Registered No litigation declared Others project

The Strand

By SSPL Landmarks LLP

RG-MH-88439 · RERA P52100050923 · Last updated on MahaRERA portal: 13 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 40.00 crore secured on the land, in favour of Aditya Birla Finance Ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2027Possession promisedno revision filed
14 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 98%
122 of 285Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 184 documents Report an error

The Strand is a Others project by SSPL Landmarks LLP in Kharadi, 411014, registered with MahaRERA as P52100050923 on 15 May 2023. Possession is promised by 30 Sep 2027. 163 of the 285 units on this registration are recorded sold or booked, and 14 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameThe Strand
  • TypeOthers
  • Location
    • Riverside Road
    • Kharadi
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050923
  • ReraGenie IDRG-MH-88439

Builder

  • NameSSPL Landmarks LLP
  • Entity typePartnership
  • Designated PartnerDhanraj Patil

Key dates

this monthRegisteredMay 2023PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2023
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed184 files

Current status

57%163 of 285 units booked
67.2%Work done, per cost certificate

Figures as on 13 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Strand Square A WingNA1200125125
Inclusive HousingNA8624024
The Strand Abodes C WingNA272068068
The Strand Abodes B WingNA272068068

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 98%.

The Strand Square A Wing72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Inclusive Housing50%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
The Strand Abodes C Wing58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
The Strand Abodes B Wing38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed377

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots377
Closed/Covered377
BuildingClosed/CoveredTotal
The Strand Square A Wing209209
The Strand Abodes C Wing168168

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Ltd
Secured amountRs 40.00 crore
CERSAI search filedYes
Declared on12 Feb 2026
LandownerVillageDistrict
Smt Mangala JamdadeWai (M Cl)Satara
Shri Atmaram LondheBhosariPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI38935.76
Proposed, not sanctioned36,292 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKharadi
Estimated costRs 167.10 cr
Cost incurredRs 112.31 cr
Work done67.21%
BuildingWingEstimatedIncurred
The Strand Square A WingNARs 47.76 crRs 44.42 cr
The Strand Abodes B WingNARs 47.45 crRs 15.89 cr
The Strand Abodes C WingNARs 47.35 crRs 35.94 cr
-NARs 20.54 crRs 12.19 cr
Inclusive HousingNARs 4.00 crRs 3.88 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects & Associates
EngineerPlanedge Consultants Pvt Ltd
EngineerDEEPAK TULSHIRAM TAMBE
Chartered AccountantSPAK & Co
Chartered AccountantPUSHPA PUSHPAK BOGATI
Chartered AccountantKailash R. Mundada& Co
PartnerRole in project
SSPL Landmarks LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600385Ram GawaliSSPL Landmarks LLP27/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed184

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 184 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect 10-4-26.pdf13 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer 10-4-26.pdf13 Apr 2026
Withdrawal Update Form 3File: CA Certificate 6-4-26_compressed.pdf13 Apr 2026
Withdrawal Update Form 1File: Form-1.pdf23 Jan 2026
Withdrawal Update Form 2File: Form-2.pdf23 Jan 2026
Withdrawal Update Form 3File: Form-3.pdf23 Jan 2026
Withdrawal Update Form 1File: Form-1 Architectu0027s Cetificate.pdf2 Nov 2025
Withdrawal Update Form 2File: Form-2 Engineeru0027s Cetificate.pdf2 Nov 2025
Withdrawal Update Form 3File: Form-3 CA Cetificate_compressed.pdf2 Nov 2025
Withdrawal Update Form 1File: Architects Certificate.pdf2 Sep 2025
Withdrawal Update Form 2File: Engineers_Certificate.pdf2 Sep 2025
Withdrawal Update Form 3File: CA_Certificate.pdf2 Sep 2025
Withdrawal Update Form 1File: From -1.pdf5 Aug 2025
Withdrawal Update Form 1File: Architects Certificate.pdf5 Aug 2025
Withdrawal Update Form 2File: FROM 2.pdf5 Aug 2025
Withdrawal Update Form 2File: Engineers_Certificate.pdf5 Aug 2025
Withdrawal Update Form 3File: FROM 3.pdf5 Aug 2025
Withdrawal Update Form 3File: CA_Certificate.pdf5 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A WING (2).pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 Architect Certificate_compressed.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (Mar 2025)_compressed.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate_compressed.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory_compressed.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM-01 DEC-24.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SSPL(THE STRAND)-Dec-24 (1)_11zon.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 02 Engineers Certificate.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM -1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_11zon.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From-5_FY 23-24.pdf18 Jan 2025
Building plan approvalFile: 01_1_11zon.pdf18 Oct 2024
Building plan approvalFile: 02_2_11zon.pdf18 Oct 2024
Building plan approvalFile: 03_3_11zon.pdf18 Oct 2024
Building plan approvalFile: 04_4_11zon.pdf18 Oct 2024
Building plan approvalFile: 05_5_11zon.pdf18 Oct 2024
Building plan approvalFile: 05_5_11zon.pdf18 Oct 2024
Building plan approvalFile: 06_6_11zon.pdf18 Oct 2024
Building plan approvalFile: 07_7_11zon.pdf18 Oct 2024
Building plan approvalFile: 08_8_11zon.pdf18 Oct 2024
Building plan approvalFile: 09_9_11zon.pdf18 Oct 2024
Building plan approvalFile: 10_10_11zon.pdf18 Oct 2024
Building plan approvalFile: 11_11_11zon.pdf18 Oct 2024
Building plan approvalFile: 12_12_11zon.pdf18 Oct 2024
Building plan approvalFile: 13_13_11zon.pdf18 Oct 2024
Building plan approvalFile: 14_1_11zon.pdf18 Oct 2024
Building plan approvalFile: 15_2_11zon.pdf18 Oct 2024
Building plan approvalFile: 16_3_11zon.pdf18 Oct 2024
Building plan approvalFile: 17_4_11zon.pdf18 Oct 2024
Building plan approvalFile: 18_5_11zon.pdf18 Oct 2024
Building plan approvalFile: 19_6_11zon.pdf18 Oct 2024
Building plan approvalFile: 20_7_11zon.pdf18 Oct 2024
Building plan approvalFile: 21_8_11zon.pdf18 Oct 2024
Building plan approvalFile: 22_9_11zon.pdf18 Oct 2024
Building plan approvalFile: 23_10_11zon.pdf18 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 13_13_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 09_9_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 14_1_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 15_2_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 16_3_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 17_4_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 18_5_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 19_6_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 20_7_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 21_8_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 22_9_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 23_10_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 12_12_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 11_11_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_10_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 08_8_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 07_7_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 06_6_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 05_5_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 05_5_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 04_4_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 03_3_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 02_2_11zon.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 01_1_11zon.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 June-24_compressed.pdf1 Aug 2024

Keep The Strand on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi

Builder: SSPL Landmarks LLP

SSPL Landmarks LLP has 1 registration on MahaRERA, including The Strand. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if The Strand is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Strand?

The registered promoter entity is SSPL Landmarks LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Strand?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Strand?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Strand?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Strand?

The professionals named in the filing: Architect: Cubix Architects & Associates; Engineer: Planedge Consultants Pvt Ltd; Engineer: DEEPAK TULSHIRAM TAMBE; Chartered Accountant: SPAK & Co; Chartered Accountant: PUSHPA PUSHPAK BOGATI; Chartered Accountant: Kailash R. Mundada& Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Strand?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Strand. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Strand to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.