UJWAL SACHI

By NATU DHAMALE CONSTRUCTION

RG-MH-69129 · RERA P52100052662 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 80%
40 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

UJWAL SACHI is a Others project by NATU DHAMALE CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100052662 on 15 Sep 2023. Possession is promised by 31 Dec 2028. 20 of the 60 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameUJWAL SACHI
  • TypeOthers
  • Location
    • -
    • SUTARWADI
    • Pashan
    • Haveli
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052662
  • ReraGenie IDRG-MH-69129

Builder

  • NameNATU DHAMALE CONSTRUCTION
  • Entity typePartnership
  • PartnerBhushan Bhagwant Adhav

Key dates

this monthRegisteredSep 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Sep 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Current status

33%20 of 60 units booked
70.2%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UJWAL SACHI A WINGNA6652860

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

UJWAL SACHI A WING: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes30%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Closed/Covered1
Open Space48

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI4986.0
Proposed, not sanctioned2,300 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANAND NAGAR SINHGAD ROAD PUNE
Estimated costRs 14.64 cr
Cost incurredRs 10.28 cr
Work done70.19%
BuildingWingEstimatedIncurred
UJWAL SACHI A WINGNARs 14.64 crRs 10.28 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHELTER DESIGNERS
EngineerSOMESHWAR PAWAR
EngineerVaibhav Tabaji Ohol
Chartered AccountantA M SADAVARTE & CO
PartnerRole in project
NATU DHAMALE CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf25 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf21 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf21 Jan 2026
Withdrawal Update Form 2File: form 2 ujwal sachi.pdf21 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf21 Jan 2026
Withdrawal Update Form 1File: form 1 010725 .pdf25 Oct 2025
Withdrawal Update Form 2File: form 2 ujwal sachi.pdf25 Oct 2025
Withdrawal Update Form 3File: Natu Form 3.pdf25 Oct 2025
Layout approvalFile: Revised Layout Plan 1.pdf15 Oct 2025
Layout approvalFile: Revised Layout Plan 2.pdf15 Oct 2025
Layout approvalFile: Revised Layout Plan 3.pdf15 Oct 2025
Layout approvalFile: Revised Layout Plan 4.pdf15 Oct 2025
Withdrawal Update Form 1File: form 1 010725 .pdf16 Sep 2025
Withdrawal Update Form 1File: form 1 010725 .pdf16 Sep 2025
Withdrawal Update Form 2File: form 2 ujwal sachi 31 12 23.pdf16 Sep 2025
Withdrawal Update Form 2File: form 2 ujwal sachi.pdf16 Sep 2025
Withdrawal Update Form 3File: form 3 ujwal sachi.pdf16 Sep 2025
Withdrawal Update Form 3File: form 3 ujwal sachi.pdf16 Sep 2025
Withdrawal Update Form 1File: form 1 010725 .pdf19 Jul 2025
Withdrawal Update Form 2File: form 2 ujwal sachi 31 12 23.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3 natu 31 12 23.pdf19 Jul 2025
Form 1File: Natu- form 1 31 3 25.pdf30 May 2025
Form 2File: Natu Form 2 31 3 25.pdf30 May 2025
Form 3File: natu form 3 31 3 25 with stamp.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Natu sold-unsold inventory 31 3 25.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner Feb 6, 2025 11-03 AM ujjwal sachi.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner Feb 3 2025 3-28 PM_compressed.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Natu 23-24.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Natu Form 1 31032024.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Natu Form 1 30062024.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Natu Form 1 30092024.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NATU FORM 3 310324.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NATU FORM 3 300624.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NATU FORM 3 300924.pdf29 Nov 2024
Layout approvalFile: ujwal sachi PLAN 1.pdf18 Nov 2024
Building plan approvalFile: ujwal sachi PLAN 2.pdf18 Nov 2024
Copy of Layout Approval (in case of layout)File: ujwal sachi PLAN 1.pdf18 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Ujwal Sachi cc 2381 30 10 2024.pdf18 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: ujwal sachi PLAN 2.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inv ujwal sachi 30 06 2024.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inv ujwal sachi 30 09 2024.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31 03 24 NATU.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30 09 24 NATU.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30 06 24 NATU.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 31 03 24 NATU.pdf17 Oct 2024
Layout approvalFile: Natu Ujwal Sachi Revised Layout 04072024.pdf5 Jul 2024
Building plan approvalFile: Natu Ujwal Sachi 3rd floor plan 04072024.pdf5 Jul 2024
Copy of Layout Approval (in case of layout)File: Natu Ujwal Sachi Revised Layout 04072024.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Natu Ujwal Sachi 3rd floor plan 04072024.pdf5 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Natu Ujwal Sachi Revised CC 0864 04072024.pdf5 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ujwal sachi 31 12 23.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 ujwal sachi 31 12 23.pdf26 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 natu 31 12 23.pdf26 Jun 2024
Disclosure of sold/ booked inventoryFile: Natu sold unsold inventory 311223.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: Natu sold unsold inventory 311223.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: Natu sold unsold inventory 310324.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: Natu sold unsold inventory 300424.pdf4 May 2024
Building plan approvalFile: Natu Ujwal Sachi 2nd floor plan 23042024.pdf30 Apr 2024
Layout approvalFile: Natu Ujwal Sachi Revised Layout 23042024.pdf30 Apr 2024
Copy of Layout Approval (in case of layout)File: Natu Ujwal Sachi Revised Layout 23042024.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Natu Ujwal Sachi 2nd floor plan 23042024.pdf30 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Natu Ujwal Sachi Revised CC 0260 23042024.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Documents.pdf4 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: SKM_36723082117060.pdf22 Aug 2023
Declaration about Commencement CertificateFile: Revised CC declaration- Ujwal Sachi.pdf22 Aug 2023
Other - TechnicalFile: scan 6.pdf22 Aug 2023
Other - TechnicalFile: scan 7.pdf22 Aug 2023
Other - TechnicalFile: Intimation for Plinth Completion.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UDD_UDCPR for Plinth Certificate.pdf17 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- natu.pdf14 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Plinth Certificate-natu.pdf14 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-natu.pdf14 Jun 2023
CERSAI detailsFile: natu Cersai Report.pdf18 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MS NATU DHAMALE CONSTRUCTIONS - interest in other organisation.pdf6 Jan 2023

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UJWAL SACHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SUTARWADI13,700+ in Pune

2 kmUJWAL SACHICompleted 114Lapsed / revoked 41Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 295 registered projects within 2 km.

Builder: NATU DHAMALE CONSTRUCTION

NATU DHAMALE CONSTRUCTION has 1 registration on MahaRERA, including UJWAL SACHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if UJWAL SACHI is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UJWAL SACHI?

The registered promoter entity is NATU DHAMALE CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UJWAL SACHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UJWAL SACHI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UJWAL SACHI?

The professionals named in the filing: Architect: SHELTER DESIGNERS; Engineer: SOMESHWAR PAWAR; Engineer: Vaibhav Tabaji Ohol; Chartered Accountant: A M SADAVARTE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UJWAL SACHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UJWAL SACHI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UJWAL SACHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.