ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / THE UPPER WEST

Registered No litigation declared Residential / Group Housing project

THE UPPER WEST

By SUNSHINE DEVELOPERS

RG-MH-06955 · RERA P99000055589 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 60%
64 of 69Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

THE UPPER WEST is a Residential / Group Housing project by SUNSHINE DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000055589 on 4 Apr 2024. Possession is promised by 31 Dec 2028. 5 of the 69 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE UPPER WEST
  • TypeResidential / Group Housing
  • Location
    • Palghar Satpati Road
    • Opp. Shikshak Patpedi
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000055589
  • ReraGenie IDRG-MH-06955

Builder

  • NameSUNSHINE DEVELOPERS
  • Entity typePartnership
  • PartnerAKSHAT RAJESH BAFNA
  • Other registrations4 more →
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

7%5 of 69 units booked
21.2%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE UPPER WESTNA1615511869

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 60%.

THE UPPER WEST: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered59
Open Space46

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,317 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025
LandownerVillageDistrict
NITIN KRUSHNAJI VARTAKBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityPalghar Municipal Council
Permissible FSI8147.99
Proposed, not sanctioned8,148 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPalghar Mahim Road
Estimated costRs 20.50 cr
Cost incurredRs 4.35 cr
Work done21.21%
BuildingWingEstimatedIncurred
THE UPPER WESTNARs 18.50 crRs 4.35 cr
-NARs 2.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogesh Mhatre KAMALAKAR MHATRE
EngineerHiren M Tanna
EngineerSAGAR R GHARAT
EngineerTejas Chaudhari
Chartered AccountantN J SHAH & ASSOCIATES LLP
Chartered AccountantNandish J Salot
PartnerRole in project
SUNSHINE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jun 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: MAR26-FORM1-THE UPPER WEST.pdf30 Apr 2026
Withdrawal Update Form 2File: MAR26-FORM2-THE UPPER WEST.pdf30 Apr 2026
Withdrawal Update Form 3File: MAR26-THE UPPER WEST-FORM3.pdf30 Apr 2026
Withdrawal Update Form 1File: Dec25-FORM1-THE UPPER WEST_15012026.pdf9 Feb 2026
Withdrawal Update Form 1File: Dec25-FORM1-THE UPPER WEST_15012026.pdf9 Feb 2026
Withdrawal Update Form 2File: The Upper West Withdrawal Application Form2 (1).pdf9 Feb 2026
Withdrawal Update Form 2File: The Upper West Withdrawal Application Form2 (1).pdf9 Feb 2026
Withdrawal Update Form 3File: Form3- The Upper West - Dec 25.pdf9 Feb 2026
Withdrawal Update Form 3File: Form3- The Upper West - Dec 25.pdf9 Feb 2026
Withdrawal Update Form 1File: Form1-The Upper West_20251017.pdf27 Dec 2025
Withdrawal Update Form 1File: The Upper West Form1 Jun 2025.pdf27 Dec 2025
Withdrawal Update Form 1File: The Upper West Form1 Jun 2025.pdf27 Dec 2025
Withdrawal Update Form 1File: The Upper West Form1 Jun 2025.pdf27 Dec 2025
Withdrawal Update Form 1File: The Upper West Form1 Jun 2025.pdf27 Dec 2025
Withdrawal Update Form 1File: Form1-The Upper West_20251017.pdf27 Dec 2025
Withdrawal Update Form 2File: Form2-The upper west-Sep25.pdf27 Dec 2025
Withdrawal Update Form 2File: Form2-The upper west-Sep25.pdf27 Dec 2025
Withdrawal Update Form 2File: Form2-The upper west-jun25.pdf27 Dec 2025
Withdrawal Update Form 2File: Form2-The upper west-jun25.pdf27 Dec 2025
Withdrawal Update Form 2File: Form2-The upper west-jun25.pdf27 Dec 2025
Withdrawal Update Form 2File: Form2-The upper west-Sep25.pdf27 Dec 2025
Withdrawal Update Form 3File: SEP25-THE UPPER WEST-FORM3.pdf27 Dec 2025
Withdrawal Update Form 3File: JUN25-THE UPPER WEST-FORM3.pdf27 Dec 2025
Withdrawal Update Form 3File: JUN25-THE UPPER WEST-FORM3.pdf27 Dec 2025
Withdrawal Update Form 3File: JUN25-THE UPPER WEST-FORM3.pdf27 Dec 2025
Withdrawal Update Form 3File: JUN25-THE UPPER WEST-FORM3.pdf27 Dec 2025
Withdrawal Update Form 3File: SEP25-THE UPPER WEST-FORM3.pdf27 Dec 2025
Form 2A (FY 2024-2025)File: Sunshine Form 2 Dec 2024.pdf26 Dec 2025
Form 5 (FY 2024-2025)File: FORM5-THE UPPER WEST-24-25.pdf13 Dec 2025
Form 1File: DEC24-FORM1.pdf12 Sep 2025
Form 2File: Form2-Dec24 Avyukt_20250824.pdf12 Sep 2025
Form 3File: DEC24-FORM3.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: DEC24-SOLDUNSOLD.pdf12 Sep 2025
Form 1File: SEP24-FORM1.pdf12 Sep 2025
Form 2File: Form2-Sep24 Avyukt_20250824.pdf12 Sep 2025
Form 3File: SEP24-FORM3.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: SEP24-SOLDUNSOLD.pdf12 Sep 2025
Form 1File: JUN24-FORM1.pdf12 Sep 2025
Form 2File: Form2-Jun24 Avyukt_20250824.pdf12 Sep 2025
Form 3File: JUN24-FORM3.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: JUN24-SOLDUNSOLD.pdf12 Sep 2025
Building plan approvalFile: SANCTIONED PLANS TUW NEW-compressed-pages-1.pdf20 Jun 2025
Building plan approvalFile: SANCTIONED PLANS TUW NEW-compressed-pages-2.pdf20 Jun 2025
Declaration and undertaking (Annexure A)File: ANNEXURE A Declaration Cum Undertaking The Upper West _000143.pdf20 Jun 2025
Form 2File: Sunshine Form 2 March 2025.pdf19 Jun 2025
Form 3File: SUNSHINE UPPERWEST Q4 2425.pdf19 Jun 2025
Form 1File: Arch cert The Upper West mar25.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold TUW March 2025.pdf19 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert The Upper West mar25.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: The Upper West Sold Unsold dec.pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Upper West Arch DEC24.pdf1 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vartak Plot.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Upper West jun 24.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Upper West Sep 24.pdf13 Dec 2024
Proforma of Agreement for saleFile: The Upper West 1-4-24.pdf1 Apr 2024
Copy of the legal title reportFile: Legal Title Report The Upper West _000145.pdf6 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement The Upper West _000144.pdf6 Mar 2024
Other - TechnicalFile: ANNEXURE A Declaration Cum Undertaking The Upper West _000143.pdf6 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK _000127.pdf30 Jan 2024
Proforma of Allotment letterFile: Allotment letter.pdf25 Jan 2024
Other - LegalFile: Sunshine Developers - Amendment of Partnership Deed_compressed.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 23-01-2024_000104.pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A -AKSHAT BAFNA 23-01-2024_000106.pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - BHAVESH BAFNA 23-01-2024_000105.pdf23 Jan 2024
Layout approvalFile: THE UPPER WEST SANCTIONED PLANS PAGE 1.pdf18 Jan 2024
Building plan approvalFile: SANCTIONED PLANS SPLIT PAGE 2.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: THE UPPER WEST SANCTIONED PLANS PAGE 1.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLANS SPLIT PAGE 2.pdf18 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293850008_For_Asset_Based_Search_18_01_2024_11_59_00_402.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: Declatrion _000083.pdf3 Jan 2024
Details of encumbrances concerned to LegalFile: Declatrion _000083.pdf3 Jan 2024
Deviation Report with respect to Allotment letterFile: Devivation allotment _000084.pdf3 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: THE UPPER WEST ART _000071.pdf20 Dec 2023
Declaration in FORM BFile: From B AKSHAT BAFNA _000055.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE _000048.pdf20 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION ORDER CC.pdf17 Nov 2023
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE.pdf17 Nov 2023
PAN CardFile: 1 PAN Card.pdf16 Nov 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
KALPATARUBHAU SAHEB DANDEKAR MARG NEAR ARYAN SCHOOL1CompletedDec 2016Dec 2016
TUISI - PUSHPNEAR GANESH KUNAD THEMBODE ROAD PALGHAR 4014041CompletedApr 2013Apr 2013
SUNSHINE APPARTMENTBHAU SAHEB DANDEKAR MARG NEAR ARYAN SCHOOL1CompletedMar 2007Mar 2007

How this compares with Palghar

7%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE UPPER WEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp. Shikshak Patpedi3,200+ in Palghar

2 kmTHE UPPER WESTCompleted 95Lapsed / revoked 46Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 205 registered projects within 2 km.

Builder: SUNSHINE DEVELOPERS

SUNSHINE DEVELOPERS has 5 registrations on MahaRERA, including SOLARIS WING E-1 HDIL LAYOUT and SUNSHINE DEVELOPERS. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if THE UPPER WEST is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE UPPER WEST?

The registered promoter entity is SUNSHINE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE UPPER WEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE UPPER WEST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE UPPER WEST?

The professionals named in the filing: Architect: Yogesh Mhatre KAMALAKAR MHATRE; Engineer: Hiren M Tanna; Engineer: SAGAR R GHARAT; Engineer: Tejas Chaudhari; Chartered Accountant: N J SHAH & ASSOCIATES LLP; Chartered Accountant: Nandish J Salot. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE UPPER WEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE UPPER WEST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE UPPER WEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.