THE SILVER ALTAIR
RG-MH-32356 · RERA P52100080295 · Last updated on MahaRERA portal: 20 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 25.00 crore secured on the land, in favour of STATE BANK OF INDIA
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE SILVER ALTAIR is a Residential / Group Housing project by SILVER STAR GROUP in Pune, Maharashtra, registered with MahaRERA as P52100080295 on 19 May 2025. Possession is promised by 31 Dec 2028. 53 of the 136 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.
At a glance
Project
- NameTHE SILVER ALTAIR
- TypeResidential / Group Housing
- Location
- BRT ROAD
- NR MNGL STATION RAVET
- Ravet
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100080295
- ReraGenie IDRG-MH-32356
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 May 2025
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed78 files
Current status
Figures as on 20 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A TOWER | NA | 4 | 1 | 3 | 0 | 3 |
| B TOWER | NA | 22 | 19 | 133 | 0 | 133 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 70%.
A TOWER19%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B TOWER75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
Progress on shared amenities15
As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed266
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A TOWER | 119 | 14 | 133 |
| B TOWER | 119 | 14 | 133 |
Land and ownership47
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| PANDURANG YASHWANT SONTAKKE | Wakad | Pune |
| SUMAN PANDURANG SONTAKKE | Wakad | Pune |
| NANA PANDURANG SONTAKKE | Wakad | Pune |
| AKANKSHA NANASAHEB SONTAKKE | Wakad | Pune |
| DNYANESHWAR YASHWANT SONTAKKE | Man | Pune |
| DURGABAI DNYANESHWAR SONTAKKE | Man | Pune |
| VINOD DNYANESHWAR SONTAKKE | Man | Pune |
| DEEPALI VINOD SONTAKKE | Man | Pune |
| VIKRAM DNYANESHWAR SONTAKKE | Man | Pune |
| RESHMA VIKRAM SONTAKKE | Man | Pune |
| VISHAL DNYANESHWAR SONTAKKE | Man | Pune |
| SWAMINI VISHAL SONTAKKE | Man | Pune |
| TUKARAM YASHWANT SONTAKKE | Ravet | Pune |
| BAIDA TUKARAM SONTAKKE | Ravet | Pune |
| NILESH TUKARAM SONTAKKE | Ravet | Pune |
| SUPRIYA NILESH SONTAKKE | Ravet | Pune |
| RAKESH TUKARAM SONTAKKE | Ravet | Pune |
| ANJALI RAKESH SONTAKKE | Ravet | Pune |
| HANUMANT YASHWANT SONTAKKE | Ravet | Pune |
| SUNITA HANUMANT SONTAKKE | Ravet | Pune |
| HARSHAL HANUMANT SONTAKKE | Ravet | Pune |
| SUSHANT HANUMANT SONTAKKE | Ravet | Pune |
| POOJA SUSHANT SONTAKKE | Ravet | Pune |
| SUSHILA KUNDLIK SONTAKKE | Ravet | Pune |
| RAJENDRA KUNDLIK SONTAKKE | Ravet | Pune |
| ROHINI RAJENDRA SONTAKKE | Ravet | Pune |
| VAISHNAVI RAJENDRA SONTAKKE | Ravet | Pune |
| ARYA RAJENDRA SONTAKKE | Ravet | Pune |
| NARENDRA KUNDLIK SONTAKKE | Ravet | Pune |
| SHITAL NARENDRA SONTAKKE | Ravet | Pune |
| ANUSHKA NARENDRA SONTAKKE | Ravet | Pune |
| ARYAN NARENDRA SONTAKKE | Ravet | Pune |
| VANDANA GANESH RAJHANS | Ravet | Pune |
| AKSHAY NANA SONTAKKE | Wakad | Pune |
| TUKARAM JAYWANT SHINDE | Ravet | Pune |
| SHALAN TUKARAM SHINDE | Ravet | Pune |
| DHARMENDRA TUKARAM SHINDE | Ravet | Pune |
| CHANDARANI DHARMENDRA SHINDE | Ravet | Pune |
| NANDKUMAR TUKARAM SHINDE | Ravet | Pune |
| AISHWARYA DHARMENDRA SHINDE | Ravet | Pune |
| TANVI NANDKUMAR SHINDE | Ravet | Pune |
| TANMAY NANDKUMAR SHINDE | Ravet | Pune |
| SANTOSH TUKARAM SHINDE | Ravet | Pune |
| DIKSHANT SANTOSH SHINDE | Ravet | Pune |
| VARSHA NANDKUMAR SHINDE | Ravet | Pune |
| PRATIDNYA SANTOSH SHINDE | Ravet | Pune |
| ANITA VIJAY PADALE | Ravet | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B TOWER | NA | Rs 38.84 cr | Rs 26.81 cr |
| A TOWER | NA | Rs 7.16 cr | Rs 1.92 cr |
| - | NA | Rs 4.54 cr | Rs 1.92 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LANDMARK DESIGN GROUP AR USHA RANGRAJAN |
| Engineer | ANUP CHAVAN AND ASSOCIATES |
| Engineer | DIPAK PATIL |
| Chartered Accountant | HS SHARMA AND CO |
| Chartered Accountant | GAURI S MANJREKAR |
| Chartered Accountant | GAJANAN SAKLA |
| Partner | Role in project |
|---|---|
| SILVER STAR GROUP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 May 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM-2A-25-26.pdf | 20 Aug 2026 |
| Form 5 (FY 2025-2026)File: FORM-5-25-26.pdf | 10 Aug 2026 |
| Withdrawal Update Form 1File: FORM-1-ARCH CERT-JUNE-2026.pdf | 6 Aug 2026 |
| Withdrawal Update Form 2File: FORM-2-ENGR CERT-JUNE-2026.pdf | 6 Aug 2026 |
| Withdrawal Update Form 3File: FORM-3-CA CERT-JUNE-2026-COMPRESS.pdf | 6 Aug 2026 |
| Withdrawal Update Form 1File: FORM-1 ARCH CERT-MARC-26.pdf | 10 Jun 2026 |
| Withdrawal Update Form 2File: FORM-2 ENGR CERT-MAR-26.pdf | 10 Jun 2026 |
| Withdrawal Update Form 3File: FORM-3 CA CERT-MAR-26-compressed.pdf | 10 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1 ARCH CERT-DEC-2025.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: FORM-2 ENGR CERT-DEC-2025.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: FORM-3 CA CERT-DEC-2025-COMPRESS.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: FORM-1 ARCH CERT-SEPT-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1 ARCH CERT-SEPT-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2 ENGR CERT-SEPT-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2 ENGR CERT-SEPT-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: FORM-3 CA CERT-SEPT-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: FORM-3 CA CERT-SEPT-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1 ARCH CERT.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: FORM-2 ENGR CERT-JUNE-25.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: FORM-3-JUNE-TOWER A-B-COMM.pdf | 4 Dec 2025 |
| Other - LegalFile: PA-11171-SANTOSH SHINDE - FAMILY.pdf | 16 May 2025 |
| Other - LegalFile: 7-12 SR NO-12-5 RAVET.pdf | 16 May 2025 |
| Copy of the legal title reportFile: SEARCH AND TITLE NEW-12-5_compressed.pdf | 15 May 2025 |
| Copy of the legal title reportFile: SEARCH AND TITLE NEW-8-1_compressed.pdf | 15 May 2025 |
| Other - LegalFile: declaratioN about land owner.pdf | 15 May 2025 |
| Other - LegalFile: 7-12 SR NO-8-1 RAVET.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-TOWER A - B compressed.pdf | 5 May 2025 |
| Other - TechnicalFile: Annexure A.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE A BUILDING compressed.pdf | 19 Apr 2025 |
| Other - TechnicalFile: PCMC EMAIL VERIFICATION.pdf | 15 Apr 2025 |
| Proforma of Agreement for saleFile: PROFORMA AGREEMENT TO SALE DRAFT.pdf | 14 Apr 2025 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER compressed.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE A TOWER compressed.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE B TOWER compressed.pdf | 4 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE B BUILDING compressed.pdf | 4 Apr 2025 |
| Other - LegalFile: DECLARATION NO SALE compressed.pdf | 4 Apr 2025 |
| Other - LegalFile: DECLARATION LAND COST ZERO.pdf | 4 Apr 2025 |
| Other - LegalFile: DECLARATION ABOUT CERSAI.pdf | 4 Apr 2025 |
| CERSAI detailsFile: DECLARATION ABOUT CERSAI.pdf | 4 Apr 2025 |
| Other - FinanceFile: DECLARATION ABOUT CERSAI.pdf | 4 Apr 2025 |
| Other - FinanceFile: DECLARATION NO SALE compressed.pdf | 4 Apr 2025 |
| Other - FinanceFile: DECLARATION LAND COST ZERO.pdf | 4 Apr 2025 |
| Other - TechnicalFile: DECLARATION LAND COST ZERO.pdf | 4 Apr 2025 |
| Other - TechnicalFile: DECLARATION ABOUT CERSAI.pdf | 4 Apr 2025 |
| Other - TechnicalFile: DECLARATION NO SALE compressed.pdf | 4 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION-PROFORMA AGREEMENT compressed.pdf | 4 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 2- Disclosure of interest in other organisations-drv.pdf | 4 Apr 2025 |
| Layout approvalFile: 01-LAYOUT-07-03-2025 compressed.pdf | 1 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: 01-LAYOUT-07-03-2025 compressed.pdf | 1 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCES-LEGAL-FINANCE-MERG.pdf | 31 Mar 2025 |
| CERSAI detailsFile: CERSAI-8-1.pdf | 31 Mar 2025 |
| CERSAI detailsFile: CERSAI-12-5.pdf | 31 Mar 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCES-LEGAL-FINANCE-MERG.pdf | 31 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT -B IN BANK LETTER HEAD.pdf | 28 Mar 2025 |
| Declaration in FORM BFile: form-b-silver star group.pdf | 25 Mar 2025 |
| Building plan approvalFile: 02-BASEMENT2 PARKING.pdf | 24 Mar 2025 |
| Building plan approvalFile: 03-BASEMENT1 PARKING compressed.pdf | 24 Mar 2025 |
| Building plan approvalFile: 04-A TOWER FLOOR PLAN compressed.pdf | 24 Mar 2025 |
| Building plan approvalFile: 05-ELEVATION-A TOWER.pdf | 24 Mar 2025 |
| Building plan approvalFile: 06-B TOWER FLOOR PLAN compressed.pdf | 24 Mar 2025 |
| Building plan approvalFile: 07-B TOWER TERRACE - FLOOR PLAN.pdf | 24 Mar 2025 |
| Building plan approvalFile: 08-B TOWER ELEVATION compressed.pdf | 24 Mar 2025 |
| Building plan approvalFile: 09-B TOWER EAST SIDE ELEVATION compressed.pdf | 24 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 02-BASEMENT2 PARKING.pdf | 24 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 09-B TOWER EAST SIDE ELEVATION compressed.pdf | 24 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 08-B TOWER ELEVATION compressed.pdf | 24 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 07-B TOWER TERRACE - FLOOR PLAN.pdf | 24 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 06-B TOWER FLOOR PLAN compressed.pdf | 24 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 05-ELEVATION-A TOWER.pdf | 24 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 04-A TOWER FLOOR PLAN compressed.pdf | 24 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 03-BASEMENT1 PARKING compressed.pdf | 24 Mar 2025 |
| Declaration about Commencement CertificateFile: declaration abour commencement certificate.pdf | 24 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: format a compressed.pdf | 24 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: declaration-no daviation in allotment.pdf | 24 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A-interest on other real estate project-bvg.pdf | 24 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: disclosure about secured-unsecured loans.pdf | 24 Mar 2025 |
| PAN CardFile: PAN CARD SILVER.pdf | 15 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 04-COMMENCEMENT-07-03-2025.pdf | 15 Mar 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| RUTUGANDH | S NO 141 BEHIND GURUDHAWARA NEAR AKURDI RLY STATION CHINCHWAD | 32 | Completed | Aug 2016 | Late, Jun 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE SILVER ALTAIR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NR MNGL STATION RAVET13,700+ in Pune
Filed coordinates, straight-line distance. 272 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: SILVER STAR GROUP
SILVER STAR GROUP has 4 registrations on MahaRERA, including SILVER PALM GROVE PHASE 2 and THE SILVER ALTAIR TOWER-C. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if THE SILVER ALTAIR is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE SILVER ALTAIR?
The registered promoter entity is SILVER STAR GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE SILVER ALTAIR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE SILVER ALTAIR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE SILVER ALTAIR?
The professionals named in the filing: Architect: LANDMARK DESIGN GROUP AR USHA RANGRAJAN; Engineer: ANUP CHAVAN AND ASSOCIATES; Engineer: DIPAK PATIL; Chartered Accountant: HS SHARMA AND CO; Chartered Accountant: GAURI S MANJREKAR; Chartered Accountant: GAJANAN SAKLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE SILVER ALTAIR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback