Home / Browse projects / Pune, Maharashtra / VAASTU IMPERIAL Wing B
VAASTU IMPERIAL Wing B
By M/S Twin Star Infrastructure
RG-MH-24759 · RERA P52100007631 · Last updated on MahaRERA portal: 14 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 42 complaints at MahaRERA
- Completion date moved by 30 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VAASTU IMPERIAL Wing B is a Residential / Group Housing project by M/S Twin Star Infrastructure in Pune, Maharashtra, registered with MahaRERA as P52100007631 on 17 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 30 months from the original filing. 118 of the 125 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 42 complaints are on record with the regulator.
At a glance
Project
- NameVAASTU IMPERIAL Wing B
- TypeResidential / Group Housing
- Location
- Ravet
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100007631
- ReraGenie IDRG-MH-24759
Builder
- NameM/S Twin Star Infrastructure
- Entity typePartnership
- PartnersRohit Kumar Jhunjhunwala, Jhunjhunwala Homes Pvt LTD
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Aug 2017
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 14 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing B | NA | 23 | 21 | 125 | 0 | 125 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 100%.
Wing B: 98% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 92% |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 70% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed142
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ankush Baban Bhondave | Pimpri Chinchawad (M Corp.) | Pune |
| Lavhaji Baban Bhondave | Pimpri Chinchawad (M Corp.) | Pune |
| Maruti Bhondve | Pimpri Chinchawad (M Corp.) | Pune |
| Tukaram Bhondve | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing B | NA | Rs 29.72 cr | Rs 18.34 cr |
| - | NA | Rs 1.56 cr | Rs 1.24 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHITECT MILIND PATIL |
| Architect | Patil and Bugade Associates |
| Engineer | NIKHIL KHARAT |
| Engineer | S K Consultant and Engineers |
| Chartered Accountant | TILOKCHANDNANI & ASSOCIATES |
| Chartered Accountant | Ashish Rathi and Co. |
| Chartered Accountant | Madhusudhan Jain |
| Partner | Role in project |
|---|---|
| M/S Twin Star Infrastructure | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAwaiting Environment Clearance Certificate for Additional Construction and due to COVID outbreak
Reason as filed by the promoterWe, M/s Twin Star Infrastructure, hereby declare the following with respect to the project Vaastu Imperial Wing B, bearing registration number P52100007631, registered under MahaRERA. We sincerely apologize for the delay in the completion of the project and the submission of this request. The delay occurred primarily due to financial constraints faced during the initial stage of the project, as certain investors withdrew their investments and subsequently filed complaints. These unforeseen financial setbacks adversely impacted the project's cash flow, resulting in a slowdown in construction ac
Complaints filed with MahaRERA42
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022893 | Mrs. Nanda Deepak More through POA Holder Mr. Deepak K. More | M/s. Twinstar Infrastructure and others | 24/04/2019 |
| CC005000000064915 | Mrs. Nanda Deepak More through POA Deepak More | M/s. Twinstar Infrastructure, Partnership Firm | 13/07/2021 |
| CC005000000023130 | SATISH MADHAWRAO SAWANT | M/S TWIN STAR INFRASTRUCTURE | 14/06/2019 |
| CC005000000096131 | PRAVIN DADASO PATIL | M/S TWINSTAR INFRASTRUCTURE | 13/10/2021 |
| CC005000000095732 | MS TWINSTAR INFRASTRUCTURES | Sohan Prakash Sakure | 01/07/2021 |
| CC005000000095716 | ARVIND ANKUSHRAO BIRAJDAR | SUNIL KOLEKAR | 25/06/2021 |
| CC005000000177895 | Sandip Arude | Mr. Ashwin R. Wadhiya, Partner through Twinstar Infrastructure | 15/12/2022 |
| CC005000000259062 | Jayashree Rajendra Gunjal | M/S Twinstar Infrastructure | 05/07/2023 |
| CC005000000269473 | Mr. Sohan Prakash Sakure | M/s Twinstar Infrastructure Through its Partners a) Mr. Ashwin H. Wadhiya b) Mr. Sunil Baban Kolekar | 21/09/2023 |
| CC005000000340753 | Rahul Aba More | m/s Twinstar Infrastucture | 14/04/2024 |
| CC005000000340805 | Ajinkya Chandrakant Mali | M/S Twinstar Infrastructure | 19/04/2024 |
| CC005000000340840 | Pushkar Mahajan | M/S Twinstar Infrastructure | 26/04/2024 |
| CC005000000340833 | Bhagyashri Sagar Patil | M/S Twinstar Infrastructure | 26/04/2024 |
| CC005000000340897 | Bharati Pankaj Kolhe | M/S Twinstar Infrastructure | 06/05/2024 |
| CC005000000340896 | Yogeshkumar Anilkumar Alkunchwar | M/S Twinstar Infrastructure | 06/05/2024 |
| CC005000000370974 | Samir Sudhakar Chavan | M/S Twinstar Infrastructure | 21/05/2024 |
| CC005000000411084 | Vikas Mahajan | M/S Twinstar Infrastructure | 06/06/2024 |
| CC005000000421095 | Vishwas Bhikaji Phapale | Twinstar Infrastructure | 11/06/2024 |
| CC005000000441101 | Padmakar Bhikaji Phapale | Twinstar Infrastructure | 11/06/2024 |
| CC005000000471398 | Swami Hemant Ballal | M/S Twinstar Infrastructure | 27/07/2024 |
| CC005000000471523 | Nikhil Gangaram Kusale | M/S Twinstar Infrastructure | 20/08/2024 |
| CC12501582 | Subhash Eknath Wakhare | M/S Twin Star Infrastructure | 13/05/2025 |
| CC12501965 | PRAPHUL PATIL | M/S Twin Star Infrastructure | 16/06/2025 |
| CC12501831 | Asha Ajay Mutha | M/S Twin Star Infrastructure | 04/06/2025 |
| CC12501906 | Dhrubajyoti Chatterjee | M/S Twin Star Infrastructure | 11/06/2025 |
| CC12502827 | Ramesh Ratanlal Jangid | M/S Twin Star Infrastructure | 12/08/2025 |
| CC12504424 | Venkatesh Diliprao Bhinge | M/S Twin Star Infrastructure | 12/12/2025 |
| CC12600752 | Jayashree Rajendra Gunjal | M/S Twin Star Infrastructure | 09/02/2026 |
| CC12601994 | Pramod Balasaheb Bhosale | M/S Twin Star Infrastructure | 04/04/2026 |
| CC12603444 | VINAYAK HARISHCHANDRA MOHITE | M/S Twin Star Infrastructure | 04/06/2026 |
| CC12603456 | ABHAY HARISHCHANDRA MOHITE | M/S Twin Star Infrastructure | 05/06/2026 |
| CC12603588 | SUBODH DHARMRATNA MORE | M/S Twin Star Infrastructure | 10/06/2026 |
| CC12603590 | SANKET SAMBHAJI DHABUGADE | M/S Twin Star Infrastructure | 10/06/2026 |
| CC12603652 | SANTOSH MADHUKAR SURYAWANSHI | M/S Twin Star Infrastructure | 12/06/2026 |
| CC12603678 | JITENDRA VANKETRAO SASTURKAR | M/S Twin Star Infrastructure | 14/06/2026 |
| CC12603687 | NIKHIL GANGARAM KUSALE | M/S Twin Star Infrastructure | 15/06/2026 |
| CC12603757 | MANOJKUMAR GHANSHAMDAS ASRANI | M/S Twin Star Infrastructure | 18/06/2026 |
| CC12603751 | MANOJ DATTATRAY KSHIRSAGAR | M/S Twin Star Infrastructure | 18/06/2026 |
| CC12603784 | SURESH LAXMAN JADHAV | M/S Twin Star Infrastructure | 18/06/2026 |
| CC12603929 | CHAITANYA DAUND | M/S Twin Star Infrastructure | 25/06/2026 |
| CC12604043 | JAYANT CHANDRAKUMAR PAWAR | M/S Twin Star Infrastructure | 29/06/2026 |
| CC12604142 | NITIN SURESH BHADUPOTA | M/S Twin Star Infrastructure | 02/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026.pdf | 14 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf | 14 Aug 2026 |
| Declaration in FORM BFile: Wing B Form B.pdf | 21 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20250313145125.pdf | 18 Mar 2025 |
| Certificates of CA (Form 3)File: 20250318074717.pdf | 18 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Adobe Scan Mar 13, 2025 (1).pdf | 18 Mar 2025 |
| CERSAI detailsFile: Cersai March.pdf | 18 Mar 2025 |
| Declaration in FORM BFile: doc03415820250104165018.pdf | 6 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Wing B.pdf | 6 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 December 2024 7631.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 17-18 7631.pdf | 27 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 7631 5.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19 7631.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20 7631.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21 7631.pdf | 27 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 7631 4.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22 7631.pdf | 27 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 7631 3.pdf | 27 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 7631 2.pdf | 27 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 7631 1.pdf | 27 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24 7631.pdf | 27 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20241213080314.pdf | 13 Dec 2024 |
| Certificates of CA (Form 3)File: 20241213075441.pdf | 13 Dec 2024 |
| Certificates of CA (Form 3)File: 20241213075357.pdf | 13 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: SKMBT_C36422090413190.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Report-1_rotated.pdf | 13 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate Twinstar B.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Report Updated.pdf | 21 Oct 2024 |
| Layout approvalFile: Master Layout.pdf | 24 Feb 2024 |
| Building plan approvalFile: IOD B Wing.pdf | 24 Feb 2024 |
| PAN CardFile: Twinstar PanCard.pdf | 24 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Master Layout.pdf | 24 Feb 2024 |
| Building Plan Approval (IOD)File: IOD B Wing.pdf | 24 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2023.pdf | 24 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2024.pdf | 24 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate 2023.pdf | 24 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2024.pdf | 24 Feb 2024 |
| Certificates of CA (Form 3)File: CA Certificate 2023.pdf | 24 Feb 2024 |
| OtherFile: Deed Of Retirement.pdf | 14 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 31 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch b.pdf | 31 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate B.pdf | 31 Mar 2018 |
| Certificates of CA (Form 3)File: CAC B.pdf | 31 Mar 2018 |
| Layout approvalFile: PROPOSED LAYOUT ROYAL MANSION RAVET.pdf | 1 Aug 2017 |
| Building plan approvalFile: B Wing Typical.pdf | 1 Aug 2017 |
| Building plan approvalFile: B Wing 1.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: Title report1.pdf | 1 Aug 2017 |
| Details of encumbrancesFile: No Encumbrance DECLARATION.pdf | 1 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: PROPOSED LAYOUT ROYAL MANSION RAVET.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: B Wing 1.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: B Wing Typical.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: Form B -Wing b.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate B Wing.pdf | 1 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate B Wing.pdf | 1 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate B Wing.pdf | 1 Aug 2017 |
| Certificates of CA (Form 3)File: B Wing CA.pdf | 1 Aug 2017 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 1 Aug 2017 |
| Proforma of Allotment letterFile: BOOKING AGREEMENT-28072017.pdf | 1 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VAASTU IMPERIAL Wing B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ravet13,700+ in Pune
Filed coordinates, straight-line distance. 294 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: M/S Twin Star Infrastructure
M/S Twin Star Infrastructure has 3 registrations on MahaRERA, including VAASTU IMPERIAL Wing A and VAASTU IMPERIAL Wing B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VAASTU IMPERIAL Wing B is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VAASTU IMPERIAL Wing B?
The registered promoter entity is M/S Twin Star Infrastructure, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VAASTU IMPERIAL Wing B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VAASTU IMPERIAL Wing B?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VAASTU IMPERIAL Wing B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VAASTU IMPERIAL Wing B?
The professionals named in the filing: Architect: ARCHITECT MILIND PATIL; Architect: Patil and Bugade Associates; Engineer: NIKHIL KHARAT; Engineer: S K Consultant and Engineers; Chartered Accountant: TILOKCHANDNANI & ASSOCIATES; Chartered Accountant: Ashish Rathi and Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VAASTU IMPERIAL Wing B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.