Home / Browse projects / TRITON RESIDENCY

Registered No litigation declared Residential / Group Housing project

TRITON RESIDENCY

By M/S SANKALP VASTU LLP

RG-MH-18928 · RERA P52100077881 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Dec 2029Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 50%
17 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

TRITON RESIDENCY is a Residential / Group Housing project by M/S SANKALP VASTU LLP in VADGAONSHERI, 411014, registered with MahaRERA as P52100077881 on 8 Nov 2024. Possession is promised by 31 Dec 2029. 36 of the 53 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameTRITON RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • .
    • VADGAONSHERI
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077881
  • ReraGenie IDRG-MH-18928

Builder

  • NameM/S SANKALP VASTU LLP
  • Entity typePartnership
  • GSTIN27AEOFS6470E1ZM
  • PartnersPRAFULLA SHANTILAL KOTHARI, MITESH PRAFULLA KOTHARI

Key dates

this monthRegisteredNov 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Nov 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed79 files

Current status

68%36 of 53 units booked
37.3%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D BUILDINGNA8825025
E BUILDINGNA101028028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 50%.

D BUILDING26%
ActivityProgress
Excavation40%
Basement (if any)50%
Podiums (if any)50%
Plinth50%
Stilt Floor50%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E BUILDING26%
ActivityProgress
Excavation40%
Basement (if any)50%
Podiums (if any)50%
Plinth50%
Stilt Floor50%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
D BUILDING22
E BUILDING11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,805 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025
LandownerVillageDistrict
MR BHARAT MURLIDHAR GALANDE-Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI4803.57
Proposed, not sanctioned4,804 sq m
Buildings approved5
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLALWANI REGENCY, SHOP NO-1 and 2, SURVEY NO. 33 ,HISSA NO-1
Estimated costRs 22.18 cr
Cost incurredRs 8.27 cr
Work done37.27%
BuildingWingEstimatedIncurred
E BUILDINGNARs 8.13 crRs 2.97 cr
-NARs 8.13 crRs 2.97 cr
D BUILDINGNARs 5.92 crRs 2.32 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX ARCHITECTS ASSOCIATES
EngineerSANTOSH BHOSALE
Chartered AccountantCA SIDDHANT ABHAY BORA
Chartered AccountantSPCM AND ASSOCIATES
PartnerRole in project
M/S SANKALP VASTU LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 TRITON RESIDENCY.pdf10 Jul 2026
Withdrawal Update Form 2File: FORM2 ENGINEER CERTIFICATE 1ST QTR 2026-27 TRITON RESIDENCY.pdf10 Jul 2026
Withdrawal Update Form 3File: SIGNED FORM 3.pdf10 Jul 2026
Withdrawal Update Form 1File: FORM 1 TRITON RESIDENCY.pdf18 Apr 2026
Withdrawal Update Form 2File: FORM 2 TRITON RESIDENCY.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 TRITON RESIDENCY.pdf18 Apr 2026
Form 2A (FY 2024-2025)File: Form 2a TRITON RESIDENCY.pdf18 Apr 2026
Form 2A (FY 2025-2026)File: FORM 2A TRITON RESIDENCY.pdf18 Apr 2026
Withdrawal Update Form 1File: FORM 1 TRITON RESIDENCY.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2 TRITON RESIDENCY.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 TRITON RESIDENCY.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 SANKALP VASTU LLP.pdf7 Jan 2026
Withdrawal Update Form 1File: FORM 1 2ND QTR 2025-26 (TRITON RESIDENCY) SANKALP VASTU LLP ARCHITECT CERTIFICATE.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 2ND QTR 2025-26 (TRITON RESIDENCY).pdf16 Oct 2025
Withdrawal Update Form 3File: Signed Form 3 of Sankalp Vastu LLP.pdf16 Oct 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 1ST QTR 2025-26 TRITON.pdf19 Jul 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 1ST QTR 2025-26 TRITON.pdf19 Jul 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 1ST QTR 2025-26 TRITON.pdf19 Jul 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 1ST QTR 2025-26 TRITON.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf19 Jul 2025
Withdrawal Update Form 3File: SIGNED FORM 3.pdf19 Jul 2025
Withdrawal Update Form 3File: SIGNED FORM 3.pdf19 Jul 2025
Withdrawal Update Form 3File: SIGNED FORM 3.pdf19 Jul 2025
Withdrawal Update Form 3File: SIGNED FORM 3.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 TRITON RESIDENCY.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 TRITON RESIDENCY.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 TRITON RESIDENCY.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY TRITON RESIDENCY_organized.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2a TRITON RESIDENCY.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf18 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf18 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf18 Jan 2025
Other - FinanceFile: DECLARATION AND JV AGREEMENT.pdf30 Oct 2024
Other - FinanceFile: 1 Other - Technical.pdf25 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A (1).pdf24 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B DECLARATION REVISED.pdf24 Oct 2024
Other - TechnicalFile: Decularation Cum Undertaking annexure a.pdf23 Oct 2024
Copy of the legal title reportFile: LEGEL CERTIFICATE OF SANKALP VASTU LLP.pdf21 Oct 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER 21 10 24.pdf21 Oct 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT NEW.pdf21 Oct 2024
Proforma of Agreement for saleFile: AGREEMENT OF SALE 21 10 24.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 _ Revised_compressed.pdf17 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION FOR CC.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf10 Oct 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT FOR ALLOTMENT LETTER.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE FOR SECURED LOAN.pdf10 Oct 2024
Building plan approvalFile: 5 3 PLAN 3 OF 3.pdf19 Aug 2024
Building plan approvalFile: 5 2 PLAN 2 OF 3.pdf19 Aug 2024
Layout approvalFile: 5 3 PLAN 3 OF 3.pdf19 Aug 2024
Layout approvalFile: 5 2 PLAN 2 OF 3.pdf19 Aug 2024
Layout approvalFile: 5 1 PLAN 1 OF 3.pdf19 Aug 2024
PAN CardFile: 1 SANKALP VASTU LLP PAN CARD.pdf19 Aug 2024
Details of encumbrances concerned to FinanceFile: 3 ENCUMBRANCE CERTIFICATE.pdf19 Aug 2024
Details of encumbrances concerned to FinanceFile: 4 LEGAL ENCUMBRANCE CERTIFICATE.pdf19 Aug 2024
Copy of Layout Approval (in case of layout)File: 5 1 PLAN 1 OF 3.pdf19 Aug 2024
Copy of Layout Approval (in case of layout)File: 5 2 PLAN 2 OF 3.pdf19 Aug 2024
Copy of Layout Approval (in case of layout)File: 5 3 PLAN 3 OF 3.pdf19 Aug 2024
Declaration in FORM BFile: FORM B.pdf19 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: 8 COMMENCMENT CERTIFICATE.pdf19 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: 8 COMMENCMENT CERTIFICATE.pdf19 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 3 PLAN 3 OF 3.pdf19 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 2 PLAN 2 OF 3.pdf19 Aug 2024
CERSAI detailsFile: CERSAI Search Report.pdf19 Aug 2024
CERSAI detailsFile: DECLARATION OF CRESAI.pdf19 Aug 2024
Details of encumbrances concerned to LegalFile: 3 ENCUMBRANCE CERTIFICATE.pdf19 Aug 2024
Details of encumbrances concerned to LegalFile: 4 LEGAL ENCUMBRANCE CERTIFICATE.pdf19 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 25 DISCLOUSRE OF PRAFUL KOTHARI.pdf19 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 25 1 DISCLOUSRE OF MITESH KOTHARI.pdf19 Aug 2024

Keep TRITON RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VADGAONSHERI

2 kmTRITON RESIDENCYCompleted 35Lapsed / revoked 14Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: M/S SANKALP VASTU LLP

M/S SANKALP VASTU LLP has 1 registration on MahaRERA, including TRITON RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if TRITON RESIDENCY is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRITON RESIDENCY?

The registered promoter entity is M/S SANKALP VASTU LLP, a partnership as per the filing. Its GSTIN 27AEOFS6470E1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRITON RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRITON RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRITON RESIDENCY?

The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: SANTOSH BHOSALE; Chartered Accountant: CA SIDDHANT ABHAY BORA; Chartered Accountant: SPCM AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRITON RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRITON RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRITON RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.