ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Tower 5, Green Terraces, Godrej City, Panvel

Registered No litigation declared Mixed project

Tower 5, Green Terraces, Godrej City, Panvel

By CAROA PROPERTIES LLP

RG-MH-83568 · RERA PM1272022500305 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 265.00 crore secured on the land, in favour of Axis Bank Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 completed earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
May 2033Possession promisedno revision filed
1 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
138 of 364Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

Tower 5, Green Terraces, Godrej City, Panvel is a Mixed project by CAROA PROPERTIES LLP in Raigarh, Maharashtra, registered with MahaRERA as PM1272022500305 on 17 Jul 2025. Possession is promised by 31 May 2033. 226 of the 364 units on this registration are recorded sold or booked, and 1 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTower 5, Green Terraces, Godrej City, Panvel
  • TypeMixed
  • Location
    • OLD MUMBAI-PUNE ROAD
    • PANVEL
    • Talegaon
    • Khalapur
    • Raigarh
    • 410221
  • Pincode410221
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1272022500305
  • ReraGenie IDRG-MH-83568

Builder

  • NameCAROA PROPERTIES LLP
  • Entity typeOthers
  • GSTIN27AADCC3425D1Z4
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Designated PartnersUraaz Santosh Bahl, Amit Sharma, Priyamvada Navet
  • PartnerRAJIB DAS
  • Named personsRavi Gulab Khubchandani, Uraaz Santosh Bahl, Avtejinder Harbans Mann, Swaroop Agencies Pvt. Ltd
  • Other registrations11 more →
  • Completed2 of 12
  • Past their filed date1
  • Declared earlier projects11 →

Key dates

this monthRegisteredJul 2025PromisedMay 2033

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jul 2025
  • Promised completion31 May 2033
  • Revised completionNone
  • Buildings2 building records
  • Documents filed30 files

Current status

62%226 of 364 units booked
3.5%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 5NA43423290329
MLCP CommercialNA9203535

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

Tower 59%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MLCP Commercial0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed411

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots411
Separate Building371
Podiums / Upper Parking Floor40
BuildingSeparate BuildingPodiums / Upper Parking FloorTotal
Tower 53710371
MLCP Commercial04040

Land and ownership7

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area28,996 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared present
Charge in favour ofAxis Bank Limited
Secured amountRs 265.00 crore
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
Ravi KhubchandaniVikhroliMumbai Suburban
Uraaz BahlVikhroliMumbai Suburban
Avtejinder Singh MannVikhroliMumbai Suburban
Swaroop Agencies Private LimitedVikhroliMumbai Suburban
Riaz BatliwalaVikhroliMumbai Suburban
Amarjit SinghVikhroliMumbai Suburban
Zahan DhanrajgirVikhroliMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra State Road Development Corporation
Permissible FSI170597.64
Proposed, not sanctioned42,442 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, AXIS HOUSE,BOMBAY DYEING MILL COMPOUND,PANDURANG BUDHKAR MARG,WORLI, MUMBAI - 400 025
Estimated costRs 323.20 cr
Cost incurredRs 11.43 cr
Work done3.54%
BuildingWingEstimatedIncurred
Tower 5NARs 238.42 crRs 9.81 cr
-NARs 47.37 crRs 1.62 cr
MLCP CommercialNARs 37.41 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR Design Architects
EngineerVinayasa Consultants
EngineerRajendra V Joshi
EngineerShrishail Gaikwad
Chartered AccountantAKPJ & Associates
Chartered AccountantRupen Dilip Kumar Shah
PartnerRole in project
CAROA PROPERTIES LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504125Jayant PaiCAROA PROPERTIES LLP23/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2033

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1 P3 T5.pdf20 Jul 2026
Withdrawal Update Form 2File: Ph 3 T5 Form 2 Signed .pdf20 Jul 2026
Withdrawal Update Form 3File: Signed P3 T5 Form 3.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Tower 5 Green Terrace.pdf19 Jun 2026
Withdrawal Update Form 1File: Withdrawal Application Form1_Green Terraces T5.pdf20 Apr 2026
Withdrawal Update Form 2File: RERA - Phase 3 - T5 New Format Mar-26 Quarterly_Final.pdf20 Apr 2026
Withdrawal Update Form 3File: GT T5 FORM 3 FINAL.pdf20 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1_Ph3T5.pdf19 Jan 2026
Withdrawal Update Form 2File: RERA-Withdrawal Application Form2_Ph3T5.pdf19 Jan 2026
Withdrawal Update Form 3File: P3 T5.pdf19 Jan 2026
Withdrawal Update Form 1File: New Form 1_Ph3 T5.pdf19 Oct 2025
Withdrawal Update Form 2File: RERA-GODREJ PANVEL_CAROA Phase3-T5 - Final.pdf19 Oct 2025
Withdrawal Update Form 3File: New Form3_Ph3 T5.pdf19 Oct 2025
Declaration and undertaking (Annexure A)File: Tower 5 - Declaration-Cum-Undertaking1.pdf7 Jul 2025
Layout approvalFile: Layout Main sheet.pdf4 Jul 2025
Building plan approvalFile: 1 Ground Floors and Services.pdf4 Jul 2025
Building plan approvalFile: 2 RG Area Daigram.pdf4 Jul 2025
Building plan approvalFile: 3 Typical floor Plan.pdf4 Jul 2025
Building plan approvalFile: 4 BASEMENT FLOOR PLAN (MLCP BUILDING).pdf4 Jul 2025
Building plan approvalFile: 5 GROUND FLOOR PLAN (MLCP BUILDING).pdf4 Jul 2025
Building plan approvalFile: 6 1st FLOOR and 2nd FLOOR (MLCP BUILDING).pdf4 Jul 2025
Building plan approvalFile: 7 3rd Floor and 4th Floor (MLCP BUILDING).pdf4 Jul 2025
Building plan approvalFile: 8 5th FLOOR (MLCP BUILDING).pdf4 Jul 2025
Building plan approvalFile: 9 6th FLOOR (MLCP BUILDING).pdf4 Jul 2025
Building plan approvalFile: 10 7th FLOOR (MLCP BUILDING).pdf4 Jul 2025
Building plan approvalFile: 11 SECTION PLAN (MLCP BUILDING).pdf4 Jul 2025
Building plan approvalFile: 12 GROUND and TERRACE FLOOR PLAN (TOWER 5).pdf4 Jul 2025
Building plan approvalFile: 13 TYPICAL FLOORS PLAN (TOWER 5).pdf4 Jul 2025
Building plan approvalFile: 14 REFUSE FLOORS (TOWER 5).pdf4 Jul 2025
Building plan approvalFile: 15 SECTION PLAN (TOWER 5).pdf4 Jul 2025

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise7 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Tower 4, Green Terraces, Godrej City, PanvelP52000077924Khanavale, Raigarh329Nov 2024OngoingApr 2033Not due yet
Nexspace, Godrej City, PanvelPC1270002501723PANVEL, Raigarh946Dec 2025OngoingDec 2032Not due yet
Green Terraces, Godrej City, PanvelP52000077918Khanavale, Raigarh987Nov 2024OngoingDec 2032Not due yet
Tower 6, The Highlands, Godrej City, PanvelP52000056268Panvel, Raigarh303May 2024OngoingJul 2031Not due yet
Tower 7, The Highlands, Godrej City, PanvelP52000052251Panvel, Raigarh318Aug 2023OngoingNov 2029Not due yet
Tower 5, The Highlands, Godrej City, PanvelP52000049669Panvel, Raigarh299Feb 2023OngoingMay 2029Not due yet
Tower 4, The Highlands, Godrej City, PanvelP52000030367NA, Raigarh298Aug 2021OngoingDec 2026Not due yet
The Highlands, Godrej City, PanvelP52000026790Talegaon, Raigarh877Oct 2020CompletedSep 2026Registered original: Apr 2026Jul 2026
Golf Meadows Godrej City, PanvelP52000018146Khanavale, Raigarh536Oct 2018CompletedDec 2023Dec 2023
GODREJ CITY PANVEL PH.1P52000001298Khanavale, Raigarh-Jul 2017CompletedDec 2022Dec 2022

How this compares with Raigarh

62%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tower 5, Green Terraces, Godrej City, Panvel on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

2 kmTower 5, Green Terraces,Completed 7Lapsed / revoked 2Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: CAROA PROPERTIES LLP

CAROA PROPERTIES LLP has 12 registrations on MahaRERA, including GODREJ CITY PANVEL PH.1 and Golf Meadows Godrej City, Panvel. Its filings disclose 11 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Tower 5, Green Terraces, Godrej City, Panvel is delayed beyond 31 May 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tower 5, Green Terraces, Godrej City, Panvel?

The registered promoter entity is CAROA PROPERTIES LLP, an others as per the filing. Its GSTIN 27AADCC3425D1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tower 5, Green Terraces, Godrej City, Panvel?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Tower 5, Green Terraces, Godrej City, Panvel?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Tower 5, Green Terraces, Godrej City, Panvel?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tower 5, Green Terraces, Godrej City, Panvel?

The professionals named in the filing: Architect: R Design Architects; Engineer: Vinayasa Consultants; Engineer: Rajendra V Joshi; Engineer: Shrishail Gaikwad; Chartered Accountant: AKPJ & Associates; Chartered Accountant: Rupen Dilip Kumar Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tower 5, Green Terraces, Godrej City, Panvel?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tower 5, Green Terraces, Godrej City, Panvel. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tower 5, Green Terraces, Godrej City, Panvel to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.