Home / Browse projects / Thane, Maharashtra / VEDA
VEDA
RG-MH-28670 · RERA P51700026679 · Last updated on MahaRERA portal: 17 Feb 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VEDA is a Residential / Group Housing project by Sagar Enterprise in Thane, Maharashtra, registered with MahaRERA as P51700026679 on 21 Oct 2020. The registration is recorded completed; possession was promised by 30 Sep 2024. 1 complaint is on record with the regulator.
At a glance
Project
- NameVEDA
- TypeResidential / Group Housing
- Location
- S.No.7-4
- 7-14
- OPP Tarangan Society
- Near TMC Water Tank
- Ghodbunder Road
- Thane
- Kasarvadavali
- Thane (M Corp.)
- Thane
- 400615
- Pincode400615
- RERA no.P51700026679
- ReraGenie IDRG-MH-28670
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Oct 2020
- Promised completion30 Sep 2024
- Revised completionNone
- Buildings1 building record
- Documents filed88 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VEDA | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
VEDA: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SMT SUVARNA GHOSH |
| Engineer | TECHLINE CONSULTING ENGINEERS |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | SARANG DESAI & ASSOCIATES |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Partner | Role in project |
|---|---|
| Sagar Enterprise | - |
Litigation declared10
| Case | Court | Status |
|---|---|---|
| RCS 427/2016/2016 | Civil Court Senior Division Thane | WRITTEN STATEMENT |
| SCS 783/2019/2019 | Civil Court Senior Division Thane | COMPLIANCE |
| 22/2017/2017 | Civil Court Senior Division Thane | ARGUMENT ON EXH UNREADY |
| 620/2021/2021 | Civil Court Senior Division Thane | Withdrawn |
| 132/19/2019 | Additional Collector Thane | Appeal Dismissed by Honorable Additional Collector |
| 67/2021/2021 | Tehsildar Thane | Appeal Dismissed |
| 18/2021/2021 | SDO Thane | Appeal Dismissed |
| 34/2022/2022 | Honorable District Judge Thane | Appeal Dismissed |
| 242/2022/2022 | High Court Mumbai | Withdrawn |
| 98/2022/2022 | SDO Thane | Appeal Dismissed |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000209910 | yashwant moreshwar manwacharya | M/S Sagar Enterprise | 10/02/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Oct 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Jun 2024
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 14 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 17 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: ilovepdf_merged (40).pdf | 4 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: ilovepdf_merged (40).pdf | 30 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 (2).pdf | 15 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: ilovepdf_merged (21).pdf | 9 Oct 2024 |
| Declaration about Commencement CertificateFile: FORMAT D DECLARATION.pdf | 20 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (1).pdf | 20 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A- 2020-21.pdf | 20 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A- 2021-2022.pdf | 20 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A- 2023-24.pdf | 20 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A- 2022-23 (1).pdf | 20 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 20 Aug 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DECLARATION 1.pdf | 20 Aug 2024 |
| Status of ConveyanceFile: DECLARATION1.pdf | 20 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Veda as on June 2024.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Veda as on 30th June 2024.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: xxxxxxxx.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Veda as on June 2024.pdf | 5 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Veda as on March 2024.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Veda as on March 2024.pdf | 18 Jun 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC - Veda.pdf | 18 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Veda.pdf | 23 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Veda FY 2022-23.pdf | 14 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Veda as on Sept 2023.pdf | 5 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Veda as on Dec 2023.pdf | 5 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 of Veda as on 30-09-2023.pdf | 5 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Veda as on Dec 2023.pdf | 5 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Veda as on Dec 2023.pdf | 13 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Veda as on Dec 2023.pdf | 13 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Veda as on Dec 2023.pdf | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM I VEDA.pdf | 5 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Veda as on March 2023.pdf | 11 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Veda as on June 2023.pdf | 11 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Veda as on 31-03-2023.pdf | 9 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Veda as on 30-06-2023.pdf | 9 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Veda as on 30-09-2022.pdf | 22 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Veda as on 31-12-2022.pdf | 22 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Veda as on 30-09-2022.pdf | 22 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Veda as on 31-12-2022.pdf | 22 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Veda as on March 2023.pdf | 13 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Veda as on 31-03-2023.pdf | 13 Jun 2023 |
| CERSAI detailsFile: Veda.pdf | 28 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Veda Form 1.pdf | 9 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM II.pdf | 9 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III.pdf | 9 Aug 2022 |
| Building plan approvalFile: PLAN1.pdf | 16 Feb 2022 |
| Building plan approvalFile: PLAN2.pdf | 16 Feb 2022 |
| Building plan approvalFile: PLAN3.pdf | 16 Feb 2022 |
| Building plan approvalFile: PLAN4.pdf | 16 Feb 2022 |
| Building plan approvalFile: PLAN5.pdf | 16 Feb 2022 |
| Building plan approvalFile: PLAN6.pdf | 16 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN1.pdf | 16 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN2.pdf | 16 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN3.pdf | 16 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN4.pdf | 16 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN5.pdf | 16 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN6.pdf | 16 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED CC.pdf | 16 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 15 Jul 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 15 Jul 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 certificate.pdf | 15 Jul 2021 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf | 15 Jul 2021 |
| Building plan approvalFile: LGR GR 13.pdf | 13 Oct 2020 |
| Building plan approvalFile: First Floor Plan.pdf | 13 Oct 2020 |
| Building plan approvalFile: Floor Plan.pdf | 13 Oct 2020 |
| Building plan approvalFile: Gound floor Plan.pdf | 13 Oct 2020 |
| Building plan approvalFile: Lower Ground Floor Plan.pdf | 13 Oct 2020 |
| Building plan approvalFile: Second Floor Plan.pdf | 13 Oct 2020 |
| Layout approvalFile: Layout Plan_.pdf | 13 Oct 2020 |
| Copy of Layout Approval (in case of layout)File: Layout Plan_.pdf | 13 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: LGR GR 13.pdf | 13 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: First Floor Plan.pdf | 13 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Floor Plan.pdf | 13 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Gound floor Plan.pdf | 13 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Lower Ground Floor Plan.pdf | 13 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Second Floor Plan.pdf | 13 Oct 2020 |
| Declaration in FORM BFile: Affidavit Form B.pdf | 13 Oct 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SARVAM | KASARVADAVLI | 70 | Completed | Aug 2016 | Late, Mar 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
Keep VEDA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kasarvadavali7,600+ in Thane
Godrej Emerald Thane
Godrej Greenview Housing Private Limited
NORTH IMPERIAL GREENS -TOWER 2
Skylark Buildspace Private Limited
VIHANG MARINA
BALAJI ENTERPRISES
Puranik City Reserva Phase 1
Puranik Builders Limited
NORTH IMPERIAL GREENS - TOWER 1
Skylark Buildspace Private Limited
RAUNAK 108
UNNATHI ASSOCIATES
See every Thane project, with the district possession charts
Builder: Sagar Enterprise
Sagar Enterprise has 6 registrations on MahaRERA, including PEARL and SHUBHAM. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if VEDA is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VEDA?
The registered promoter entity is Sagar Enterprise, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VEDA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VEDA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VEDA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VEDA?
The professionals named in the filing: Architect: SMT SUVARNA GHOSH; Engineer: TECHLINE CONSULTING ENGINEERS; Engineer: SK Consultants & Engineers; Chartered Accountant: SARANG DESAI & ASSOCIATES; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VEDA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback