Home / Browse projects / Pune, Maharashtra / Ved Tanish Phase I
Ved Tanish Phase I
RG-MH-86774 · RERA P52100048421 · Last updated on MahaRERA portal: 7 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ved Tanish Phase I is a Residential / Group Housing project by Bandal Jarande Ventures in Pune, Maharashtra, registered with MahaRERA as P52100048421 on 3 Jan 2023. Possession is promised by 25 Apr 2027. The completion date has moved by 12 months from the original filing. 18 of the 32 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameVed Tanish Phase I
- TypeResidential / Group Housing
- Location
- Wadachiwadi Road
- Undri
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100048421
- ReraGenie IDRG-MH-86774
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jan 2023
- Promised completion25 Apr 2027
- Revised completionRevised to 25 Apr 2027 (originally 25 Apr 2026)
- Buildings2 building records
- Documents filed111 files
Current status
Figures as on 7 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Building | NA | 4 | 4 | 16 | 0 | 16 |
| B Building | NA | 4 | 4 | 0 | 16 | 16 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
A Building82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Building82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Mr. Jeevan Prataprao Pawar | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A Building | NA | Rs 2.37 cr | Rs 2.35 cr |
| B Building | NA | Rs 1.24 cr | Rs 1.22 cr |
| - | NA | Rs 57.11 lakh | Rs 54.25 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Yogiraj Gajbhar |
| Engineer | Mr. Sachin Yadav |
| Engineer | Mahesh Baste |
| Chartered Accountant | Satish Aghav |
| Chartered Accountant | Kailash R Mundada & Co |
| Partner | Role in project |
|---|---|
| Bandal Jarande Ventures | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn order to achieve better planning, unified amenities, and enhanced benefits for the allottees of both projects, we propose to amalgamate Ved Tanish Phase I with Ved Tanish Phase II.For the purpose of completing the necessary procedural, legal, and administrative formalities related to this amalgamation, we request an extension of the registration period of Ved Tanish Phase I.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 25 Apr 2027
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: BJV Phase 1 Form 1.pdf | 7 Aug 2026 |
| Withdrawal Update Form 2File: BJV Phase 1 Form 2.PDF | 7 Aug 2026 |
| Withdrawal Update Form 3File: Signed Form 3.pdf | 7 Aug 2026 |
| Withdrawal Update Form 1File: BJV Phase 1 form 1.PDF | 4 May 2026 |
| Withdrawal Update Form 2File: BJV Phase 1 form 2.PDF | 4 May 2026 |
| Withdrawal Update Form 3File: BJV Phase 1 form 3 Signed-Updated.pdf | 4 May 2026 |
| Form 5 (FY 2022-2023)File: Form 5 22-23.PDF | 9 Apr 2026 |
| Form 5 (FY 2023-2024)File: Form 5 23-24.PDF | 9 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 24-25.PDF | 9 Apr 2026 |
| Form 2A (FY 2022-2023)File: BJV Form 2 A 2022-23.PDF | 30 Mar 2026 |
| Form 2A (FY 2023-2024)File: BJV Form 2 A 2023-24.PDF | 30 Mar 2026 |
| Form 2A (FY 2024-2025)File: BJV Form 2 A 2024-25.PDF | 30 Mar 2026 |
| Form 1File: BJV 1 Form I.pdf | 4 Feb 2026 |
| Form 2File: BJV Phase 1 Form 2.pdf | 4 Feb 2026 |
| Form 3File: Signed Form 3 BJV phase 1.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: BJV1 Sold n Unsold.pdf | 4 Feb 2026 |
| Self-declaration of Quarterly ProgressFile: BJV 1 Declaration.pdf | 4 Feb 2026 |
| Form 1File: BJV form 1.pdf | 31 Oct 2025 |
| Form 2File: BJV phase 1 form 2.PDF | 31 Oct 2025 |
| Form 3File: BJV 1 FORM 3.PDF | 31 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: BJV phase 1 sold unsold inventor.PDF | 31 Oct 2025 |
| Self-declaration of Quarterly ProgressFile: BJV phase 1 Self declaration.PDF | 31 Oct 2025 |
| Form 1File: BJV form 1.PDF | 13 Aug 2025 |
| Form 2File: BJV form 2.PDF | 13 Aug 2025 |
| Form 3File: BJV Form 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: BJV Sold Unsold Inventory disclosure.PDF | 13 Aug 2025 |
| Self-declaration of Quarterly ProgressFile: BJV declaration.PDF | 13 Aug 2025 |
| Form 1File: Bandal Jarande Venture form 1.pdf | 22 May 2025 |
| Form 2File: form 2 June 23.PDF | 22 May 2025 |
| Form 3File: FORM 3.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf | 22 May 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration.PDF | 22 May 2025 |
| Form 1File: Bandal Jarande Venture form 1.pdf | 22 May 2025 |
| Form 2File: form 2 June 23.PDF | 22 May 2025 |
| Form 3File: FORM 3.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf | 22 May 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration.PDF | 22 May 2025 |
| Form 1File: Bandal Jarande Venture form 1.pdf | 22 May 2025 |
| Form 2File: form 2 Dec23.PDF | 22 May 2025 |
| Form 3File: FORM 3.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf | 22 May 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration.PDF | 22 May 2025 |
| Form 1File: Bandal Jarande Venture form 1.pdf | 22 May 2025 |
| Form 2File: form 2 March 24.PDF | 22 May 2025 |
| Form 3File: FORM 3.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf | 22 May 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration.PDF | 22 May 2025 |
| Form 1File: form 1 June 24.PDF | 22 May 2025 |
| Form 2File: form 2 June 24.PDF | 22 May 2025 |
| Form 3File: form 3 June 24.PDF | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf | 22 May 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration.PDF | 22 May 2025 |
| Form 1File: Bandal Jarande Venture form 1.PDF | 22 May 2025 |
| Form 2File: Bandal Jarande Venture form 2.PDF | 22 May 2025 |
| Form 3File: Bandal Jarande Venture form 3.PDF | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf | 22 May 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration.PDF | 22 May 2025 |
| Form 1File: Bandal Jarande Venture form 1.PDF | 22 May 2025 |
| Form 2File: Bandal Jarande Venture form 2.PDF | 22 May 2025 |
| Form 3File: Bandal Jarande Venture_Darft FORM 3.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf | 22 May 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration.PDF | 22 May 2025 |
| Form 1File: form 1.pdf | 20 May 2025 |
| Form 2File: form 2 May 23.PDF | 20 May 2025 |
| Form 3File: form 3 May 23.PDF | 20 May 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration.PDF | 20 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf | 20 May 2025 |
| Form 1File: Disclosure of Sold and Unsold Inventory.pdf | 20 May 2025 |
| Form 2File: form 1.pdf | 20 May 2025 |
| Form 3File: self declaration.PDF | 20 May 2025 |
| Disclosure of Sold and Booked InventoryFile: form 2 May 23.PDF | 20 May 2025 |
| Self-declaration of Quarterly ProgressFile: form 3 May 23.PDF | 20 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_ph I_Bandal Jarande Venture .pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_Form 3_BJV Phase I.PDF | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_BJV Phase 1.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY DETAILS.PDF | 2 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5.PDF | 19 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF | 9 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold , Booked Unsold, Inventory.PDF | 8 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF | 27 May 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Aashritha A Building | 1595 1 Chikhali PCMC | 52 | Completed | Dec 2019 | Mar 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ved Tanish Phase I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Undri13,700+ in Pune
Filed coordinates, straight-line distance. 138 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: Bandal Jarande Ventures
Bandal Jarande Ventures has 2 registrations on MahaRERA, including Ved Tanish Phase I and Ved Tanish Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Ved Tanish Phase I is delayed beyond 25 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ved Tanish Phase I?
The registered promoter entity is Bandal Jarande Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ved Tanish Phase I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Ved Tanish Phase I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ved Tanish Phase I?
The professionals named in the filing: Architect: Yogiraj Gajbhar; Engineer: Mr. Sachin Yadav; Engineer: Mahesh Baste; Chartered Accountant: Satish Aghav; Chartered Accountant: Kailash R Mundada & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ved Tanish Phase I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback