Home / Browse projects / Pune, Maharashtra / Urban Skyline Phase II

Registered No litigation declared Residential / Group Housing project

Urban Skyline Phase II

By M/s Urban Space Creators

RG-MH-22399 · RERA P52100031043 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • 34 complaints at MahaRERA
  • Completion date moved by 32 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 32 months from the original
15 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 90%
34Complaints at MahaRERAon this registration
Jump to the 194 documents Report an error

Urban Skyline Phase II is a Residential / Group Housing project by M/s Urban Space Creators in Pune, Maharashtra, registered with MahaRERA as P52100031043 on 1 Oct 2021. Possession is promised by 31 Dec 2027. The completion date has moved by 32 months from the original filing. 34 complaints are on record with the regulator.

At a glance

Project

  • NameUrban Skyline Phase II
  • TypeResidential / Group Housing
  • Location
    • BRTS
    • near Le Stone Restaurant
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031043
  • ReraGenie IDRG-MH-22399

Builder

  • NameM/s Urban Space Creators
  • Entity typePartnership
  • PartnersMohit Subhashchand Daga, Swapnil Gulabchand Sheth, Anil Balkishan Bhangdia
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2021First promiseApr 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Oct 2021
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Apr 2025)
  • Buildings3 building records
  • Documents filed194 files

Current status

71.7%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
2BNA3732000
2 CNA3732000
2 DNA4035000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

2B53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
2 C56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
2 D57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed746

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots746
Closed/Covered596
Open Space150
BuildingClosed/CoveredOpen SpaceTotal
2B20650256
2 C24050290
2 D15050200

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,927 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Sep 2025
LandownerVillageDistrict
Narsinh Rangrao KulkarniPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI53138.85
Proposed, not sanctioned16,845 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChinchwad Pune
Estimated costRs 285.07 cr
Cost incurredRs 204.50 cr
Work done71.74%
BuildingWingEstimatedIncurred
2BNARs 86.33 crRs 65.53 cr
2 CNARs 86.33 crRs 65.53 cr
2 DNARs 86.33 crRs 65.53 cr
-NARs 26.07 crRs 7.89 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSakaar Architects and Planners
EngineerSwapnil G Pawar
EngineerPrafulla Kale
EngineerDigvijay Digambar Kokate
Chartered AccountantMs S C Bathiya Co
Chartered AccountantDoshi Jethale & Associates
PartnerRole in project
M/s Urban Space Creators-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028189Apr 2025 → Dec 2027

Reason as filed by the promoterDue to certain circumstances, we are unable to complete our project. Therefore, we request an extension until 31st December 2027.

Complaints filed with MahaRERA34

Case no.ComplainantRespondentFiled
CC005000000279938Priyanka Giridhar JadhavMohit Subhashchand Daga24/12/2023
CC12504562YOGESH ASHOK ATKARIM/s Urban Space Creators21/12/2025
CC12502862Prasad Chandrakant PandeM/s Urban Space Creators15/08/2025
CC12503278Pritam Vasant DeshpandeM/s Urban Space Creators14/09/2025
CC12503912OMKAR MILIND KULKARNIM/s Urban Space Creators08/11/2025
CC12504543Shailendra Kumar SinghM/s Urban Space Creators20/12/2025
CC12504551Chaitanya Deepak KshirsagarM/s Urban Space Creators20/12/2025
CC12504555Vineet Sanjay WadkeM/s Urban Space Creators20/12/2025
CC12504596PRANITA Muralidhar SHEVAKARIM/s Urban Space Creators23/12/2025
CC12504585Shyam Pradip BihadeM/s Urban Space Creators23/12/2025
CC12504589santosh Suhas GujarM/s Urban Space Creators23/12/2025
CC12504588Anant Kamalakar KulkarniM/s Urban Space Creators23/12/2025
CC12504684Prashant Deepak SakpalM/s Urban Space Creators30/12/2025
CC12504685Prashant Deepak SakpalM/s Urban Space Creators30/12/2025
CC12504666Deepak Ashok HiwarkarM/s Urban Space Creators29/12/2025
CC12504667Deepak Ashok HiwarkarM/s Urban Space Creators29/12/2025
CC12504642Rohan Manohar DeshmukheM/s Urban Space Creators27/12/2025
CC12504644Vishnu Srivastava SrivastavaM/s Urban Space Creators27/12/2025
CC12504669Rohan Manohar DeshmukheM/s Urban Space Creators29/12/2025
CC12504681Himanshu Dilip KondeM/s Urban Space Creators30/12/2025
CC12504693Vrushabh Rajendra KatariyaM/s Urban Space Creators30/12/2025
CC12504695Ritwik SrivastavaM/s Urban Space Creators30/12/2025
CC12504698Abhishek Manohar BaksheM/s Urban Space Creators30/12/2025
CC12504708Tushar Keval ThubeM/s Urban Space Creators31/12/2025
CC12504711Amit sudarshan MyakalM/s Urban Space Creators31/12/2025
CC12504714Arvind Kumar ChadokarM/s Urban Space Creators31/12/2025
CC12600141Ashish Abhijit PatilM/s Urban Space Creators09/01/2026
CC12600036Vishal Ashok SawalkarM/s Urban Space Creators03/01/2026
CC12600142Ashish Abhijit PatilM/s Urban Space Creators09/01/2026
CC12600123Abhijeet Sanjay ChimurkarM/s Urban Space Creators08/01/2026
CC12600215SWAPNIL MILIND KAPOTEM/s Urban Space Creators12/01/2026
CC12601480Sachiin Chandrakant ShindeM/s Urban Space Creators17/03/2026
CC12603915DINESH EWALEM/s Urban Space Creators24/06/2026
CC12604305ABHILASHA ARUN GANVIRM/s Urban Space Creators10/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed194

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 194 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf8 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 phase ll copy new.pdf7 Jul 2026
Withdrawal Update Form 1File: Architect certificate.pdf28 Apr 2026
Withdrawal Update Form 1File: Architect Certificate.pdf28 Apr 2026
Withdrawal Update Form 2File: Engineer certificate.pdf28 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate USC.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 31-3-2026_compressed.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 30-09-2025_compressed.pdf28 Apr 2026
Form 1File: Architect Certificate.pdf16 Feb 2026
Form 2File: Engineer Certificate USC.pdf16 Feb 2026
Form 3File: Form 3 30-09-2025_compressed.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold_Unsold.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold_Unsold.pdf16 Feb 2026
Form 1File: ARCHITECT CERTIFHCATE.pdf16 Feb 2026
Form 2File: ENGINEER CERTIFICATE.pdf16 Feb 2026
Form 3File: Urban Space Creators Form 3 Dec 2025_compressed.pdf16 Feb 2026
Other - TechnicalFile: Form 2A FY-24-25.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY-22-23.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY-23-24.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - converted.pdf14 Apr 2025
Declaration in FORM BFile: Form B.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure.pdf12 Apr 2025
CERSAI detailsFile: Declaration-Nil-CERSAI Report.pdf12 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf12 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_21-22.pdf12 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the project.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 march 2025_compressed (1).pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Combine-Copy 2.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory 2D-wing 31-03-2025.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory 2B-wing 31-03-2025.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold and Booked Inventory 2C-wing 31-03-2025.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory PH-2 Shops 31-03-2025.pdf11 Apr 2025
Other - TechnicalFile: Arch certificate Urban.pdf11 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (1).pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engg Certificate March 2023.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engg Certificate March 2024.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122024.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122024.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31122024.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certif sep 24.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 Arch Cert.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Cert.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca cert.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA sept 2024.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Cert.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng cert.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate sep 24.pdf25 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 USC Ph 2.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Phase 2.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Rera Phase II.pdf31 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Phase II.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate.PDF30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase I.pdf17 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase II.pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 engineer's certificate ph-1.pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineer's certificate ph-2.pdf17 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert PH-I.pdf17 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert PH-II.pdf17 May 2023
Proforma of Agreement for saleFile: Draft Agreement USC PH I 2022.pdf17 May 2023
Proforma of Agreement for saleFile: Draft Agreement USC Phase II 2022.pdf17 May 2023
Layout approvalFile: 01 Layout 2022_11zon.pdf15 Mar 2023
Building plan approvalFile: 2 Sanction plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 3 parking plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 4 parking plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 5 parking plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 6 parking plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 7 stilt floor_11zon.pdf15 Mar 2023
Building plan approvalFile: 8 first floor_11zon.pdf15 Mar 2023
Building plan approvalFile: 9 Floor plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 10 Floor plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 11 Floor plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 12 Floor plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 13 Floor plan_11zon.pdf15 Mar 2023
Building plan approvalFile: 14 Floor plan_11zon.pdf15 Mar 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Urban Skyline Phase IS No 79 Ravet Haveli Pune350OngoingDec 2026Dec 2026

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 32 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Urban Skyline Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near near Le Stone Restaurant13,700+ in Pune

2 kmUrban Skyline Phase IICompleted 96Lapsed / revoked 53Other 124Dot size: filed unitsN

Filed coordinates, straight-line distance. 273 registered projects within 2 km.

Builder: M/s Urban Space Creators

M/s Urban Space Creators has 1 registration on MahaRERA, including Urban Skyline Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Urban Skyline Phase II is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Urban Skyline Phase II?

The registered promoter entity is M/s Urban Space Creators, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Urban Skyline Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Urban Skyline Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Urban Skyline Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Urban Skyline Phase II?

The professionals named in the filing: Architect: Sakaar Architects and Planners; Engineer: Swapnil G Pawar; Engineer: Prafulla Kale; Engineer: Digvijay Digambar Kokate; Chartered Accountant: Ms S C Bathiya Co; Chartered Accountant: Doshi Jethale & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Urban Skyline Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Urban Skyline Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Urban Skyline Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.