Completed No litigation declared Others project

THE SPRINGS

By SMS STAR DEVELOPERS LLP

RG-MH-24949 · RERA P99000005347 · Last updated on MahaRERA portal: 23 Jan 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 45 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2023Possession promisedregistration recorded completed
49 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

THE SPRINGS is a Others project by SMS STAR DEVELOPERS LLP in 401208, registered with MahaRERA as P99000005347 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. The completion date has moved by 45 months from the original filing.

At a glance

Project

  • NameTHE SPRINGS
  • TypeOthers
  • Location
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000005347
  • ReraGenie IDRG-MH-24949

Builder

  • NameSMS STAR DEVELOPERS LLP
  • Entity typePartnership
  • PartnerPRABU SYED ISMAIL HABEEB MOHAMED

Key dates

this monthRegisteredAug 2017First promiseSep 2019Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Sep 2019)
  • Buildings6 building records
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RH1,3,5,7,9,11,13,15NA40000
RH2,4,6,8,10,12,14,16NA40000
RH17,19,21,23,25,27,29,31NA40000
RH18,20,22,24,26,28,30,32NA40000
RH33,34,35,36,37,38,39,40,41,42NA40000
RH 43,44,45NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 23 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

49 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 95%.

RH1,3,5,7,9,11,13,1591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RH2,4,6,8,10,12,14,1691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RH17,19,21,23,25,27,29,3191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RH18,20,22,24,26,28,30,3290%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
RH33,34,35,36,37,38,39,40,41,4245%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RH 43,44,4585%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 23 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered6
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
RH1,3,5,7,9,11,13,15101
RH2,4,6,8,10,12,14,16101
RH17,19,21,23,25,27,29,31101
RH18,20,22,24,26,28,30,32101
RH33,34,35,36,37,38,39,40,41,42145
RH 43,44,45145

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,732 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
RIMSAN INTERNATIONAL-Mumbai City
IMTIYAZ PATEL-Mumbai City

Approvals and building plan

Permissible FSI4509.2
Proposed, not sanctioned4,204 sq m
Buildings approved6
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMARATHA MANDIR DR ANAND RAO NAIR ROAD OPP MUMBAI CENTRAL STATION 400008

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY NARANG
EngineerHANWARE STRUCTURAL
PartnerRole in project
SMS STAR DEVELOPERS LLP-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000001448Sep 2019 → Sep 2020

Reason as filed by the promoterWE are a newly formed LLP , trying to come out with quality development and delivery on time is our MOTO. As of date we are implementing only one project at Pelhar. Teh promoters have infused all the funds apart from few booking advances received . We do not have any borrowing and the banks are also not looking at this industry favourably. Due to slow down in the industry and not many new enquiries our cash flow mismatches are affecting the progress. The working contractors also have to paid on time . Based on the current situation we are confident of completing the project by Sept 2020 as req

EXT99000012587Sep 2019 → Jun 2023

Reason as filed by the promoterThere are 5 Lanes of Row Houses -Four lanes having 8 Row Houses each & Lane 5 having 10 and 3 of the lanes have been completed and handed over to the purchasers. OC also has been received for the 24 RHs Further 8 Row houses will be completed in the month of Sept 2022 and occupancy certificate expected in October 2022 Balance 10 Row houses in one (last) Lane already completed with RCC structure and brickwork is in advanced completion stage. For the above 80% of infrastructure works are also completed already. In a nutshell 24 Row houses are already handed over. The Customers of 10 Row houses in

EXT99000008915Sep 2019 → Mar 2022

Reason as filed by the promoterBACKGROUND SMS star Developers LLP (SMS SD) was incorporated in March 2015 The main objective of the LLP is REAL Estate construction & Development The approach of the LLP is either to do projects on REVENUE sharing basis or by entering in to Joint development agreement with the Land owners We are an LLP in search and are exploring the ever increasing demand of housing/ commercial spaces in Mumbai PROJECTS UNDER IMPLEMENTATION: During the period 2016/17 SMS SD entered into Joint Development agreement with Land owners viz: Mr. Imtiyaz Patel and MIS Rimsan International (Agreement No. 4596 dated

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Nov 2022

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate Revised Form 2A.pdf23 Jan 2023
OtherFile: SMS STAR DEVELOPERS LLP (2).pdf23 Jan 2023
OtherFile: ESTN Letter.pdf23 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Copy Latest.pdf13 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form2ARERA_11zon.pdf23 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: smssdfom5.pdf23 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: smssdfom5.pdf23 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc1to16 1oct20_compressed (1).pdf23 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: sep21oc.pdf23 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc1to16 1oct20_compressed (1).pdf23 Nov 2022
OtherFile: consentSMS.pdf23 Nov 2022
OtherFile: rerafrom29ceo.pdf23 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc1.pdf22 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc2.pdf22 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Lane 3 Part OC.pdf20 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Lane 1 and 2 Part OC.pdf20 Sep 2022
Certificates of CA (Form 5)File: RERACAcertmar18.pdf30 Dec 2018
Layout approvalFile: LAYOUT PELHAR.pdf31 Jul 2017
Building plan approvalFile: PELHA CC COMPRESS.pdf31 Jul 2017
PAN CardFile: New Pan Card SMS STAR.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate Pelhar.pdf31 Jul 2017
Details of encumbrancesFile: Declaration on No Encumbrances.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PELHAR.pdf31 Jul 2017
Building Plan Approval (IOD)File: PELHA CC COMPRESS.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: PELHAR CC (2).pdf31 Jul 2017
Declaration in FORM BFile: Form_B PROMOTER.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 31072017.pdf31 Jul 2017
Certificates of CA (Form 3)File: FINAL CA.pdf31 Jul 2017
Proforma of Allotment letterFile: Declaration Of AFS.pdf31 Jul 2017
OtherFile: Annexure 1-compressed.pdf31 Jul 2017
OtherFile: Layout -compressed.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf29 Jul 2017

Keep THE SPRINGS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmTHE SPRINGSCompleted 4Lapsed / revoked 6Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: SMS STAR DEVELOPERS LLP

SMS STAR DEVELOPERS LLP has 1 registration on MahaRERA, including THE SPRINGS. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if THE SPRINGS is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE SPRINGS?

The registered promoter entity is SMS STAR DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE SPRINGS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE SPRINGS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE SPRINGS?

The professionals named in the filing: Architect: SANJAY NARANG; Engineer: HANWARE STRUCTURAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE SPRINGS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE SPRINGS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE SPRINGS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.