Home / Browse projects / Mumbai City, Maharashtra / Kohinoor Square Phase 1

Registration lapsed Litigation declared Commercial project

Kohinoor Square Phase 1

By Kohinoor CTNL Infrastructure Company Private Limited

RG-MH-25371 · RERA P51900004769 · Last updated on MahaRERA portal: 5 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Litigation declared, 7 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
16 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 99%
0 of 199Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

Kohinoor Square Phase 1 is a Commercial project by Kohinoor CTNL Infrastructure Company Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900004769 on 9 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing. 199 of the 199 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKohinoor Square Phase 1
  • TypeCommercial
  • Location
    • N.C. Kelkar Road
    • Shivaji Park
    • Dadar (west)
    • Dadar West
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900004769
  • ReraGenie IDRG-MH-25371

Builder

  • NameKohinoor CTNL Infrastructure Company Private Limited
  • Entity typeCompany
  • Company SecretorySheetal Ganesh Naik
  • DirectorSandeep Shikre
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseDec 2022Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2022)
  • Buildings2 building records
  • Documents filed116 files

Current status

100%199 of 199 units booked
77.2%Work done, per cost certificate

Figures as on 5 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A Comprising of Offices, IT, ITES, Shops and PPL in BasementNA11901818
Wing B Comprising of Offices, IT, ITES, Hotel,Shops and PPL in BasementNA53530181181

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 99%.

Wing A Comprising of Offices, IT, ITES, Shops and PPL in Basement100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%
Wing B Comprising of Offices, IT, ITES, Hotel,Shops and PPL in Basement100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Progress on shared amenities15

As on 5 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed588

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots588
Closed/Covered588
BuildingClosed/CoveredTotal
Wing A Comprising of Offices, IT, ITES, Shops and PPL in Basement152152
Wing B Comprising of Offices, IT, ITES, Hotel,Shops and PPL in Basement436436

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,718 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Dec 2025

Approvals and building plan

Permissible FSI68483.04
Proposed, not sanctioned58,483 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Shop No 2 3 Priyadarshini Mahila Co op Society Bhavani Shankar Road Dadar West Mumbai
Estimated costRs 966.96 cr
Cost incurredRs 746.71 cr
Work done77.22%
BuildingWingEstimatedIncurred
Wing B Comprising of Offices, IT, ITES, Hotel,Shops and PPL in BasementNARs 841.85 crRs 660.08 cr
Wing A Comprising of Offices, IT, ITES, Shops and PPL in BasementNARs 109.51 crRs 82.00 cr
-NARs 15.60 crRs 4.63 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shikre & Associates
EngineerNilesh Kumthekar
EngineerSterling Engineering Consultancy Services PVt. Ltd.
Chartered AccountantMukund M Chitate & Co
Chartered AccountantV P Agrawal & Co.
PartnerRole in project
Kohinoor CTNL Infrastructure Company Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900013029Dec 2022 → Sep 2023

Reason as filed by the promoter(1) While developing the Project Kohinoor Square Phase 1 consist of Wing A, Wing B and Basement (“said Project”), the Corporate Insolvency Resolution Process (CIRP) was initiated by the secured creditors against the Promoter before the National Company Law Tribunal, Mumbai Bench (NCLT); (2) The NCLT by its Order dated 21/02/2018 approved the resolution plan in respect of the Promoter and the said Project was restarted. In view of the said CIRP process, the said Project was delayed, however, the Promoter completed construction of the buildings before Project completion date; (3) The Promoter wa

EXT51900025428Dec 2022 → Dec 2025

Reason as filed by the promoterFull occupation certificate for 3 basements, A- Wing and C - Wing and full occupation certificate upto 47th floor and part 48th floor is obtained for Wing B. The possession of all the units/ flats is already handed over to the respective purchasers. The 48th floor is purchased by Kohinoor Elite Hotels Pvt. Ltd. and the possession of part 48th floor for which occupation certificate is obtained is handed over to Kohinoor Elite Hotels Pvt. Ltd. The construction of the balance part of 48th floor only is under progress as per the requirements of the purchaser and approval of the competent authoriti

Litigation declared7

CaseCourtStatus
1027/2017National Company Law Tribunal MumbaiResolution Plan Approved
649/2017Mumbai Debt Recovery Tribunal No IIPending for filing consent terms
134/2018National Company Law Appellate Tribunal DelhiAppeal withdrawn
43/2018High Court MumbaiPetition Withdrawn
3373/2018Supreme Court DelhiPending for Hearing
1236/2017Supreme Court DelhiPending for Hearing
157/2018National Company Law Appellate Tribunal DelhiAppeal Withdrawn

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000012400Yashyog Infrastructure and Dev. Pvt. Ltd. through Directors Yashwant N. Manjarekar and otherKohinoor CTNL Infrastructure Co. Pvt. Ltd.13/12/2017

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 May 2023

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 (01-10-2025 to 31-12-2025).pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2 (01-10-2025 to 31-12-2025).pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 (01-10-2025 to 31-12-2025).pdf5 Feb 2026
Withdrawal Update Form 1File: Form-1.pdf19 Dec 2025
Withdrawal Update Form 1File: Form-1 (01-04-2025 to 30-06-2025).pdf19 Dec 2025
Withdrawal Update Form 1File: Form-1 (01-07-2025 to 30-09-2025).pdf19 Dec 2025
Withdrawal Update Form 2File: Form-2.pdf19 Dec 2025
Withdrawal Update Form 2File: Form 2 (01-04-2025 to 30-06-2025).pdf19 Dec 2025
Withdrawal Update Form 2File: Form 2 (01-07-2025 to 30-09-2025).pdf19 Dec 2025
Withdrawal Update Form 3File: Rera Phase-1- (01-01-25 to 31-03-25).pdf19 Dec 2025
Withdrawal Update Form 3File: Rera Certificate-Phase-1- (01-04-25 to 30-06-25).pdf19 Dec 2025
Withdrawal Update Form 3File: Rera Certificate-Phase-1- (01-07-25 to 30-09-25).pdf19 Dec 2025
Form 3File: Rera Phase-1- (01-01-25 to 31-03-25).pdf18 Dec 2025
Form 2File: Form-2.pdf18 Dec 2025
Form 1File: Form-1.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Booked Inventory.pdf18 Dec 2025
Form 2A (FY 2024-2025)File: Form-2A.pdf17 Dec 2025
Form 5 (FY 2024-2025)File: Form-5.pdf16 Dec 2025
Declaration in FORM BFile: Form B - Affidavit.pdf19 Dec 2024
Declaration in FORM BFile: Form B - Affidavit.pdf19 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf19 Dec 2024
Certificates of CA (Form 5)File: Form-5.pdf19 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf19 Dec 2024
OtherFile: KCTNL -Submission letter New.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf19 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (April-23 to June-23).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (Jan-24 to March-24).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (Oct-23 to Dec-23).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (July-23 to Sept-23).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (Jan-23 to March-23).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (Oct-22 to Dec-22).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (July-22 to Sept-22).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (April-22 to June-22).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (Jan-22 to Mar-22).pdf3 Dec 2024
Certificates of CA (Form 3)File: Kohinoor Square- Phase-1 (April-18 to Dec-21).pdf3 Dec 2024
OtherFile: 26 Jun 2024 IT Approval.pdf10 Jul 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certificate.pdf2 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engineer's Certificate for RERA-KSP-Phase 1 (Oct 2022-Dec 2022)_1.pdf26 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engineer's Certificate for RERA-KSP-Phase 1 (Jan 2023-Mar 2023)_2.pdf26 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf11 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engineers Certificate_PH I.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate_PH I.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate_PH I.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate_PH I.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate_PH I.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_PH I.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_PH I.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_PH I.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Engineers Certificate_PH I.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Engineers Certificate.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineers Certificate_PH I.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SSA-21-22-077.pdf12 Oct 2022
OtherFile: 26 Apr 2022 OC signed.pdf18 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20210930 KSP Wing A B Form 1 Architect certificate Phase 1.pdf3 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20210930 KSP Wing A B Form 2 Engineer certificate Phase 1.pdf3 May 2022
Certificates of CA (Form 3)File: 20210930 KSP Wing A B Form 3 CA Certificate Phase 1.pdf3 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2022426 OC signed.pdf3 May 2022
OtherFile: Part OC signed.pdf7 Feb 2022
Copy of the legal title reportFile: Title Certificate 2021.pdf26 Nov 2021
OtherFile: 2021308 Part OC.pdf13 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20210630 Form 1 Architect certificate for Phase 1 Wing A B.pdf9 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20210630 Form 2 Engineer certificate Phase 1 Wing A B.pdf9 Sep 2021
Certificates of CA (Form 3)File: 20210630 Form 3 CA Certificate Phase 1 Wing A B.pdf9 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20210331 FORM 1 Architect certificate for Phase 1 Wing A B.pdf1 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20210331 FORM 2 Engineer certificate for Phase 1 Wing A B.pdf1 Sep 2021
Certificates of CA (Form 3)File: 20210331 FORM 3 CA certificate for Phase 1 Wing A B.pdf1 Sep 2021
OtherFile: Part OC Wing A Ground 3 to 5 floors.pdf1 Sep 2021
Certificates of CA (Form 3)File: 20201231 Form3 Kohinoor Phase1 Wing A B.pdf22 Jun 2021
OtherFile: 2021525 RERA Phase 1 Inventory.pdf28 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2020114 OC signed.pdf5 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20190627 OC signed.pdf5 May 2021
OtherFile: 2020109 amended signed letter.pdf5 May 2021
Certificates of CA (Form 3)File: 2020 09 30 KSP Form 3 Wing A B CA Certificate Phase 1.pdf26 Feb 2021
Certificates of CA (Form 5)File: Kohinoor CTNL Form 5 Phase 1.pdf22 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20200630 KSP Wing A B Form 1 Architect certificate Phase 1-compressed.pdf21 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20200630 KSP Wing A B Form 2 Engineer certificate Phase 1-compressed.pdf21 Dec 2020
Certificates of CA (Form 3)File: 20200630 KSP Wing A B Form 3 CA Certificate Phase-1-compressed.pdf21 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20200331KSP Wing A B Form 1 Architect certificate Phase 1.pdf7 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20200331KSP Wing A B Form 2 Engineers Certificate Phase 1.pdf7 Nov 2020

How this compares with Mumbai City

100%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 36 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kohinoor Square Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dadar West780+ in Mumbai City

2 kmKohinoor Square Phase 1Completed 87Lapsed / revoked 70Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 260 registered projects within 2 km.

Builder: Kohinoor CTNL Infrastructure Company Private Limited

Kohinoor CTNL Infrastructure Company Private Limited has 2 registrations on MahaRERA, including Kohinoor Square Phase 1 and Kohinoor Square Phase 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that Kohinoor Square Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Kohinoor Square Phase 1 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kohinoor Square Phase 1?

The registered promoter entity is Kohinoor CTNL Infrastructure Company Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kohinoor Square Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kohinoor Square Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kohinoor Square Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kohinoor Square Phase 1?

The professionals named in the filing: Architect: Sandeep Shikre & Associates; Engineer: Nilesh Kumthekar; Engineer: Sterling Engineering Consultancy Services PVt. Ltd.; Chartered Accountant: Mukund M Chitate & Co; Chartered Accountant: V P Agrawal & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kohinoor Square Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kohinoor Square Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kohinoor Square Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.