Home / Browse projects / Pune, Maharashtra / Vardhaman Riddhi

Registered No litigation declared Others project

Vardhaman Riddhi

By Vardhaman Developers

RG-MH-19432 · RERA P52100077714 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 55%
20 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Vardhaman Riddhi is a Others project by Vardhaman Developers in Pune, Maharashtra, registered with MahaRERA as P52100077714 on 23 Oct 2024. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 0 of the 20 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameVardhaman Riddhi
  • TypeOthers
  • Location
    • Wadgaon Sheri
    • Wadgaon Bk
    • Haveli
    • Pune
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077714
  • ReraGenie IDRG-MH-19432

Builder

  • NameVardhaman Developers
  • Entity typePartnership
  • PartnersRajesh Prakashchandra Gandhi, Babita Kantilal Gandhi, Deepak Biharilal Jain, Satish Kantilal Parmar
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2024First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2024
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed74 files

Current status

0%0 of 20 units booked
31.6%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vardhaman RiddhiNA8618220

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 55%.

Vardhaman Riddhi: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered27
Open Space83

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,129 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on23 May 2025

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation
Permissible FSI2399.34
Proposed, not sanctioned2,399 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRASTAPETH BRANCH,RASTA PETH,NEAR TARACHAND HOSPITAL,PUNE,411002
Estimated costRs 13.00 cr
Cost incurredRs 4.11 cr
Work done31.59%
BuildingWingEstimatedIncurred
Vardhaman RiddhiNARs 12.00 crRs 4.11 cr
-NARs 1.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectElement 5, Architectural Design Studio through Jaydeep Deshpande
ArchitectJaydeep Deshpande
EngineerSATISH PARMAR
Chartered AccountantANJK & Co LLP
Chartered AccountantGN Mantri and Associates
PartnerRole in project
Vardhaman Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA11042620613Mar 2026 → Mar 2027

Reason as filed by the promoterThe project has been affected by a shortage of skilled labour due to the recent festive season, during which a significant portion of the workforce remained unavailable, leading to reduced productivity and slowdown of critical construction activities. In addition, there was a shortage and delayed procurement of essential raw materials, which disrupted the planned construction sequence and caused intermittent work stoppages. Furthermore, the implementation of the latest sanctioned plans received up to the 8th floor required re-planning of activities, additional coordination, and minor modificat

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate March 2026.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer certificate March 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: Form3 CA Certificate - March 2026.pdf24 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf11 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Dec 2025.pdf27 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Dec 2025.pdf27 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Dec 2025.pdf27 Jan 2026
Layout approvalFile: Layout Approval.pdf11 Dec 2025
Building plan approvalFile: Building Plan 1.pdf11 Dec 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate September 2025.pdf11 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate September 2025.pdf11 Dec 2025
Withdrawal Update Form 3File: Form 3 CA Certificate September 2025.pdf11 Dec 2025
Layout approvalFile: Layout Approval.pdf8 Dec 2025
Building plan approvalFile: Building Plan 1.pdf8 Dec 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate September 2025.pdf5 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate September 2025.pdf5 Dec 2025
Withdrawal Update Form 3File: Form 3 CA Certificate September 2025.pdf5 Dec 2025
Form 5 (FY 2024-2025)File: CA Form 5_FY 2024-25 Signed.pdf9 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate June 25.pdf30 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate June 25.pdf30 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate June 25.pdf30 Jul 2025
Form 1File: Form 1 Architect Certificate - March 2025.pdf9 Jun 2025
Form 2File: Form 2 Engineer Certificate - March 2025.pdf9 Jun 2025
Form 3File: Form 3 CA Certificate - March 2025 - Signed.pdf9 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - March 2025.pdf9 Jun 2025
Self-declaration of Quarterly ProgressFile: RERA self declaration of QPR.pdf9 Jun 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2025.pdf9 Jun 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - March 2025.pdf9 Jun 2025
Withdrawal Update Form 3File: Form 3 CA Certificate - March 2025 - Signed.pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Dec 2024 - Sign.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory December 2024.pdf6 Mar 2025
Proforma of Allotment letterFile: Final Allotment Draft Vardhaman Developers.pdf30 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report on allotment letter-scan.pdf30 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement_Vardhaman Developers.pdf30 Oct 2024
Proforma of Agreement for saleFile: Final Agreement for Sale Vardhaman Developers.pdf30 Oct 2024
Proforma of Allotment letterFile: Final Allotment Draft Vardhaman Developers.pdf30 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report on allotment letter-scan.pdf30 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement_Vardhaman Developers.pdf30 Oct 2024
Proforma of Agreement for saleFile: Final Agreement for Sale Vardhaman Developers.pdf30 Oct 2024
Other - LegalFile: Index 2_Compressed.pdf9 Oct 2024
Other - LegalFile: 7 12 Extract.pdf9 Oct 2024
Other - LegalFile: No DP Remarks Declaration-scan.pdf9 Oct 2024
Proforma of Allotment letterFile: Final Allotment Draft Vardhaman Developers.pdf10 Aug 2024
Proforma of Agreement for saleFile: Final Agreement for Sale Vardhaman Developers.pdf10 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the project-scan Merged.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Final.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Final.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-scan_compressed.pdf8 Aug 2024
CERSAI detailsFile: Asset Based Search 08082024.pdf8 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Bank Promoter.pdf8 Aug 2024
Other - TechnicalFile: 1 Other - Legal.pdf8 Aug 2024
Other - TechnicalFile: Declaration cum Undertaking for Multiple registration for same project-scan.pdf8 Aug 2024
Details of encumbrances concerned to FinanceFile: Encrumbrance certificate Legal and Finance.pdf7 Aug 2024
Declaration in FORM BFile: Form B -Declaration by promoter.pdf7 Aug 2024
Declaration about Commencement CertificateFile: CC Declaration-scan.pdf7 Aug 2024
CERSAI detailsFile: Cersai Declaration-scan.pdf7 Aug 2024
Deviation Report with respect to Allotment letterFile: Final Allotment Draft Vardhaman Developers.pdf7 Aug 2024
Details of encumbrances concerned to LegalFile: Encrumbrance certificate Legal and Finance.pdf7 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Final Agreement for Sale Vardhaman Developers.pdf7 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1_Declaration relating to Other Real Estate - RPG-scan.pdf7 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2_Declaration relating to Other Real Estate - BDG-scan.pdf7 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3_Declaration relating to Other Real Estate - SKP-scan.pdf7 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 4_Declaration relating to Other Real Estate - DBJ-scan.pdf7 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B for Bank-scan.pdf7 Aug 2024
Copy of the legal title reportFile: Search Title Report_compressed.pdf1 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Mail Screenshot.pdf1 Jun 2024
Building plan approvalFile: Building Plan_compressed.pdf15 May 2024
Layout approvalFile: Layout Approval_compressed.pdf15 May 2024
PAN CardFile: Firm PAN Card.pdf15 May 2024
Copy of Layout Approval (in case of layout)File: Layout Approval_compressed.pdf15 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf15 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_compressed.pdf15 May 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vardhaman Riddhi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadgaon Sheri13,700+ in Pune

2 kmVardhaman RiddhiCompleted 44Lapsed / revoked 21Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 128 registered projects within 2 km.

Builder: Vardhaman Developers

VARDHAMAN DEVELOPERS has 8 registrations on MahaRERA, including SAPPHIRE and SAI DRISHTI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vardhaman Riddhi is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vardhaman Riddhi?

The registered promoter entity is Vardhaman Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vardhaman Riddhi?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vardhaman Riddhi?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vardhaman Riddhi?

The professionals named in the filing: Architect: Element 5, Architectural Design Studio through Jaydeep Deshpande; Architect: Jaydeep Deshpande; Engineer: SATISH PARMAR; Chartered Accountant: ANJK & Co LLP; Chartered Accountant: GN Mantri and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vardhaman Riddhi?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vardhaman Riddhi. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vardhaman Riddhi to a free account