ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / GODREJ CITY PANVEL PH.1

Completed No litigation declared Others project

GODREJ CITY PANVEL PH.1

By CAROA PROPERTIES LLP

RG-MH-10836 · RERA P52000001298 · Last updated on MahaRERA portal: 18 Jul 2024

Source: official MahaRERA filing

Red flags

  • 8 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
8Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

GODREJ CITY PANVEL PH.1 is a Others project by CAROA PROPERTIES LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000001298 on 27 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 8 complaints are on record with the regulator.

At a glance

Project

  • NameGODREJ CITY PANVEL PH.1
  • TypeOthers
  • Location
    • Khanavale
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000001298
  • ReraGenie IDRG-MH-10836

Builder

  • NameCAROA PROPERTIES LLP
  • Entity typeOthers
  • GSTIN27AADCC3425D1Z4
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRAJIB DAS, RAJIB DAS
  • Named personsAvtejinder Harbans Mann, Swaroop Agencies Pvt. Ltd, Ravi Gulab Khubchandani, Uraaz Santosh Bahl, Ravi Gulab Khubchandani, Uraaz Santosh Bahl, Avtejinder Harbans Mann, Swaroop Agencies Pvt. Ltd
  • Other registrations11 more →
  • Completed2 of 12
  • Past their filed date1
  • Declared earlier projects11 →

Key dates

this monthRegisteredJul 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Woods - Tower 1NA150000
Woods - Tower 2NA150000
Woods - Tower 3NA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

Woods - Tower 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Woods - Tower 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Woods - Tower 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed2591

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,591
Closed/Covered231
Open Space2,360
BuildingClosed/CoveredOpen SpaceTotal
Woods - Tower 1591,0161,075
Woods - Tower 20615615
Woods - Tower 3172729901

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area30,175 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
Uraaz Santosh BahlKurlaMumbai Suburban
Avtejinder Harbans MannKurlaMumbai Suburban
Riaz Rutton BatlivalaKurlaMumbai Suburban
Zahan Rutton BatlivalaKurlaMumbai Suburban
Amarjit Sajjansingh SinghKurlaMumbai Suburban
Swaroop AgenciesKurlaMumbai Suburban
Ravi Gulab KhubchandaniKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI55009.59
Proposed, not sanctioned55,010 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch12- Mittal Tower, 1st Floor, A- wing, Nariman Point, Mumbai- 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE MATRIX DESIGN CONSULTANTS PVT LTD
ArchitectR Design Architects
EngineerJ W CONSULTANTS
PartnerRole in project
CAROA PROPERTIES LLP-

Litigation declared1

CaseCourtStatus
366/2023District Court PanvelPending

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000023955Clement Tobias AaronCAROA PROPERTIES LLP01/04/2018
CC006000000057058Mahindra KedareCaroa Properties LLP28/11/2018
CC006000000193318Mahindra KedareCaroa Properties LLP21/06/2020
CC006000000395459Mahindra Jagannath KedareCaroa Properties LLP10/05/2023
CC006000000198387Vedprakash B ChopraCaroa Properties LLP20/09/2021
CC006000000428889SANDHYA IYERCAROA PROPERTIES LLP24/01/2024
CC12400224Seema Shahi-25/09/2024
CC12501654Gaurav GuptaCAROA PROPERTIES LLP22/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Sep 2022

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Godrej Woods.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Godrej Woods.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: Godrej Woods.pdf20 Mar 2024
Disclosure of sold/ booked inventoryFile: Godrej Woods.pdf29 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society registration Certificate -Woods CHS Ltd.pdf16 Feb 2024
Home Buyer /Allottee Grievance Redressal CellFile: Home Buyer Allottee Grievance Redressal Cell GODREJ CITY PANVEL PH 1.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory Sep.pdf19 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory Mar.pdf19 Dec 2023
Proforma of Agreement for saleFile: Woods, Godrej City Panvel - AFS Draft_R2.pdf2 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Godrej_City_Panvel__Phase_1_Form_5.pdf30 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Godrej City Phase 1 - OC Letter Copy.pdf20 Sep 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Architect certificate_Phase 1.pdf20 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Godrej City Panvel_Audit Opinion_Form 5_Annexure 1.pdf29 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Panvel - Phase 1 - Signed RERA form 5 - Mar 20.pdf30 Sep 2020
Certificates of CA (Form 5)File: Signed Form V - Caroa - Phase I - Upload - 1.pdf30 Sep 2019
Proforma of Allotment letterFile: Panvel AFS GC (RERA) Aug 19_1-30.pdf9 Aug 2019
Proforma of Allotment letterFile: Panvel AFS GC (RERA) Aug 19_31-end.pdf9 Aug 2019
Proforma of Allotment letterFile: App Form GCity.pdf27 May 2019
Proforma of Allotment letterFile: AFS Gcity 1.pdf27 May 2019
Certificates of CA (Form 5)File: Caroa - Signed Form 5 - March 2018.pdf30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf30 Mar 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Information.pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate RERA (Nov,2017).pdf11 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate RERA (Nov,2017).pdf11 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Panvel Phase 1 - Arch Certificate - As on 31 July 2017.pdf26 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Panvel Phase 1 - Engineer's Certificate (as on 31 July,2017).pdf26 Oct 2017
Proforma of Allotment letterFile: RERA - Application Form 190717.pdf20 Jul 2017
Details of encumbrancesFile: EC - Caroa 18072017.pdf19 Jul 2017
Declaration in FORM BFile: Caroa- Form B.pdf19 Jul 2017
Certificates of CA (Form 3)File: Caroa CA certificate_1.pdf19 Jul 2017
Certificates of CA (Form 3)File: Caroa CA certificate 2.pdf19 Jul 2017
Certificates of CA (Form 3)File: Caroa CA certificate_3.pdf19 Jul 2017
Certificates of CA (Form 3)File: Caroa CA certificate_4.pdf19 Jul 2017
Proforma of Allotment letterFile: RERA - Allotment Letter 180717.pdf19 Jul 2017
Proforma of Allotment letterFile: AFS PART 2.pdf19 Jul 2017
Proforma of Allotment letterFile: AFS PART 1.pdf19 Jul 2017
OtherFile: 78 Letter SUPP DA.pdf19 Jul 2017
Building plan approvalFile: Ph1 Approval.pdf17 Jul 2017
Layout approvalFile: Masterplan Layout.pdf17 Jul 2017
Copy of Layout Approval (in case of layout)File: Masterplan Layout.pdf17 Jul 2017
Building Plan Approval (IOD)File: Ph1 Approval.pdf17 Jul 2017
Layout approvalFile: Layout Approval Reduced File Size.pdf14 Jul 2017
Building plan approvalFile: Building Plan approval Reduced File Size.pdf14 Jul 2017
PAN CardFile: Carao PAN.pdf14 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Approval Reduced File Size.pdf14 Jul 2017
Building Plan Approval (IOD)File: Building Plan approval Reduced File Size.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GodrejCity Phase 1 AC1.pdf14 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf14 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GODREJ CITY PANVEL PH.1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khanavale5,900+ in Raigarh

2 kmGODREJ CITY PANVEL PH.1Completed 6Lapsed / revoked 4Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: CAROA PROPERTIES LLP

CAROA PROPERTIES LLP has 12 registrations on MahaRERA, including GODREJ CITY PANVEL PH.1 and Golf Meadows Godrej City, Panvel. Its filings disclose 11 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GODREJ CITY PANVEL PH.1 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GODREJ CITY PANVEL PH.1?

The registered promoter entity is CAROA PROPERTIES LLP, an others as per the filing. Its GSTIN 27AADCC3425D1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GODREJ CITY PANVEL PH.1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GODREJ CITY PANVEL PH.1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GODREJ CITY PANVEL PH.1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GODREJ CITY PANVEL PH.1?

The professionals named in the filing: Architect: SPACE MATRIX DESIGN CONSULTANTS PVT LTD; Architect: R Design Architects; Engineer: J W CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GODREJ CITY PANVEL PH.1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GODREJ CITY PANVEL PH.1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GODREJ CITY PANVEL PH.1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.