Varad Vinayak Residency
By Varadvinayak Builders and Developers
RG-MH-11575 · RERA P52700009635 · Last updated on MahaRERA portal: 17 Apr 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Varad Vinayak Residency is a Residential / Group Housing project by Varadvinayak Builders and Developers in Satara, Maharashtra, registered with MahaRERA as P52700009635 on 22 Aug 2017. The registration is recorded completed; possession was promised by 13 May 2023.
At a glance
Project
- NameVarad Vinayak Residency
- TypeResidential / Group Housing
- Location
- Kolki (CT)
- Phaltan
- Satara
- 415523
- Pincode415523
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700009635
- ReraGenie IDRG-MH-11575
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Aug 2017
- Promised completion13 May 2023
- Revised completionNone
- Buildings29 building records
- Documents filed153 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Row House 1 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 2 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 3 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 4 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 5 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 6 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 7 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 8 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 9 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 10 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 11 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 12 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 14 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 15 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 16 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 17 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 18 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 19 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 20 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 21 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 22 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 23 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 24 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 25 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 26 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 27 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 28 | NA | 2 | 0 | 0 | 0 | 0 |
| Row House 29 | NA | 2 | 0 | 0 | 0 | 0 |
| Plot No 13 | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 17 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 29 buildings; the table lists the first 20.
252 of 319 construction stages are filed complete across 29 buildings. The stage furthest along is Podiums (if any), at 0%.
Row House 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 782%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 1082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 1182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 1282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 1482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 1582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 1682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 1782%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 1882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 1982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 2082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House 2182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed29
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Row House 1 | 0 | 1 | 1 |
| Row House 2 | 0 | 1 | 1 |
| Row House 3 | 0 | 1 | 1 |
| Row House 4 | 0 | 1 | 1 |
| Row House 5 | 0 | 1 | 1 |
| Row House 6 | 0 | 1 | 1 |
| Row House 7 | 0 | 1 | 1 |
| Row House 8 | 0 | 1 | 1 |
| Row House 9 | 0 | 1 | 1 |
| Row House 10 | 0 | 1 | 1 |
| Row House 11 | 0 | 1 | 1 |
| Row House 12 | 0 | 1 | 1 |
| Row House 14 | 0 | 1 | 1 |
| Row House 15 | 0 | 1 | 1 |
| Row House 16 | 0 | 1 | 1 |
| Row House 17 | 0 | 1 | 1 |
| Row House 18 | 0 | 1 | 1 |
| Row House 19 | 0 | 1 | 1 |
| Row House 20 | 0 | 1 | 1 |
| Row House 21 | 0 | 1 | 1 |
| Row House 22 | 0 | 1 | 1 |
| Row House 23 | 0 | 1 | 1 |
| Row House 24 | 0 | 1 | 1 |
| Row House 25 | 0 | 1 | 1 |
| Row House 26 | 0 | 1 | 1 |
| Row House 27 | 0 | 1 | 1 |
| Row House 28 | 0 | 1 | 1 |
| Row House 29 | 0 | 1 | 1 |
| Plot No 13 | 1 | 0 | 1 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Varadvinayak Builders and Developers | Phaltan (M Cl) | Satara |
| Varadvinayak Builiders and Developers | Phaltan (M Cl) | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajendra Shivaling Jangam |
| Engineer | Ramdas Ravasaheb Jagtap |
| Chartered Accountant | O S CHANDAK & CO |
| Partner | Role in project |
|---|---|
| Varadvinayak Builders and Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Feb 2023
Documents filed153
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: 1.pdf | 17 Apr 2023 |
| Details of encumbrances concerned to LegalFile: 1.pdf | 17 Apr 2023 |
| CERSAI detailsFile: 1.pdf | 17 Apr 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of AGREEMENT FOR SALE.pdf | 17 Apr 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECT CERTIFICATE.pdf | 17 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 2.pdf | 17 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: allotment letter.pdf | 17 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: 1 Proforma of AGREEMENT FOR SALE.pdf | 17 Apr 2023 |
| Certificates of CA (Form 3)File: form 3.pdf | 16 Apr 2023 |
| Certificates of CA (Form 3)File: ca certification.pdf | 9 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ca certification.pdf | 9 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ca certification.pdf | 9 Feb 2023 |
| Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 01.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 02.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 03.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 04.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 05.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 06.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 07.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 08.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 09.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 10.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 11.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 12.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 14.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 15.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 16.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 17.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 18.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 19.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 20.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 21.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 22.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 23.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 24.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 25.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 26.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 27.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 28.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 29.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 01.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 02.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 03.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 04.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 05.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 06.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 07.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 08.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 09.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 10.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 11.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 12.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 14.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 15.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 16.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 17.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 18.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 19.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 20.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 21.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 22.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 23.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 24.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 25.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 26.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 27.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 28.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec 29.pdf | 5 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE.pdf | 5 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf | 5 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Rajendra jangam disclosure.pdf | 5 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: poonam jangam disclosure.pdf | 5 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: row house 8 OC.pdf | 5 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: row house 20 complete.pdf | 5 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: row house 21 complete.pdf | 5 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: row house 28 OC.pdf | 5 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: row house 29 OC.pdf | 5 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: row house no 19 OC.pdf | 5 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: row house no 27 OC.pdf | 5 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 153 filed documents as one ZIP, foldered, with a manifest
Keep Varad Vinayak Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kolki (CT)1,100+ in Satara
Filed coordinates, straight-line distance. 30 registered projects within 2 km.
Plotted development scheme at S.No.129.Wathar
Pune Housing & Area Development Board
ALPHA WORLD
PARAG PRAMOD DHADIWAL
INDUS LANDMARK
INDUS PROMOTERS
SWARA CITY
JAGDISH RAMVILAS KARVA
EMPIRE TOWERS
RAM AND J K ASSOCIATES
TRIANGLE HEIGHTS
MIG CONSTRUCTION LLP
See every Satara project, with the district possession charts
Builder: Varadvinayak Builders and Developers
Varadvinayak Builders and Developers has 3 registrations on MahaRERA, including Varad Vinayak Residency and Sai Mauli. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if Varad Vinayak Residency is delayed beyond 13 May 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Varad Vinayak Residency?
The registered promoter entity is Varadvinayak Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Varad Vinayak Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Varad Vinayak Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Varad Vinayak Residency?
The professionals named in the filing: Architect: Rajendra Shivaling Jangam; Engineer: Ramdas Ravasaheb Jagtap; Chartered Accountant: O S CHANDAK & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Varad Vinayak Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback