ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / TW Gardens

Registered No litigation declared Residential / Group Housing project

TW Gardens

By Vasudev C. Wadhwa Construction

RG-MH-21816 · RERA P51800024368 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
13 of 427Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

TW Gardens is a Residential / Group Housing project by Vasudev C. Wadhwa Construction in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024368 on 7 Feb 2020. Possession is promised by 30 Dec 2027. 414 of the 427 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameTW Gardens
  • TypeResidential / Group Housing
  • Location
    • GOKUL TOWERS ROAD
    • Kandivali East
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800024368
  • ReraGenie IDRG-MH-21816

Builder

  • NameVasudev C. Wadhwa Construction
  • Entity typePartnership
  • PartnersNavin Amarlal Makhija, Vijay Vasudev Wadhwa, Ritu Wadhwa, Vinita Wadhwa
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2020PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2020
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed110 files

Current status

97%414 of 427 units booked
94.9%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA38302390239
Wing BNA38301871188

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Wing A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed459

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots459
Closed/Covered459
BuildingClosed/CoveredTotal
Wing A263263
Wing B196196

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,319 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jun 2025
LandownerVillageDistrict
Virendra Shyamnarayan SignhAndheriMumbai Suburban
Rajkumar Shyamnarayan SinghBorivaliMumbai Suburban
Jitendra Ramnarayan SinghBorivaliMumbai Suburban
Thakurramesh Ramanarayan SinghBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI11250.0
Proposed, not sanctioned11,250 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchground floor Unit No 001A Hallmark collectors office Bandra E Mumbai 400051
Estimated costRs 313.59 cr
Cost incurredRs 297.51 cr
Work done94.87%
BuildingWingEstimatedIncurred
Wing BNARs 151.33 crRs 143.76 cr
Wing ANARs 146.59 crRs 140.82 cr
-NARs 15.68 crRs 12.94 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHA Mehta Architects Ketan Mehta
ArchitectKetan H Mehta
EngineerIRA Structural Consultants
EngineerKaustubh S Khadse
Chartered AccountantGMJ & Co
Chartered AccountantMRP Associates
Chartered AccountantArun P. Vaz & Co.
Chartered AccountantR M A & CO LLP
Chartered AccountantS.M.BHAT & ASSOCIATES
PartnerRole in project
Vasudev C. Wadhwa Construction-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000194909RAJA KIRAN PUSHTHAKALAWASUDEV C. WADHWA CONSTRUCTION21/11/2020
CC12400075ajit KUMAR thakurVasudev C. Wadhwa Construction11/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Aug 2024

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3- Tw_260414_150939.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3- Tw_260414_150939.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3- Tw_260414_150939.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM 1 Rera certificate.pdf28 Jul 2025
Withdrawal Update Form 1File: FORM 1 Rera certificate.pdf28 Jul 2025
Withdrawal Update Form 2File: Engineer_TW Gardens_June 25.pdf28 Jul 2025
Withdrawal Update Form 2File: Engineer_TW Gardens_June 25.pdf28 Jul 2025
Withdrawal Update Form 3File: Final FORM 3 - TW Gardens as on June-25_compressed.pdf28 Jul 2025
Withdrawal Update Form 3File: Final FORM 3 - TW Gardens as on June-25_compressed.pdf28 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 TW Gardens march 25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 TW Gardens_March 25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 TW Gardens_March 25_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TW Gardens_March 25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (6)_compressed_11zon.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: TBAF-Form 5-FY-22-23-Signed.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TBAF-Form 5_SIGNED.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate_TW Gardens_Sept 24 Sign.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TW Gardens.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 TW Gardens.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Form-1_TW Gardens_Sept 24 sign.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 24_compressed.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TW Gardens Form 5 FY 2023-24.pdf15 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Wing B OC dated 050824.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 TW Gardens.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 June 2024 TW Gardens.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 TW Gardens June 24.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 TW gardens March 24_compressed (1).pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form3 TW Gardens March 24.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TW Gardens march 24.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form-1_TW Gardens_March 24.pdf24 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC A and B.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: tw garden form 1-dec23_001.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_TW Garden.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_TW Garden_Sep23 Signed.pdf2 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 TW GARDEN Sep23_merged.pdf2 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TW GARDEN- form 3_001.pdf29 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TW GARDEN FORM 3 sep23_001.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect_TW Gardens-Dec22.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Ceritificate Mar-23.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_TW Garden_Jun23.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer_TWGardens Dec22 Revised.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer_TW Gardens-Mar-23.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_TW Garden_Jun23.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_TW Garden_Sep23.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Signed Merged.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Signed Merged.pdf8 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P51800024368 - TW Gardens.pdf6 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate Jun-22_compressed.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate Sep-22_compressed.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Signed_Engineer_TW Gardens-Jun-22.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Sep22 Signed BW.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Mar22_VCWCand TBAF.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Jun22_VCWCandTBAF.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Sep22_VCWCandTBAF_compressed.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_FY21-22_VCWCandTBAF.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 TW Garden March-22.pdf8 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TW Gardens Form-1 Dec-21_compressed (1).pdf30 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form-1 Mar-22_compressed.pdf30 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wadhwa Form-3 Dec-21TW Gardens.pdf30 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Thakur FORM 3 Dec-21.pdf30 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer_TW Gardens_Sep-21.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_TW Gardens_Dec-21.pdf23 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sep 21 - TW Gardens_compressed.pdf18 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 TW Gardens FY 20-21-compressed.pdf18 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TW Gardens Final - June 2021_compressed.pdf13 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer-TW Garden Jun-21.pdf9 Nov 2021
Declaration about Commencement CertificateFile: Form 1 TW garden compressed.pdf29 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 TW garden compressed.pdf29 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -TW Gardens March 2021_compressed.pdf27 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cetificate Sep20 C.pdf5 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TW Gardens - Architect - March 21_compressed.pdf13 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_TW Gardens_March-2021_stamp.pdf13 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality 2A- Form T W Garden mar 21.pdf13 May 2021
Details of encumbrancesFile: New encumberances.pdf3 May 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Dukes HorizonP51800027849Bandra Kurla Complex, Mumbai Suburban125Jan 2021CompletedJun 2026Jun 2023

How this compares with Mumbai Suburban

97%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TW Gardens on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali East6,700+ in Mumbai Suburban

2 kmTW GardensCompleted 17Lapsed / revoked 13Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 69 registered projects within 2 km.

Builder: Vasudev C. Wadhwa Construction

Vasudev C. Wadhwa Construction has 1 registration on MahaRERA, including TW Gardens. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if TW Gardens is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TW Gardens?

The registered promoter entity is Vasudev C. Wadhwa Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TW Gardens?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TW Gardens?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TW Gardens?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TW Gardens?

The professionals named in the filing: Architect: HA Mehta Architects Ketan Mehta; Architect: Ketan H Mehta; Engineer: IRA Structural Consultants; Engineer: Kaustubh S Khadse; Chartered Accountant: GMJ & Co; Chartered Accountant: MRP Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TW Gardens?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TW Gardens. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TW Gardens to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.