect Certificate.pdf9 Aug 2025
Form 2File: Engineer Certificate.pdf9 Aug 2025
Form 3File: CA certificate.pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q2 24 -25.pdf9 Aug 2025
Form 1File: Architect Certificate 1.pdf9 Aug 2025
Form 2File: Engineer Certificate Q3.pdf9 Aug 2025
Form 3File: CA certificate Q3_compressed.pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q3 24 -25.pdf9 Aug 2025
Form 1File: Architect Certificate Q4.pdf9 Aug 2025
Form 2File: Engineer Certificate Q4.pdf9 Aug 2025
Form 3File: CA Certificate Q4 (2).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q4 25-26.pdf9 Aug 2025
Form 1File: Architect certificate Q1.pdf9 Aug 2025
Form 2File: Engineer Certificate Q1.pdf9 Aug 2025
Form 3File: CA Certificate - Q1.pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q1 25-26.pdf9 Aug 2025
Form 1File: Architect Certificate.pdf4 Aug 2025
Form 2File: Engineer Certificate.pdf4 Aug 2025
Form 3File: CA CERTIFICATE_compressed (1).pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q4 2024.pdf4 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q4.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q4 (2).pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q4.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q3.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Q3_compressed.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q3.pdf18 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 PARK.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed (1).pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed (1).pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf5 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about seperate bank account.pdf28 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: discloure ajinkya.pdf1 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: duscloure Chaitanya.pdf1 Feb 2024
Declaration in FORM BFile: Declaration Form B.pdf30 Jan 2024
Proforma of Agreement for saleFile: 2 Proforma of Aggrement letter 1.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Vedant Park_compressed.pdf20 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about sparate bank account for real estate project.pdf11 Jan 2024
Copy of the legal title reportFile: Legal title report.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate park_compressed.pdf8 Jan 2024
Proforma of Allotment letterFile: Allotment 1.pdf8 Jan 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Legal.pdf2 Jan 2024
Details of encumbrances concerned to FinanceFile: No cumbrances finace.pdf2 Jan 2024
Details of encumbrances concerned to LegalFile: No Encumbrances Legal.pdf2 Jan 2024
Details of encumbrances concerned to LegalFile: No cumbrances finace.pdf2 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NA order_compressed.pdf2 Jan 2024
Declaration about Commencement CertificateFile: Declaration about Commencement certificate.pdf2 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200292209952_For_Asset_Based_Search_02_01_2024_16_53_06_889.pdf2 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter 1.pdf2 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report of aggrement to sale.pdf2 Jan 2024
Layout approvalFile: SAROJINI DEVI NAGAR_compressed.pdf1 Jan 2024

How this compares with Satara

100%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep VEDANT PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SHIVAJIRAJE ENGLISH MEDIUM SCHOOL1,100+ in Satara

2 kmVEDANT PARKCompleted 8Lapsed / revoked 7Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: UNIQUE CONSTRUCTION

UNIQUE CONSTRUCTION has 4 registrations on MahaRERA, including UNIQUE RESIDENCY and VEDANT CLASSIC. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if VEDANT PARK is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VEDANT PARK?

The registered promoter entity is UNIQUE CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VEDANT PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VEDANT PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VEDANT PARK?

The professionals named in the filing: Architect: SANKET GURULING JANGAM; Engineer: AJINKYA LALASO LAKADE; Chartered Accountant: NIKHIL SUBHASH BHOITE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VEDANT PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VEDANT PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VEDANT PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.