Home / Browse projects / Mumbai Suburban, Maharashtra / TULSI CHAMBERS
TULSI CHAMBERS
By SURANA CONSTRUCTION (CHEMBUR )
RG-MH-19905 · RERA P51800012437 · Last updated on MahaRERA portal: 17 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Litigation declared, 2 cases
- 14 complaints at MahaRERA
- Completion date moved by 60 months
- 3 extensions taken
- Rs 19.00 crore secured on the land, in favour of Pegasus Trust
Clear
- Separate project account declared
- Allotment letter follows the model form
7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TULSI CHAMBERS is a Commercial project by SURANA CONSTRUCTION (CHEMBUR ) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012437 on 1 Sep 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 60 months from the original filing. 124 of the 132 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 14 complaints are on record with the regulator.
At a glance
Project
- NameTULSI CHAMBERS
- TypeCommercial
- Location
- 3RD ROAD
- OPP UNION BANK
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800012437
- ReraGenie IDRG-MH-19905
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Sep 2017
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed97 files
Current status
Figures as on 17 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shivaji Nagar SRA Project Phase 1 | NA | 17 | 15 | 0 | 132 | 132 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.
Shivaji Nagar SRA Project Phase 1: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed106
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Mijit Ventures Pvt Ltd | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 43.05 cr | Rs 43.05 cr |
| Shivaji Nagar SRA Project Phase 1 | NA | Rs 35.75 cr | Rs 35.75 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gurunath Lala Pangam |
| Architect | Aakar Architects & Consultants |
| Engineer | M.R. PATIL CONSULTING ENGINEERS PVT LTD. |
| Engineer | Ramdatt Shakya |
| Chartered Accountant | Ashwin B Shah & Co |
| Chartered Accountant | NEHAL MITUL FARIA |
| Partner | Role in project |
|---|---|
| SURANA CONSTRUCTION (CHEMBUR ) | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe entire India was under the severe impact of outbreak of covid 19 since March 2020 till date and more particularly state of Maharashtra has imposed strict lockdown throughout whenever number of cases were increasing. Even during relaxation period , full relaxation was never granted. The labour required for construction site have migrated to their native since March 2020 and very few of them rejoined the site. The testing requirement of labour force and vaccination compulsion was imposed for construction site but there was lack of availability of vaccine. Owing to this reason and people relu
Reason as filed by the promoterThe Project got delayed because of litigation with secured financial creditor namely DHFL which has been now taken over by Piramal group under IBC laws. Tthere has been ongoing dispute with Piramal Group before NCLAT & Hon’ble High court Mumbai for allowing additional charge to be created for raising the funds to complete the project. Owing to this litigation, Promoter is unable to raise the require funds from another financial institution.
Reason as filed by the promoterThere has been delays due to lockdowns, social distancing requirements, and supply chain disruptions. Labor shortages due to illness and travel restrictions also contributed to delays. Increased costs for materials, additional safety measures, and extended project timelines led to budget overruns. Hence we require to extension of Project. Please grant us the extensionas we have a required consent.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 226/2014 | HIGH COURT MUMBAI | PENDING |
| 226/2014 | High Court Mumbai | Ongoing |
Complaints filed with MahaRERA14
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000194041 | Sandeep Oberai | SURANA CONSTRUCTION (CHEMBUR) | 15/09/2020 |
| CC006000000210145 | Janvi Makhijani and Narendra Makhijani | M/s Surana Constructions Chembur | 24/02/2022 |
| CC006000000210149 | Rahul Makhijani and Manoj J Makhijani | M/s. Surana Constructions (Chembur) | 24/02/2022 |
| CC006000000056983 | Deepak Bhandari | Surana Constructions (Chembur) | 30/11/2018 |
| CC006000000057168 | sindhi society | Messers Surana Construction (Chembur) | 04/12/2018 |
| CC006000000210216 | Surana Construction (Chembur) Through its Partner Mr. Surendra Surana | SANDEEP OBERAI | 03/03/2022 |
| CC006000000210217 | M/S. SURANA CONSTRUCTION (CHEMBUR) THROUGH MR. SURENDRA SURANA | RAHUL M. MAKHIJANI | 03/03/2022 |
| CC006000000210219 | M/S. SURANA CONSTRUCTION (CHEMBUR) THROUGH ITS PARTNER MR. SURENDRA SURANA | JANVI N. MAKHIJANI | 03/03/2022 |
| CC006000000303283 | Ritika Manoj Makhijani | Ms/ Surana Construction | 14/11/2022 |
| CC006000000303294 | Jatin K Gandhi | M/s Surana Construction | 14/11/2022 |
| CC006000000303293 | Anil K Nebhnani & Ors | M/s Surana Construction | 14/11/2022 |
| CC006000000303292 | Vimla A Nebhnani & Ors | M/s Surana Construction | 14/11/2022 |
| CC006000000396972 | MAYUR RAGHUNATH SHINDE | - | 05/08/2023 |
| CC006000000396973 | ROHIT RAGHUNATH SHINDE | 1 Surana Developers 2 OMKAR REALTORS & DEVELOPERS PVT LTD 3 ANATOMY REALTORS PVT LTD 4 SURANA CONSTR | 05/08/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 May 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 31-12-25 PI.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 PI 31-12-25.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 S 25 P1.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 30-09-25 PI.pdf | 14 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 S 25 P1.pdf | 14 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 S 25 P1.pdf | 14 Apr 2026 |
| Form 5 (FY 2023-2024)File: Form 5 FY 23-24 PI.pdf | 13 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25 PI.pdf | 13 Dec 2025 |
| Form 5 (FY 2017-2018)File: Form 5.pdf | 11 Dec 2025 |
| Form 5 (FY 2018-2019)File: Form 5.pdf | 11 Dec 2025 |
| Form 5 (FY 2019-2020)File: Form 5 FY 2019-20.pdf | 11 Dec 2025 |
| Form 5 (FY 2020-2021)File: Form 5 FY 2020-21.pdf | 11 Dec 2025 |
| Form 5 (FY 2021-2022)File: Form 5 FY 2021-22.pdf | 11 Dec 2025 |
| Form 5 (FY 2022-2023)File: Form 5 FY 22-23.pdf | 11 Dec 2025 |
| Form 1File: Form 1 PI.pdf | 30 Jul 2025 |
| Form 2File: Form 2 P I.pdf | 30 Jul 2025 |
| Form 3File: Form 3 P I.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold P I.pdf | 30 Jul 2025 |
| Form 1File: Form 1 P1.pdf | 30 Jul 2025 |
| Form 2File: Form 2 P1.pdf | 30 Jul 2025 |
| Form 3File: Form 3 P1.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold P I.pdf | 30 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2024 P1.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2024 PI.pdf | 6 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 31-12-2024 PI.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-2024 PI.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase 1 30-06-2024.pdf | 6 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 certificate of architect phase 1.pdf | 6 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 P I 30-06-2024.pdf | 6 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 Phase I 30-09-2024.pdf | 6 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 1 30-06-2024.pdf | 6 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase I.pdf | 6 Nov 2024 |
| Declaration in FORM BFile: Form B - Promoter-Phase I.pdf | 3 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Certificates of Engineer.pdf | 3 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration of Financial Encumbrances phase1.pdf | 25 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Declaration of Financial Encumbrances phase1.pdf | 25 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 25 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: PHASE-I Sold Unsold.pdf | 22 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2024 P1.pdf | 12 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-20204 P1.pdf | 12 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 31-03-2024 P1.pdf | 12 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf | 19 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM - 2A.pdf | 17 Oct 2023 |
| Certificates of CA (Form 5)File: Form 5 FY 22-23.pdf | 17 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 02.pdf | 13 Oct 2023 |
| Certificates of CA (Form 3)File: Final form 3 31-3-23.pdf | 13 Oct 2023 |
| Other - TechnicalFile: Project Report July-23 for RERA.pdf | 3 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 02 mar revised.pdf | 30 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Mar 23.pdf | 27 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 01-Mar 23.pdf | 22 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold mar 23.pdf | 22 Jun 2023 |
| Other - TechnicalFile: FORM 'B' Affidavit cum Declaration.pdf | 17 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account Phase 1.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: 6.pdf | 31 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: 7.pdf | 31 Mar 2023 |
| Details of encumbrances concerned to LegalFile: 6.pdf | 31 Mar 2023 |
| Details of encumbrances concerned to LegalFile: 7.pdf | 31 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf | 13 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 13 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD LIST.pdf | 13 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSUR - Sandip Pisat.pdf | 13 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20.pdf | 13 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21.pdf | 13 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf | 13 Mar 2023 |
| Declaration about Commencement CertificateFile: DECLERATION CERTIFICATE.pdf | 27 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers certificatre - form-02A.pdf | 27 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTERST.pdf | 27 Feb 2023 |
| Proforma of Agreement for saleFile: AFS.pdf | 14 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of no encumbrances - Legal Phase I.pdf | 23 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Declaration of no encumbrances - Legal Phase I.pdf | 23 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate project.pdf | 15 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: No Deviation for Allotment Letter Phase I.pdf | 15 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: No deviation for Agreement for Sale Phase I.pdf | 15 Dec 2022 |
| CERSAI detailsFile: Cersai.pdf | 17 May 2022 |
| CERSAI detailsFile: SURANA CERSAI.pdf | 21 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf | 20 May 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: download (2).pdf | 20 May 2021 |
| Details of encumbrancesFile: Declaration of Encumbrance_1.pdf | 28 Nov 2020 |
| Details of encumbrancesFile: INDEX 2 INDEX II DHFL.pdf | 28 Nov 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf | 20 Nov 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| TULSI CHAMBERS | CTS 385 CHEMBUR | 128 | Completed | Dec 2020 | Late, Jun 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 7 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TULSI CHAMBERS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OPP UNION BANK6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 383 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: SURANA CONSTRUCTION (CHEMBUR )
SURANA CONSTRUCTION (CHEMBUR ) has 2 registrations on MahaRERA, including TULSI CHAMBERS and TULSI CHAMBER PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that TULSI CHAMBERS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if TULSI CHAMBERS is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TULSI CHAMBERS?
The registered promoter entity is SURANA CONSTRUCTION (CHEMBUR ), an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TULSI CHAMBERS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against TULSI CHAMBERS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for TULSI CHAMBERS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TULSI CHAMBERS?
The professionals named in the filing: Architect: Gurunath Lala Pangam; Architect: Aakar Architects & Consultants; Engineer: M.R. PATIL CONSULTING ENGINEERS PVT LTD.; Engineer: Ramdatt Shakya; Chartered Accountant: Ashwin B Shah & Co; Chartered Accountant: NEHAL MITUL FARIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TULSI CHAMBERS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback