Home / Browse projects / Mumbai Suburban, Maharashtra / Tricity Natraj
Tricity Natraj
RG-MH-72535 · RERA P51800050160 · Last updated on MahaRERA portal: 5 Feb 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 4 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tricity Natraj is a Residential / Group Housing project by Tricity Realty LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050160 on 21 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2025.
At a glance
Project
- NameTricity Natraj
- TypeResidential / Group Housing
- Location
- Choitram Gidwani Road
- Wadhavali
- Chembur
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800050160
- ReraGenie IDRG-MH-72535
Builder
- NameTricity Realty LLP
- Entity typePartnership
- GSTIN27AAKFT6601L1ZT
- PartnersKulbir Singh Dayal Singh Rekhi, Harvinder Singh Devinder Singh Lamba, Angad Kulbir Singh Rekhi, Arjun Kulbir Singh Rekhi, Moksh Srichand Pardasani, Manish Srichand Pardasani, Savinder Singh Devinder Singh Lamba
- Other registrations13 more →
- Completed6 of 14
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Mar 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tricity Natraj | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 93%.
Tricity Natraj: 77% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 89% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 93% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 5 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 75% |
| Electrical meter room, sub-station, receiving station | Yes | 40% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed79
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shri Amrik Singh Alag | Kurla | Mumbai Suburban |
| Shri Avtar Singh Divanchand Alag | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Reza Kabul Architects Pvt Ltd |
| Architect | YMS Consultants Limited |
| Engineer | JW Consultants LLP |
| Chartered Accountant | VIKAS KAMRA & CO |
| Chartered Accountant | Umesh Aswani & co |
| Partner | Role in project |
|---|---|
| Tricity Realty LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Feb 2025
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Arch Rera Completion cert Sacn.pdf | 5 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Natraj OC.pdf | 5 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Natraj OC Drawing.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Natraj CA Cert.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tricity Natraj Engineers'S Certificate_0001.pdf | 1 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: tricity Natraj Disclosure of Sold_0001.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chartered Accountant Certificate Natraj.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant Certificate Natraj.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Natraj.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory Natraj.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Natraj Architects Certificate.pdf | 6 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Natraj.pdf | 6 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Natraj.pdf | 6 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert Natraj.pdf | 6 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 5 natraj.pdf | 22 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tricity Natraj.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A up to March 2024 Natraj.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 1 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 1 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 1 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 1 May 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration of encumbrances 10cr.pdf | 12 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Declaration of encumbrances 10cr.pdf | 12 Apr 2024 |
| Building plan approvalFile: Amended CC Drawing.pdf | 9 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended CC Drawing.pdf | 9 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy G17.pdf | 9 Feb 2024 |
| Declaration about Commencement CertificateFile: CC Declaration G17.pdf | 9 Feb 2024 |
| Other - LegalFile: School Possession Receipt.pdf | 9 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TN Architect Certificate.pdf | 24 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate NATRAJ.pdf | 24 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TN CA CERT.pdf | 24 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Tricity Natraj till March 23.pdf | 1 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NT Q2 Arch cert.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Natraj.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked inventory Tricity Natraj.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 19 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances Finance.pdf | 30 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of Encumbrances Finance.pdf | 30 Sep 2023 |
| Other - FinanceFile: Mortgage natraj.pdf | 30 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Natraj.pdf | 7 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 31 03 23.pdf | 6 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Natraj.pdf | 28 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Natraj.pdf | 28 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Tricity Natraj.pdf | 28 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountants Tricity Natraj.pdf | 28 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NATRAJ FORM 3.pdf | 16 Mar 2023 |
| Proforma of Agreement for saleFile: Final draft 24 02 23.pdf | 27 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation and Payment Receipt.pdf | 24 Feb 2023 |
| Other - TechnicalFile: Approval Plan 1.pdf | 24 Feb 2023 |
| Other - TechnicalFile: Approval Plan 2.pdf | 24 Feb 2023 |
| Other - TechnicalFile: Approval Plan 3.pdf | 24 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter Legal AND Finance.pdf | 20 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter Legal AND Finance.pdf | 20 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Approval letter.pdf | 18 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC August 22.pdf | 18 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration Commencement certificate.pdf | 18 Feb 2023 |
| Building plan approvalFile: Aproval Plan.pdf | 13 Feb 2023 |
| Building plan approvalFile: Aproval Plan 2.pdf | 13 Feb 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 13 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Letter Legal.pdf | 13 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances Letter Legal.pdf | 13 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Aproval Plan.pdf | 13 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Aproval Plan 2.pdf | 13 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf | 13 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report.pdf | 13 Feb 2023 |
| Proforma of Allotment letterFile: Allottment letter.pdf | 24 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation report Allotment.pdf | 24 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Disclosure.pdf | 21 Jan 2023 |
| Declaration in FORM BFile: Declaration Natraj form B.pdf | 19 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 19 Jan 2023 |
| Layout approvalFile: 6.pdf | 16 Nov 2022 |
| PAN CardFile: PAN CARD TRICITY LLP.pdf | 16 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: 6.pdf | 16 Nov 2022 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Tricity Promenade | Plot No 20A Sector 38 Nerul navi Mumbai | 69 | Completed | Sep 2023 | Oct 2019 |
| Tricity Panache | Plot No 7 Sector 38 Nerul Navi Mumbai | 64 | Completed | Sep 2023 | Sep 2019 |
| Tricity Palacio | Plot No 5 Sector 38 Nerul Navi Mumbai | 52 | Completed | Sep 2023 | Oct 2019 |
| Tricity Luxuria | Plot No -104 Sector 17 New Panvel West Navi Mumbai | 158 | Completed | Sep 2023 | Jul 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 13 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
Keep Tricity Natraj on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wadhavali, Chembur6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 277 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Tricity Realty LLP
TRICITY REALTY LLP has 14 registrations on MahaRERA, including TRICITY PALACIO and TRICITY PANACHE. Its filings disclose 14 earlier MahaRERA projects: declares 12 of 14 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Tricity Natraj is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tricity Natraj?
The registered promoter entity is Tricity Realty LLP, a partnership as per the filing. Its GSTIN 27AAKFT6601L1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tricity Natraj?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Tricity Natraj?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tricity Natraj?
The professionals named in the filing: Architect: Reza Kabul Architects Pvt Ltd; Architect: YMS Consultants Limited; Engineer: JW Consultants LLP; Chartered Accountant: VIKAS KAMRA & CO; Chartered Accountant: Umesh Aswani & co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tricity Natraj?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback