Home / Browse projects / Mumbai Suburban, Maharashtra / TRISHABH GREENS - WING A

Completed No litigation declared Residential / Group Housing project

TRISHABH GREENS - WING A

By RISHABH ENTERPRISES

RG-MH-51064 · RERA P51800018331 · Last updated on MahaRERA portal: 31 Oct 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

TRISHABH GREENS - WING A is a Residential / Group Housing project by RISHABH ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018331 on 23 Oct 2018. The registration is recorded completed; possession was promised by 30 Dec 2025.

At a glance

Project

  • NameTRISHABH GREENS - WING A
  • TypeResidential / Group Housing
  • Location
    • OFF R C MARG
    • CHEMBUR NAKA
    • CHEMBUR EAST
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800018331
  • ReraGenie IDRG-MH-51064

Builder

  • NameRISHABH ENTERPRISES
  • Entity typePartnership
  • PartnersSHANTILAL HARAKLAL BADALA, JAIPAL HARAKLAL JAIN, SURENDRA HARAKLAL JAIN, BHERULAL BHURALAL PARMAR, BHARAT PRITHVIRAJ RANAWAT
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2018PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Oct 2018
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

WING A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area518 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1353.0
Proposed, not sanctioned1,353 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3 AND 4, GROUND FLOOR, VIKRANT INDUSTRIAL ESTATE, GOVANDI, MUMBAI-400088

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRI BANSI HASSANAND WADHWA OF B H WADHWA & CO
EngineerSHRI RAAJESH K LADHAD OF STRUCTURAL CONCEPT DESIGNS PVT LTD
Chartered AccountantSHRI PIYUSH C BOLIA OF PIYUSH C BOLIA & CO
PartnerRole in project
RISHABH ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Oct 2022

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: No encumbrance letter 31-10-2022 TGA.pdf31 Oct 2022
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate Form 4 Trishabh Greens - Wing A dt 22-10-2022_.pdf27 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 TGA Q2 2022-23.pdf24 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TGA-09-Engineer Certificate Form 2 TGA Q2 2022-23.pdf24 Oct 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory Wing A as on 30-09-2022.pdf24 Oct 2022
Certificates of CA (Form 3)File: TGA-09-CA Certificate Form 3 TGA Q2 2022-23.pdf24 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_signed 21-10-2022.pdf24 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Trishabh Greens-Wing A Dt 31-03-2022.pdf20 Oct 2022
Details of encumbrancesFile: No encumbrance letter 15-07-2022.pdf19 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 TGA Q1 2022-23.pdf19 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TGA-08-Engineer Certificate Form 2 TGA Q1 2022-23.pdf19 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory Wing A as on 30-06-2022.pdf19 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory Wing A as on 30-06-2022.pdf19 Jul 2022
Certificates of CA (Form 3)File: TGA-08-CA Certificate Form 3 TGA Q1 2022-23.pdf19 Jul 2022
Details of encumbrancesFile: No encumbrance letter 01-05-2022.pdf2 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Form 1 Trishabh Greens Wing A.pdf2 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2 Trishabh Greens Wing A.pdf2 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200236453797_For_Debtor_Based_Search_01_05_2022_22_16_45_610 Asset id2 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory Wing A as on 31-03-2022.pdf2 May 2022
Certificates of CA (Form 3)File: CA Certificate Form 3 Trishabh Greens Wing A.pdf2 May 2022
Declaration about Commencement CertificateFile: Declaration about CC Wing A dt 05-02-2022.pdf5 Feb 2022
Building plan approvalFile: Approved Plans 30-01-2022 pg 1 to 3.pdf1 Feb 2022
Building plan approvalFile: Approved Plans 30-01-2022 pg 4 to 6.pdf1 Feb 2022
Details of encumbrancesFile: No encumbrance letter 01-02-2022.pdf1 Feb 2022
Details of encumbrancesFile: No encumbrance letter 01-02-2022.pdf1 Feb 2022
Building Plan Approval (IOD)File: Approved Plans 30-01-2022 pg 1 to 3.pdf1 Feb 2022
Building Plan Approval (IOD)File: Approved Plans 30-01-2022 pg 4 to 6.pdf1 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Full CC dated 17-01-2022.pdf1 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory Wing A as on 31-12-2021.pdf1 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200229265966_For_Debtor_Based_Search_01_02_2022_15_45_09_295 Asset id1 Feb 2022
Certificates of CA (Form 3)File: CA Certificate Form 3 Trishabh Greens Wing A.pdf1 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Form 1.pdf16 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2_.pdf16 Jan 2022
Details of encumbrancesFile: No encumbrance letter 12-10-2021.pdf15 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Form 1 Trishabh Greens Wing A.pdf15 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2 as on 30-09-2021.pdf15 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory Wing A as on 30-09-2021.pdf15 Oct 2021
Certificates of CA (Form 3)File: CA Certificate Form 3 as on 30-09-2021.pdf15 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Trishabh Greens-Wing A as on 31-03-2021.pdf12 Oct 2021
Details of encumbrancesFile: No encumbrance letter 13-08-2021.pdf13 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2 Trishabh Greens - Wing A as on 30-06-2021.pdf12 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory Wing A as on 30-06-2021.pdf12 Aug 2021
Certificates of CA (Form 3)File: CA Certificate Form 3 Trishabh Greens - Wing A as on 30-06-2021.pdf12 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Form 1 Trishabh Greens Wing A dt 03-08-2021.pdf3 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 CA Certificate Trishabh Greens - Wing A 27-09-2019.pdf1 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 CA Certificate Trishabh Greens - Wing A as on 31-03-2020.pdf1 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: 2250912_FurtherCC_signed.pdf26 Jul 2020
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed A-12, B-2.pdf25 Nov 2019
Proforma of Allotment letterFile: Allotment, Agreement, Undertaking Part 1.pdf29 Oct 2019
Proforma of Allotment letterFile: Allotment, Agreement, Undertaking Part 2.pdf29 Oct 2019
Proforma of Allotment letterFile: Allotment, Agreement, Undertaking Part 3.pdf29 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: Form 5 CA Certificate Trishabh Greens - Wing A 27-09-2019.pdf27 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: CC_11-07-2019.pdf15 Jul 2019
Details of encumbrancesFile: No encumbrance letter 29-05-2019.pdf1 Jun 2019
Building plan approvalFile: Disclosure for sanctioned plan Wing A.pdf23 Oct 2018
Building Plan Approval (IOD)File: Disclosure for sanctioned plan Wing A.pdf23 Oct 2018
OtherFile: Disclosure Trishabh Greens Wing A_.pdf15 Oct 2018
Building plan approvalFile: IOD_03-08-2018.pdf13 Oct 2018
Layout approvalFile: LAYOUT Trishabh Greens.pdf13 Oct 2018
PAN CardFile: Pan Card of Rishabh Enterprises.pdf13 Oct 2018
Copy of the legal title reportFile: Title Certificate from IC Legal 10-02-2014 CTS 1674, 1675_.pdf13 Oct 2018
Copy of the legal title reportFile: Title Certificate from Ganpathy Associates 28-08-2015 CTS 1676, 1677.pdf13 Oct 2018
Details of encumbrancesFile: No encumbrance letter.pdf13 Oct 2018
Copy of Layout Approval (in case of layout)File: LAYOUT Trishabh Greens.pdf13 Oct 2018
Building Plan Approval (IOD)File: IOD_03-08-2018.pdf13 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: CC_30-08-2018.pdf13 Oct 2018
Declaration in FORM BFile: Form B Trishabh Greens - Wing A_.pdf13 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 Trishabh Greens - Wing A.pdf13 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2 Trishabh Greens - Wing A.pdf13 Oct 2018
Certificates of CA (Form 3)File: CA Certificate Form 3 Trishabh Greens - Wing A.pdf13 Oct 2018
Proforma of Allotment letterFile: Letter for Allotment and Agreement Trishabh Greens - Wing A.pdf13 Oct 2018

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRISHABH GREENS - WING A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR NAKA, CHEMBUR EAST6,700+ in Mumbai Suburban

2 kmTRISHABH GREENS - WING ACompleted 153Lapsed / revoked 127Other 149Dot size: filed unitsN

Filed coordinates, straight-line distance. 429 registered projects within 2 km.

Builder: RISHABH ENTERPRISES

Rishabh Enterprises has 5 registrations on MahaRERA, including Arya Heights and TRISHABH GREENS - WING A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if TRISHABH GREENS - WING A is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRISHABH GREENS - WING A?

The registered promoter entity is RISHABH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRISHABH GREENS - WING A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRISHABH GREENS - WING A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRISHABH GREENS - WING A?

The professionals named in the filing: Architect: SHRI BANSI HASSANAND WADHWA OF B H WADHWA & CO; Engineer: SHRI RAAJESH K LADHAD OF STRUCTURAL CONCEPT DESIGNS PVT LTD; Chartered Accountant: SHRI PIYUSH C BOLIA OF PIYUSH C BOLIA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRISHABH GREENS - WING A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRISHABH GREENS - WING A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRISHABH GREENS - WING A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.