TULSI CHAMBERS

By SURANA CONSTRUCTION (CHEMBUR )

RG-MH-19905 · RERA P51800012437 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Litigation declared, 2 cases
  • 14 complaints at MahaRERA
  • Completion date moved by 60 months
  • 3 extensions taken
  • Rs 19.00 crore secured on the land, in favour of Pegasus Trust

Clear

  • Separate project account declared
  • Allotment letter follows the model form

7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
9 of 11Construction stages donefurthest along: Installation of Lifts, 90%
8 of 132Units unsoldnot recorded sold or booked
14Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

TULSI CHAMBERS is a Commercial project by SURANA CONSTRUCTION (CHEMBUR ) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012437 on 1 Sep 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 60 months from the original filing. 124 of the 132 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 14 complaints are on record with the regulator.

At a glance

Project

  • NameTULSI CHAMBERS
  • TypeCommercial
  • Location
    • 3RD ROAD
    • OPP UNION BANK
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012437
  • ReraGenie IDRG-MH-19905

Builder

  • NameSURANA CONSTRUCTION (CHEMBUR )
  • Entity typeOthers
  • Named personsSURANA INFRASTUCTURE PVT LTD, SANDIP VINAYAK PISAT
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

4 months past promisethis monthRegisteredSep 2017First promiseJun 2021Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed97 files

Current status

94%124 of 132 units booked
100.0%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shivaji Nagar SRA Project Phase 1NA17150132132

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

Shivaji Nagar SRA Project Phase 1: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered92
Open Space14

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,017 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofPegasus Trust
Secured amountRs 19.00 crore
CERSAI search filedYes
Declared on28 Jul 2025
LandownerVillageDistrict
Mijit Ventures Pvt LtdMumbai CityMumbai City

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI16068.0
Proposed, not sanctioned16,068 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSwagatam Opp Khar Police Station S V RoadatKhar West Mumbai 400052
Estimated costRs 78.80 cr
Cost incurredRs 78.80 cr
Work done100.0%
BuildingWingEstimatedIncurred
-NARs 43.05 crRs 43.05 cr
Shivaji Nagar SRA Project Phase 1NARs 35.75 crRs 35.75 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGurunath Lala Pangam
ArchitectAakar Architects & Consultants
EngineerM.R. PATIL CONSULTING ENGINEERS PVT LTD.
EngineerRamdatt Shakya
Chartered AccountantAshwin B Shah & Co
Chartered AccountantNEHAL MITUL FARIA
PartnerRole in project
SURANA CONSTRUCTION (CHEMBUR )-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009660Jun 2021 → Jun 2022

Reason as filed by the promoterThe entire India was under the severe impact of outbreak of covid 19 since March 2020 till date and more particularly state of Maharashtra has imposed strict lockdown throughout whenever number of cases were increasing. Even during relaxation period , full relaxation was never granted. The labour required for construction site have migrated to their native since March 2020 and very few of them rejoined the site. The testing requirement of labour force and vaccination compulsion was imposed for construction site but there was lack of availability of vaccine. Owing to this reason and people relu

EXT51800015127Jun 2021 → Sep 2024

Reason as filed by the promoterThe Project got delayed because of litigation with secured financial creditor namely DHFL which has been now taken over by Piramal group under IBC laws. Tthere has been ongoing dispute with Piramal Group before NCLAT & Hon’ble High court Mumbai for allowing additional charge to be created for raising the funds to complete the project. Owing to this litigation, Promoter is unable to raise the require funds from another financial institution.

EXT51800024415Jun 2021 → Jun 2026

Reason as filed by the promoterThere has been delays due to lockdowns, social distancing requirements, and supply chain disruptions. Labor shortages due to illness and travel restrictions also contributed to delays. Increased costs for materials, additional safety measures, and extended project timelines led to budget overruns. Hence we require to extension of Project. Please grant us the extensionas we have a required consent.

Litigation declared2

CaseCourtStatus
226/2014HIGH COURT MUMBAIPENDING
226/2014High Court MumbaiOngoing

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC006000000194041Sandeep OberaiSURANA CONSTRUCTION (CHEMBUR)15/09/2020
CC006000000210145Janvi Makhijani and Narendra MakhijaniM/s Surana Constructions Chembur24/02/2022
CC006000000210149Rahul Makhijani and Manoj J MakhijaniM/s. Surana Constructions (Chembur)24/02/2022
CC006000000056983Deepak BhandariSurana Constructions (Chembur)30/11/2018
CC006000000057168sindhi societyMessers Surana Construction (Chembur)04/12/2018
CC006000000210216Surana Construction (Chembur) Through its Partner Mr. Surendra SuranaSANDEEP OBERAI03/03/2022
CC006000000210217M/S. SURANA CONSTRUCTION (CHEMBUR) THROUGH MR. SURENDRA SURANARAHUL M. MAKHIJANI03/03/2022
CC006000000210219M/S. SURANA CONSTRUCTION (CHEMBUR) THROUGH ITS PARTNER MR. SURENDRA SURANAJANVI N. MAKHIJANI03/03/2022
CC006000000303283Ritika Manoj MakhijaniMs/ Surana Construction14/11/2022
CC006000000303294Jatin K GandhiM/s Surana Construction14/11/2022
CC006000000303293Anil K Nebhnani & OrsM/s Surana Construction14/11/2022
CC006000000303292Vimla A Nebhnani & OrsM/s Surana Construction14/11/2022
CC006000000396972MAYUR RAGHUNATH SHINDE-05/08/2023
CC006000000396973ROHIT RAGHUNATH SHINDE1 Surana Developers 2 OMKAR REALTORS & DEVELOPERS PVT LTD 3 ANATOMY REALTORS PVT LTD 4 SURANA CONSTR05/08/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 31-12-25 PI.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 PI 31-12-25.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 S 25 P1.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 30-09-25 PI.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2 S 25 P1.pdf14 Apr 2026
Withdrawal Update Form 3File: Form 3 S 25 P1.pdf14 Apr 2026
Form 5 (FY 2023-2024)File: Form 5 FY 23-24 PI.pdf13 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 PI.pdf13 Dec 2025
Form 5 (FY 2017-2018)File: Form 5.pdf11 Dec 2025
Form 5 (FY 2018-2019)File: Form 5.pdf11 Dec 2025
Form 5 (FY 2019-2020)File: Form 5 FY 2019-20.pdf11 Dec 2025
Form 5 (FY 2020-2021)File: Form 5 FY 2020-21.pdf11 Dec 2025
Form 5 (FY 2021-2022)File: Form 5 FY 2021-22.pdf11 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 FY 22-23.pdf11 Dec 2025
Form 1File: Form 1 PI.pdf30 Jul 2025
Form 2File: Form 2 P I.pdf30 Jul 2025
Form 3File: Form 3 P I.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold P I.pdf30 Jul 2025
Form 1File: Form 1 P1.pdf30 Jul 2025
Form 2File: Form 2 P1.pdf30 Jul 2025
Form 3File: Form 3 P1.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold P I.pdf30 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2024 P1.pdf6 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2024 PI.pdf6 Feb 2025
Certificates of CA (Form 3)File: Form 3 31-12-2024 PI.pdf6 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-2024 PI.pdf6 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase 1 30-06-2024.pdf6 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 certificate of architect phase 1.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 3 P I 30-06-2024.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 3 Phase I 30-09-2024.pdf6 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 1 30-06-2024.pdf6 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase I.pdf6 Nov 2024
Declaration in FORM BFile: Form B - Promoter-Phase I.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Certificates of Engineer.pdf3 Aug 2024
Details of encumbrances concerned to FinanceFile: Declaration of Financial Encumbrances phase1.pdf25 Jul 2024
Details of encumbrances concerned to LegalFile: Declaration of Financial Encumbrances phase1.pdf25 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: PHASE-I Sold Unsold.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2024 P1.pdf12 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-20204 P1.pdf12 Jul 2024
Certificates of CA (Form 3)File: Form 3 31-03-2024 P1.pdf12 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf19 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM - 2A.pdf17 Oct 2023
Certificates of CA (Form 5)File: Form 5 FY 22-23.pdf17 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 02.pdf13 Oct 2023
Certificates of CA (Form 3)File: Final form 3 31-3-23.pdf13 Oct 2023
Other - TechnicalFile: Project Report July-23 for RERA.pdf3 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 02 mar revised.pdf30 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Mar 23.pdf27 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 01-Mar 23.pdf22 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold unsold mar 23.pdf22 Jun 2023
Other - TechnicalFile: FORM 'B' Affidavit cum Declaration.pdf17 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account Phase 1.pdf5 Apr 2023
Details of encumbrances concerned to FinanceFile: 6.pdf31 Mar 2023
Details of encumbrances concerned to FinanceFile: 7.pdf31 Mar 2023
Details of encumbrances concerned to LegalFile: 6.pdf31 Mar 2023
Details of encumbrances concerned to LegalFile: 7.pdf31 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf13 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf13 Mar 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD LIST.pdf13 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSUR - Sandip Pisat.pdf13 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20.pdf13 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21.pdf13 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf13 Mar 2023
Declaration about Commencement CertificateFile: DECLERATION CERTIFICATE.pdf27 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers certificatre - form-02A.pdf27 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTERST.pdf27 Feb 2023
Proforma of Agreement for saleFile: AFS.pdf14 Jan 2023
Details of encumbrances concerned to FinanceFile: Declaration of no encumbrances - Legal Phase I.pdf23 Dec 2022
Details of encumbrances concerned to LegalFile: Declaration of no encumbrances - Legal Phase I.pdf23 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate project.pdf15 Dec 2022
Deviation Report with respect to Allotment letterFile: No Deviation for Allotment Letter Phase I.pdf15 Dec 2022
Deviation Report with respect to model copy of AgreementFile: No deviation for Agreement for Sale Phase I.pdf15 Dec 2022
CERSAI detailsFile: Cersai.pdf17 May 2022
CERSAI detailsFile: SURANA CERSAI.pdf21 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf20 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: download (2).pdf20 May 2021
Details of encumbrancesFile: Declaration of Encumbrance_1.pdf28 Nov 2020
Details of encumbrancesFile: INDEX 2 INDEX II DHFL.pdf28 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf20 Nov 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
TULSI CHAMBERSCTS 385 CHEMBUR128CompletedDec 2020Late, Jun 2021

How this compares with Mumbai Suburban

94%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 60 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TULSI CHAMBERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP UNION BANK6,700+ in Mumbai Suburban

2 kmTULSI CHAMBERSCompleted 139Lapsed / revoked 110Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 383 registered projects within 2 km.

Builder: SURANA CONSTRUCTION (CHEMBUR )

SURANA CONSTRUCTION (CHEMBUR ) has 2 registrations on MahaRERA, including TULSI CHAMBERS and TULSI CHAMBER PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that TULSI CHAMBERS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if TULSI CHAMBERS is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TULSI CHAMBERS?

The registered promoter entity is SURANA CONSTRUCTION (CHEMBUR ), an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TULSI CHAMBERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TULSI CHAMBERS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TULSI CHAMBERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TULSI CHAMBERS?

The professionals named in the filing: Architect: Gurunath Lala Pangam; Architect: Aakar Architects & Consultants; Engineer: M.R. PATIL CONSULTING ENGINEERS PVT LTD.; Engineer: Ramdatt Shakya; Chartered Accountant: Ashwin B Shah & Co; Chartered Accountant: NEHAL MITUL FARIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TULSI CHAMBERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TULSI CHAMBERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TULSI CHAMBERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.