ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / UNIQUE SERENITY

Registered No litigation declared Residential / Group Housing project

UNIQUE SERENITY

By UCT VENTURES LLP

RG-MH-06918 · RERA P51900054340 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
19 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

UNIQUE SERENITY is a Residential / Group Housing project by UCT VENTURES LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900054340 on 15 Jan 2024. Possession is promised by 31 Dec 2026. 11 of the 30 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameUNIQUE SERENITY
  • TypeResidential / Group Housing
  • Location
    • MADHUKAR B RAUT
    • SHIVAJI PARK
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900054340
  • ReraGenie IDRG-MH-06918

Builder

  • NameUCT VENTURES LLP
  • Entity typeOthers
  • Designated PartnerRAJESH BALRAJ MURKAR MURKAR
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

37%11 of 30 units booked
98.6%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ISHA PRASADNA211530030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ISHA PRASAD: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area468 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2025
LandownerVillageDistrict
UCT VENTURES LLP-Mumbai City
ANKIT PANKAJ PAREKH-Mumbai City
BINOY PANKAJ PAREKHMumbai CityMumbai City
MALVIKA PANKAJ PAREKH-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2582.39
Proposed, not sanctioned1,546 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAMLA MILLS, LOWER PAREL MUMBAI
Estimated costRs 16.65 cr
Cost incurredRs 16.41 cr
Work done98.56%
BuildingWingEstimatedIncurred
ISHA PRASADNARs 15.80 crRs 15.56 cr
-NARs 85.00 lakhRs 85.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectP N Bhobe & Associates
EngineerK C SHAH CONSULTANTS KAIVANT C SHAH
Chartered AccountantPGS & Associates
PartnerRole in project
UCT VENTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 March 26.pdf20 Apr 2026
Withdrawal Update Form 3File: RERA FORM 3.pdf20 Apr 2026
Withdrawal Update Form 1File: RERA form 1.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 March 26.pdf17 Apr 2026
Withdrawal Update Form 3File: RERA Form-3.pdf17 Apr 2026
Form 5 (FY 2025-2026)File: RERA FORM 5.pdf17 Apr 2026
Withdrawal Update Form 1File: RERA FORM 1.pdf19 Jan 2026
Withdrawal Update Form 2File: Form-2 Dec 25 Qtr.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf19 Jan 2026
Withdrawal Update Form 1File: RERA_FORM 1 SEP 25.pdf4 Dec 2025
Withdrawal Update Form 2File: Form2_Oct-26_QTR.pdf4 Dec 2025
Withdrawal Update Form 3File: RERA_Form 3_compressed.pdf4 Dec 2025
Form 1File: UCT VENTURES LLP RERA CERTIFICATE_ P N BHOBE_030425.pdf30 Oct 2025
Form 2File: UCT VENTURES RERA CERTIFICATE _KC SHAH_140425.pdf30 Oct 2025
Form 3File: UCT VENTURES LLP_Form 3.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory_Signed.pdf30 Oct 2025
Form 1File: FORM 1_Dec24.pdf30 Oct 2025
Form 2File: FORM 2_Dec24.pdf30 Oct 2025
Form 3File: Form 3 UCT Venture 31st Dec 2024_0001.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory_Signed.pdf30 Oct 2025
Form 1File: SEP MONTH_Form 1_UCT VENTURES LLP_RERA CERTIFICATE.pdf30 Oct 2025
Form 2File: SEP MONTH_Form 2_UCT VENTURES LLP_RERA CERTIFICATE_0001.pdf30 Oct 2025
Form 3File: Form 3 UCT Venture 30th Sept 2024_0001.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory_Signed.pdf30 Oct 2025
Form 1File: Form 1.pdf30 Oct 2025
Form 2File: Form 2 June 24.pdf30 Oct 2025
Form 3File: Form 3_June 24.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf30 Oct 2025
Form 1File: 03 RERA FORM 1.pdf30 Oct 2025
Form 2File: FORM 2_Isha Prasad_Unique Serenity.pdf30 Oct 2025
Form 3File: UCT VENTURES LLP_FORM-3.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory_signed.pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1 UCT Ventures_June-25 Qtr.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2 UCT Ventures_June-25QTR.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 UCT Ventures June_compressed.pdf30 Oct 2025
Form 5 (FY 2023-2024)File: Form-5_2024.pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1 UCT Ventures_June-25 Qtr.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 UCT Ventures_June-25QTR.pdf29 Oct 2025
Withdrawal Update Form 3File: Form 3 UCT Ventures June_compressed.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: Form - 5_2025 for UCT Venture.pdf29 Oct 2025
Withdrawal Update Form 1File: form 1 _Mar25.pdf22 May 2025
Withdrawal Update Form 2File: K C SHAH CONSULTANTS_FORM 2_Mar25.pdf22 May 2025
Withdrawal Update Form 3File: Form 3 UCT Venture 31st March 2025_0001.pdf22 May 2025
Layout approvalFile: APPROVED FURTHER CC UPTO 20TH PART.pdf24 Jan 2025
Layout approvalFile: AMEDNMENT APPROVAL LETTER.pdf24 Jan 2025
Building plan approvalFile: AMENDMENT APPROVED DRAWING Page 1 to 3.pdf24 Jan 2025
Building plan approvalFile: AMENDMENT APPROVED DRAWING Page 4 to 5.pdf24 Jan 2025
Copy of Layout Approval (in case of layout)File: APPROVED FURTHER CC UPTO 20TH PART.pdf24 Jan 2025
Copy of Layout Approval (in case of layout)File: AMEDNMENT APPROVAL LETTER.pdf24 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: AMENDMENT APPROVED DRAWING Page 1 to 3.pdf24 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: AMENDMENT APPROVED DRAWING Page 4 to 5.pdf24 Jan 2025
Declaration about Commencement CertificateFile: APPROVED FURTHER CC UPTO 20TH PART.pdf24 Jan 2025
Building plan approvalFile: AMENDED APPROVAL LETTER.pdf13 Nov 2024
Building plan approvalFile: AMENDMENT APPROVAL DRAWING UPLOADING.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UCT VENTURES LLP_FORM-3.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: AMENDED APPROVAL LETTER.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: AMENDMENT APPROVAL DRAWING UPLOADING.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form3.pdf5 Jan 2024
Details of encumbrances concerned to FinanceFile: NoEncumbrance declaration_UCT.pdf3 Jan 2024
Details of encumbrances concerned to LegalFile: NoEncumbrance declaration_UCT.pdf3 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report from Draft Model Agreement for sale.pdf30 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf11 Dec 2023
Copy of the legal title reportFile: 231201 ISHA PRASAD_TITLE CERTIFICATE.pdf2 Dec 2023
Copy of the legal title reportFile: 231202 ISHA PRASAD_TITLE REPORT_FORMAT-A.pdf2 Dec 2023
Proforma of Allotment letterFile: Corrected Allotment Letter.pdf2 Dec 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance certificate.pdf30 Nov 2023
Details of encumbrances concerned to LegalFile: No Encumbrance certificate.pdf30 Nov 2023
CERSAI detailsFile: CERSAI Declaration.pdf30 Nov 2023
Declaration in FORM BFile: Form B_Rajesh Murkar.pdf10 Nov 2023
Declaration in FORM BFile: Form B_Swapnil Naik.pdf10 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Interest Rajesh Murkar.pdf7 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Interest Swapnil Naik.pdf7 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Bank Declaration.pdf7 Nov 2023
Deviation Report with respect to Allotment letterFile: Declaration for No Deviation with Allotment Letter.pdf7 Nov 2023
Layout approvalFile: 2110755_IOD_signed.pdf6 Nov 2023
Copy of Layout Approval (in case of layout)File: 2110755_IOD_signed.pdf6 Nov 2023
Proforma of Agreement for saleFile: Proforrma Sale Agreement.pdf1 Nov 2023
Declaration about Commencement CertificateFile: Underaking CC FOrm D.pdf28 Oct 2023
Building plan approvalFile: UCT Plan_2023.pdf18 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
UNIQUE EXOTICAP51900032868DADAR HINDUCOLONY, Mumbai CityFeb 2022CompletedDec 2024May 2024

How this compares with Mumbai City

37%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UNIQUE SERENITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAJI PARK780+ in Mumbai City

2 kmUNIQUE SERENITYCompleted 85Lapsed / revoked 70Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 252 registered projects within 2 km.

Builder: UCT VENTURES LLP

UCT VENTURES LLP has 1 registration on MahaRERA, including UNIQUE SERENITY. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if UNIQUE SERENITY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UNIQUE SERENITY?

The registered promoter entity is UCT VENTURES LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UNIQUE SERENITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UNIQUE SERENITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UNIQUE SERENITY?

The professionals named in the filing: Architect: P N Bhobe & Associates; Engineer: K C SHAH CONSULTANTS KAIVANT C SHAH; Chartered Accountant: PGS & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UNIQUE SERENITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UNIQUE SERENITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UNIQUE SERENITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.