Home / Browse projects / Pune, Maharashtra / Ved Tanish Phase I

Registered No litigation declared Residential / Group Housing project

Ved Tanish Phase I

By Bandal Jarande Ventures

RG-MH-86774 · RERA P52100048421 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 12 months from the original
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
14 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

Ved Tanish Phase I is a Residential / Group Housing project by Bandal Jarande Ventures in Pune, Maharashtra, registered with MahaRERA as P52100048421 on 3 Jan 2023. Possession is promised by 25 Apr 2027. The completion date has moved by 12 months from the original filing. 18 of the 32 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameVed Tanish Phase I
  • TypeResidential / Group Housing
  • Location
    • Wadachiwadi Road
    • Undri
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048421
  • ReraGenie IDRG-MH-86774

Builder

  • NameBandal Jarande Ventures
  • Entity typePartnership
  • PartnersGanesh Vasant Jarande, Nivrutti Dnyanoba Bandal
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023First promiseApr 2026Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion25 Apr 2027
  • Revised completionRevised to 25 Apr 2027 (originally 25 Apr 2026)
  • Buildings2 building records
  • Documents filed111 files

Current status

56%18 of 32 units booked
98.5%Work done, per cost certificate

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA4416016
B BuildingNA4401616

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A Building82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Building82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Apr 2026
LandownerVillageDistrict
Mr. Jeevan Prataprao PawarPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI1790.81
Proposed, not sanctioned1,072 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDhanakawadi
Estimated costRs 4.18 cr
Cost incurredRs 4.12 cr
Work done98.45%
BuildingWingEstimatedIncurred
A BuildingNARs 2.37 crRs 2.35 cr
B BuildingNARs 1.24 crRs 1.22 cr
-NARs 57.11 lakhRs 54.25 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogiraj Gajbhar
EngineerMr. Sachin Yadav
EngineerMahesh Baste
Chartered AccountantSatish Aghav
Chartered AccountantKailash R Mundada & Co
PartnerRole in project
Bandal Jarande Ventures-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09042620591Apr 2026 → Apr 2027

Reason as filed by the promoterIn order to achieve better planning, unified amenities, and enhanced benefits for the allottees of both projects, we propose to amalgamate Ved Tanish Phase I with Ved Tanish Phase II.For the purpose of completing the necessary procedural, legal, and administrative formalities related to this amalgamation, we request an extension of the registration period of Ved Tanish Phase I.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Apr 2027

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: BJV Phase 1 Form 1.pdf7 Aug 2026
Withdrawal Update Form 2File: BJV Phase 1 Form 2.PDF7 Aug 2026
Withdrawal Update Form 3File: Signed Form 3.pdf7 Aug 2026
Withdrawal Update Form 1File: BJV Phase 1 form 1.PDF4 May 2026
Withdrawal Update Form 2File: BJV Phase 1 form 2.PDF4 May 2026
Withdrawal Update Form 3File: BJV Phase 1 form 3 Signed-Updated.pdf4 May 2026
Form 5 (FY 2022-2023)File: Form 5 22-23.PDF9 Apr 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.PDF9 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 24-25.PDF9 Apr 2026
Form 2A (FY 2022-2023)File: BJV Form 2 A 2022-23.PDF30 Mar 2026
Form 2A (FY 2023-2024)File: BJV Form 2 A 2023-24.PDF30 Mar 2026
Form 2A (FY 2024-2025)File: BJV Form 2 A 2024-25.PDF30 Mar 2026
Form 1File: BJV 1 Form I.pdf4 Feb 2026
Form 2File: BJV Phase 1 Form 2.pdf4 Feb 2026
Form 3File: Signed Form 3 BJV phase 1.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: BJV1 Sold n Unsold.pdf4 Feb 2026
Self-declaration of Quarterly ProgressFile: BJV 1 Declaration.pdf4 Feb 2026
Form 1File: BJV form 1.pdf31 Oct 2025
Form 2File: BJV phase 1 form 2.PDF31 Oct 2025
Form 3File: BJV 1 FORM 3.PDF31 Oct 2025
Disclosure of Sold and Booked InventoryFile: BJV phase 1 sold unsold inventor.PDF31 Oct 2025
Self-declaration of Quarterly ProgressFile: BJV phase 1 Self declaration.PDF31 Oct 2025
Form 1File: BJV form 1.PDF13 Aug 2025
Form 2File: BJV form 2.PDF13 Aug 2025
Form 3File: BJV Form 3.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: BJV Sold Unsold Inventory disclosure.PDF13 Aug 2025
Self-declaration of Quarterly ProgressFile: BJV declaration.PDF13 Aug 2025
Form 1File: Bandal Jarande Venture form 1.pdf22 May 2025
Form 2File: form 2 June 23.PDF22 May 2025
Form 3File: FORM 3.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf22 May 2025
Self-declaration of Quarterly ProgressFile: self declaration.PDF22 May 2025
Form 1File: Bandal Jarande Venture form 1.pdf22 May 2025
Form 2File: form 2 June 23.PDF22 May 2025
Form 3File: FORM 3.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf22 May 2025
Self-declaration of Quarterly ProgressFile: self declaration.PDF22 May 2025
Form 1File: Bandal Jarande Venture form 1.pdf22 May 2025
Form 2File: form 2 Dec23.PDF22 May 2025
Form 3File: FORM 3.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf22 May 2025
Self-declaration of Quarterly ProgressFile: self declaration.PDF22 May 2025
Form 1File: Bandal Jarande Venture form 1.pdf22 May 2025
Form 2File: form 2 March 24.PDF22 May 2025
Form 3File: FORM 3.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf22 May 2025
Self-declaration of Quarterly ProgressFile: self declaration.PDF22 May 2025
Form 1File: form 1 June 24.PDF22 May 2025
Form 2File: form 2 June 24.PDF22 May 2025
Form 3File: form 3 June 24.PDF22 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf22 May 2025
Self-declaration of Quarterly ProgressFile: self declaration.PDF22 May 2025
Form 1File: Bandal Jarande Venture form 1.PDF22 May 2025
Form 2File: Bandal Jarande Venture form 2.PDF22 May 2025
Form 3File: Bandal Jarande Venture form 3.PDF22 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf22 May 2025
Self-declaration of Quarterly ProgressFile: self declaration.PDF22 May 2025
Form 1File: Bandal Jarande Venture form 1.PDF22 May 2025
Form 2File: Bandal Jarande Venture form 2.PDF22 May 2025
Form 3File: Bandal Jarande Venture_Darft FORM 3.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf22 May 2025
Self-declaration of Quarterly ProgressFile: self declaration.PDF22 May 2025
Form 1File: form 1.pdf20 May 2025
Form 2File: form 2 May 23.PDF20 May 2025
Form 3File: form 3 May 23.PDF20 May 2025
Self-declaration of Quarterly ProgressFile: self declaration.PDF20 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf20 May 2025
Form 1File: Disclosure of Sold and Unsold Inventory.pdf20 May 2025
Form 2File: form 1.pdf20 May 2025
Form 3File: self declaration.PDF20 May 2025
Disclosure of Sold and Booked InventoryFile: form 2 May 23.PDF20 May 2025
Self-declaration of Quarterly ProgressFile: form 3 May 23.PDF20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_ph I_Bandal Jarande Venture .pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_Form 3_BJV Phase I.PDF2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_BJV Phase 1.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY DETAILS.PDF2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5.PDF19 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF9 Jun 2023
Disclosure of sold/ booked inventoryFile: Discolsure of Sold , Booked Unsold, Inventory.PDF8 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF27 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Aashritha A Building1595 1 Chikhali PCMC52CompletedDec 2019Mar 2019

How this compares with Pune

56%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ved Tanish Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Undri13,700+ in Pune

2 kmVed Tanish Phase ICompleted 68Lapsed / revoked 26Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 138 registered projects within 2 km.

Builder: Bandal Jarande Ventures

Bandal Jarande Ventures has 2 registrations on MahaRERA, including Ved Tanish Phase I and Ved Tanish Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Ved Tanish Phase I is delayed beyond 25 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ved Tanish Phase I?

The registered promoter entity is Bandal Jarande Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ved Tanish Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ved Tanish Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ved Tanish Phase I?

The professionals named in the filing: Architect: Yogiraj Gajbhar; Engineer: Mr. Sachin Yadav; Engineer: Mahesh Baste; Chartered Accountant: Satish Aghav; Chartered Accountant: Kailash R Mundada & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ved Tanish Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ved Tanish Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ved Tanish Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.