Urban Hills Phase 1

By Lotus Group

RG-MH-17959 · RERA P51700056256 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 33.10 crore secured on the land, in favour of Aditya Birla Capital Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
297 of 378Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

Urban Hills Phase 1 is a Others project by Lotus Group in Thane, Maharashtra, registered with MahaRERA as P51700056256 on 22 May 2024. Possession is promised by 1 Apr 2028. 81 of the 378 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameUrban Hills Phase 1
  • TypeOthers
  • Location
    • Opp Bhomi Lawns
    • Nr Maruti Showroom
    • Kalyan Phata
    • Thane
    • Thane (M Corp.)
    • Thane
    • 421204
  • Pincode421204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700056256
  • ReraGenie IDRG-MH-17959

Builder

  • NameLotus Group
  • Entity typePartnership
  • PartnersRasila Mahendra Patel, Mahendra Bhanji Patel, Shardaben Vinod Patel, Vinod Kanjibhai Patel, Bhavna Anilkumar Patel, Anilkumar Karshan Patel

Key dates

this monthRegisteredMay 2024PromisedApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion1 Apr 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed77 files

Current status

21%81 of 378 units booked
33.3%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA2121217119336
Building BNA12642042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

Building A50%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed380

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots380
Closed/Covered380
BuildingClosed/CoveredTotal
Building A8080
Building B300300

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,832 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Ltd
Secured amountRs 33.10 crore
CERSAI search filedYes
Declared on27 Feb 2026
LandownerVillageDistrict
Shaukatali Abdul Khudus ChoudhariPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI43781.28
Proposed, not sanctioned23,860 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAxis Bank Section 12, Kharghar, Navi Mumbai - 410210
Estimated costRs 48.50 cr
Cost incurredRs 16.17 cr
Work done33.34%
BuildingWingEstimatedIncurred
Building ANARs 19.25 crRs 8.09 cr
Building BNARs 19.25 crRs 8.09 cr
-NARs 10.00 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVinay Patil & Associates
EngineerS V Patel & Associates
Chartered AccountantLK Dedhia & Co
PartnerRole in project
Lotus Group-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Apr 2028

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf11 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf11 Jun 2026
Withdrawal Update Form 3File: Form 3_compressed.pdf11 Jun 2026
Form 1File: Form 1 Architect Certificate Q2.pdf25 Feb 2026
Form 2File: Form 2 Engineering Certificate Q2.pdf25 Feb 2026
Form 3File: Form 3 CA Certificate Q2.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Promoters Disclosure of Sold Booked Inventory Q2.pdf25 Feb 2026
Form 1File: Form 1 Architect Certificate Q3.pdf25 Feb 2026
Form 2File: Form 2 Engineering Certificate Q3.pdf25 Feb 2026
Form 3File: Form 3 CA Certificate Q3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Promoters Disclosure of Sold Booked Inventory Q3.pdf25 Feb 2026
Form 1File: Form 1 Architect Certificate .pdf18 Aug 2025
Form 2File: Form 2 Engineering Certificate.pdf18 Aug 2025
Form 3File: Form 3 CA Certificate _compressed.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Promoter's Disclosure of Sold Booked Inventory (1).pdf18 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Architect Certificate .pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA Certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineering Certificate .pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory_compressed.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Architect Certificate_compressed.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineering Certificate_compressed.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory _compressed.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Rera (1).pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Architect Certificate_organized.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA Certificate.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineering Certificate.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Ceritficate (Q1) FY 24-25.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineering Certificate (Q1) FY 24-25.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration - No Withdrawal from Designated Bank Account.pdf23 Jul 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf15 May 2024
Layout approvalFile: PLOT AREA SHOWN IN APPROVED PLAN_compressed.pdf7 May 2024
Layout approvalFile: PLOT AREA UNDER BUILDING.pdf7 May 2024
Copy of Layout Approval (in case of layout)File: PLOT AREA SHOWN IN APPROVED PLAN_compressed.pdf7 May 2024
Copy of Layout Approval (in case of layout)File: PLOT AREA UNDER BUILDING.pdf7 May 2024
Other - TechnicalFile: Declaration of Plot Area.pdf2 May 2024
Other - TechnicalFile: Order no 50 to 2024.pdf2 May 2024
Other - TechnicalFile: Verification of CC.pdf2 May 2024
Building plan approvalFile: Sanction Plans 12-1_compressed.pdf11 Apr 2024
Building plan approvalFile: Sanction Plans 12-2_compressed.pdf11 Apr 2024
Building plan approvalFile: Sanction Plans 12-3_compressed.pdf11 Apr 2024
Building plan approvalFile: Sanction Plans 12-4_compressed.pdf11 Apr 2024
Building plan approvalFile: Sanction Plans 12-5_compressed.pdf11 Apr 2024
Building plan approvalFile: Sanction Plans 12-6_compressed.pdf11 Apr 2024
Building plan approvalFile: Sanction Plans 12-7_compressed.pdf11 Apr 2024
Building plan approvalFile: Sanction Plans 12-8_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 12-1_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 12-2_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 12-3_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 12-4_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 12-5_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 12-6_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 12-7_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 12-8_compressed.pdf11 Apr 2024
Proforma of Agreement for saleFile: Draft of Agreement for Sale.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_compressed.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate_compressed.pdf10 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Anilkumar Karshanbhai Patel.pdf10 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Bhavnaben Anilkumar Patel.pdf10 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Rasila Mahendra Patel.pdf10 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Mahendra Bhanjibhai Patel.pdf10 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Vinod Patel.pdf10 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Shardaben Vinod Patel.pdf10 Apr 2024
Proforma of Allotment letterFile: Allotment.pdf8 Apr 2024
Deviation Report with respect to Allotment letterFile: No Deviation Report for Allotment letter.pdf8 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report for Agreement for sale.pdf8 Apr 2024
Copy of the legal title reportFile: Legal Title Report.pdf22 Mar 2024
Copy of the legal title reportFile: Search Report.pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Finance.pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Legal.pdf22 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrances Finance.pdf22 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrances Legal.pdf22 Mar 2024
Declaration in FORM BFile: Form-B Promoters.pdf22 Mar 2024
CERSAI detailsFile: Declaration Cersai.pdf22 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Separate Bank.pdf22 Mar 2024
PAN CardFile: pan card Lotus.pdf15 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf15 Mar 2024

How this compares with Thane

21%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Urban Hills Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan Phata, Thane7,600+ in Thane

2 kmUrban Hills Phase 1Completed 42Lapsed / revoked 14Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: Lotus Group

Lotus Group has 1 registration on MahaRERA, including Urban Hills Phase 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Urban Hills Phase 1 is delayed beyond 1 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Urban Hills Phase 1?

The registered promoter entity is Lotus Group, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Urban Hills Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Urban Hills Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Urban Hills Phase 1?

The professionals named in the filing: Architect: Vinay Patil & Associates; Engineer: S V Patel & Associates; Chartered Accountant: LK Dedhia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Urban Hills Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Urban Hills Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Urban Hills Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.