ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / The Sanctuary

Completed No litigation declared Residential / Group Housing project

The Sanctuary

By Runwal Construction Private Limited

RG-MH-44239 · RERA P51800012621 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • 61 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedregistration recorded completed
39 of 55Construction stages doneacross 5 buildings; furthest along: Staircases, 97%
61Complaints at MahaRERAon this registration
Jump to the 239 documents Report an error

The Sanctuary is a Residential / Group Housing project by Runwal Construction Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012621 on 6 Sep 2017. The registration is recorded completed; possession was promised by 31 Jul 2028. 61 complaints are on record with the regulator.

At a glance

Project

  • NameThe Sanctuary
  • TypeResidential / Group Housing
  • Location
    • L B S Marg
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012621
  • ReraGenie IDRG-MH-44239

Builder

  • NameRunwal Construction Private Limited
  • Entity typeCompany
  • CINU41001MH2023PTC406024
  • GSTIN27AAMCR8126K1ZT
  • DirectorsSunil Satvilkar, Sujata Rao
  • Other registrations9 more →
  • Completed3 of 10
  • Past their filed date2
  • Declared earlier projects12 →

Key dates

this monthRegisteredSep 2017PromisedJul 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Sep 2017
  • Promised completion31 Jul 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed239 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA2929000
Tower 2NA280000
Tower 3NA290000
Tower 4NA780000
Tower 5NA780000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

39 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 97%.

Tower 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 267%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure89%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises69%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Tower 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 479%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Tower 580%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes15%
Landscaping & Tree PlantingYes5%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1400

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,400
Closed/Covered1,400
BuildingClosed/CoveredTotal
Tower 19090
Tower 25050
Tower 39090
Tower 4500500
Tower 5670670

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area24,406 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI82803.32
Proposed, not sanctioned26,231 sq m
Buildings approved5
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRupam Centre,Cine Planet Sion Circle Sion E Mumbai 400022

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNinad Dinkar Mhaskar
ArchitectPALLAVI MATKARI
EngineerSanjay Singh
Chartered AccountantM.B. Agrawal & Co.
Chartered AccountantS P Gunjal & Associates
PartnerRole in project
Runwal Construction Private Limited-

Litigation declared23

CaseCourtStatus
962/2014High Court of Bombaypending
3441/2014City Civil Courtpending
556/2014National Consumer Disputes Redressal Commissionpending
CC 27/2014National Consumer Disputes Redressal CommissionDisposed of as withdrawn
CC 28/2015National Consumer Disputes Redressal Commissionpending
CC 26/2015National Consumer Disputes Redressal Commissionpending
CC 1419/2015National Consumer Disputes Redressal Commissionpending
CC 470/2015State Consumer Dispute Redressal Commissionpending
CC 223/2016State Consumer Dispute Redressal Commissionpending
CC 126/2014State Consumer Dispute Redressal Commissionpending
CC 127/2014State Consumer Dispute Redressal Commissionpending
SW 9/2017Metropolitan Magistrate Mulund CriminalDisposed of as withdrawn
CRI REV APP 490/2017Sessions Court Mumbai CriminalDisposed off
CRI REV APP 494/2017Sessions Court Mumbai CriminalDisposed off
CRI REV APP 492/2017Sessions Court Mumbai CriminalDisposed off
CRI REV APP 489/2017Sessions Court Mumbai CriminalDisposed off
CRI REV APP 488/2017Sessions Court Mumbai CriminalDisposed off
CRI REV APP 491/2017Sessions Court Mumbai CriminalDisposed off
CRI REV APP 493/2017Session Court Mumbai CriminalDisposed off
CC 1293/2016State Consumer Dispute Redressal Commissionpending
2562/2010City Civil Courtpending
1399/2017City Civil CourtWithdrawn
570/2018High CourtDisposed of as withdrawn

Complaints filed with MahaRERA61

Case no.ComplainantRespondentFiled
CC006000000012515Ajit Darekar ,Apurva DarekarRunwal Constructions24/12/2017
CC006000000000647LOVELY AGARWALRUNWAL CONSTRUCTIONS14/09/2017
CC006000000000926Kishor Sakharam SankheRunwal Constructions26/09/2017
CC006000000001180United Mulund Residents Welfare AssociationRunwal Constructions14/10/2017
CC006000000001257Srinivasan SundaresanRunwal Constructions12/10/2017
CC006000000001623Runwal Infinity C-1101Runwal Constructions22/11/2017
CC006000000012039Garfield Deepak DsouzaRunwal Infinity14/12/2017
CC006000000012048Vinod N TejwaniRunwal Constructions02/12/2017
CC006000000012166MALATHI KRISHNANVIDYA SAGAR VISVANATHAN20/12/2017
CC006000000012425Rajesh K. ThakkerRunwal Constructions21/12/2017
CC006000000012437Neha Arvind NadkarniSandeep Runwal14/12/2017
CC006000000012440Satish M ShirsekarSandeep Runwal14/12/2017
CC006000000012446James PereiraSandeep Runwal15/12/2017
CC006000000012460Prachi ChindarkarSandeep Runwal20/12/2017
CC006000000012466Parag Sawant, Aditi SawantRunwal Constructions16/12/2017
CC006000000012486Sudhir RaySandeep Runwal18/12/2017
CC006000000012496T G RamachandranRUNWAL CONSTRUCTIONS19/12/2017
CC006000000012489Kalyanaraman SabapathiSandeep Runwal18/12/2017
CC006000000012499Kalyanaraman SabapathiSANDEEP RUNWAL19/12/2017
CC006000000012526Nitin JainSandeep Runwal23/12/2017
CC006000000012570Lital Naresh SoniSandeep Runwal22/12/2017
CC006000000012589Samira Halim MohdSandeep Runwal24/12/2017
CC006000000023486PRAVIR KARMOKARRUNWAL CONSTRUCTIONS24/02/2018
CC006000000023684Shankar Narayan NairRunwal Constructions10/03/2018
CC006000000023747Electronfab Engineering Private LimitedRunwal Constructions and Sandeep Runwal15/03/2018
CC006000000023853BHARAT SHAHRUNWAL CONSTRUCTIONS22/03/2018
CC006000000055353CHANDRAKANT T CHELLANIRUNWAL CONSTRUCTIONS13/07/2018
CC006000000057245Satyajeet Arvind Shahade & Reshma Satyajeet Shahade through POA holder Mrs Asawari ShahadeM/s Runwal Construction10/12/2018
CC006000000078943Runwal ConstructionsMr. Pravin Jain/Mrs. Vijaya Jain20/04/2019
CC006000000079455MineshRUNWAL CONSTRUCTIONS28/05/2019
CC006000000079461Girish GopinathRUNWAL CONSTRUCTIONS28/05/2019
CC006000000079477SUBRAMANIAN CVRUNWAL CONSTRUCTIONS28/05/2019
CC006000000079468N P Kailasnath NairRunwal COnstructions28/05/2019
CC006000000079471SUKUMAR PRAMANIKRUNWAL CONSTRUCTIONS28/05/2019
CC006000000079473LESLIE SEQUEIRARUNWAL CONSTRUCTIONS28/05/2019
CC006000000079470MOHANLAL RAMCHANDANIRUNWAL CONSTRUCTIONS28/05/2019
CC006000000079467Henry PintoRunwal Constructions28/05/2019
CC006000000079476PHILIPOSE GEEVARGHESERUNWAL CONSTRUCTIONS28/05/2019
CC006000000079474KARTHIK BALASUBRAMANIANRUNWAL CONSTRUCTIONS28/05/2019
CC006000000079475AMERNENY VENKATESWARA RAORUNWAL CONSTRUCTIONS01/06/2019
CC006000000079480SHRUTI BAJPAIRUNWAL CONSTRUCTIONS28/05/2019
CC006000000089953Kiran ShettyRunwal Constructions11/07/2019
CC006000000089952Suresh HegdeRunwal Constructions11/07/2019
CC006000000090007Sanjay BhavsarRunwal Constructions11/07/2019
CC006000000089955Nilesh KulkarniRunwal Constructions11/07/2019
CC006000000089957Mrudula BaiskarRunwal Constructions11/07/2019
CC006000000089959Kishor ThakkarRunwal COnstructions11/07/2019
CC006000000089961Prashant BhavsarRunwal Constructions17/07/2019
CC006000000090038Hillary CardozaRunwal Constructions, Runwal Group11/07/2019
CC006000000089963Mahendra MehtaRunwal Constructions11/07/2019
CC006000000089965Chanda NichaniRunwal Constructions11/07/2019
CC006000000089991Umesh Babaya NayakRunwal Constructions, Runwal Group11/07/2019
CC006000000090004Vasudha Sharat KaleRunwal Constructions, Runwal Group11/07/2019
CC006000000090002Jayesh SundarRunwal Constructions, Runwal Group11/07/2019
CC006000000090019UNITED MULUND RESIDENTS WELFARE ASSOCIATIONRUNWAL CONSTRUCTIONS09/07/2019
CC006000000193159United Mulund Residents Welfare AssnRunwal Constructions06/04/2020
CC006000000100215Bindya GurshaniRunwal Constructions, Runwal Group19/07/2019
CC006000000196179Mrs. Neetha PaulRunwal Constructions08/03/2021
CC006000000198671POONAM RAMJI VERMARUNWAL CONSTRUCTIONS14/10/2021
CC006000000209651Rahul Dasgupta, Subhadra Dasgupta, Raviranjan Dasgupta and Lopamudra DasguptaM/s Runwal Constructions27/01/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 May 2025

Documents filed239

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 239 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf5 May 2026
Form 2File: Form 2.pdf5 May 2026
Form 3File: Form 3.pdf5 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf5 May 2026
Form 1File: Form 1.pdf4 May 2026
Form 2File: Form 2.pdf4 May 2026
Form 3File: Form 3.pdf4 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf4 May 2026
Form 1File: Form 1.pdf4 May 2026
Form 2File: Form 2.pdf4 May 2026
Form 3File: Form 3.pdf4 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf4 May 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf12 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf9 Dec 2025
Form 1File: Form 1 June 2025.pdf8 Aug 2025
Form 2File: Form 2.pdf8 Aug 2025
Form 3File: Form 3 June 2025.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Inventory.pdf8 Aug 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC dt 20 02 2025 Tower 1.pdf16 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower 1.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower 3.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 TOWER 1 Dec 2024.pdf5 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower 3 Dec 2024.pdf5 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2024.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf30 Jan 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sep 2024.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Tower 1 and 3.pdf6 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Tower 1 and 3.pdf3 Dec 2024
Certificates of CA (Form 3)File: Form 3 June 2024.pdf29 Oct 2024
Certificates of CA (Form 3)File: Form 3 Sep 2024_compressed.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep 2024.pdf29 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 2024.pdf25 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 Sep 2024.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 Sep 2024 T3.pdf22 Oct 2024
Details of encumbrancesFile: Encumbrance Certificate The Sanctuary.pdf21 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2024 June.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 March 2024.pdf29 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 March 2024.pdf22 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2024.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March 2024.pdf22 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2024.pdf20 Apr 2024
Proforma of Agreement for saleFile: AFS RC to RCPL with full CC dtd 15 02 2024.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory compressed.pdf23 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Tower 1.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Tower 3.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf19 Jan 2024
Certificates of CA (Form 3)File: Form 3.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 30 09 2023.pdf26 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 for Tower 1 30 09 2023.pdf23 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 for Tower 3 30 09 2023.pdf23 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sanctuary 30 09 2023.pdf23 Oct 2023
Certificates of CA (Form 3)File: Form 3 The Sanctuary 30 Sept 2023.pdf20 Oct 2023
Home Buyer /Allottee Grievance Redressal CellFile: Declaration The Sanctuary.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Sanctuary Tower 3.pdf17 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Runwal Sanctuary 1 and 3 as on 30 June 2023.pdf20 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sanctuary Tower 1and 3 31 03 2023.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold list of Sanctuary Tower 1 and 3 dtd 05 07 2023.pdf20 Jul 2023
Certificates of CA (Form 3)File: Form 3 for Sanctuary 1and 3 31 03 2023.pdf20 Jul 2023
Certificates of CA (Form 3)File: Form 3 Sanctuary 1and 3 30 June 2023.pdf20 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ARCHITECT CERTIFICATE TOWER 3 30 06 2023.pdf17 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ARCHITECT CERTIFICATE TOWER 1 30 06 2023.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31 03 2023.pdf21 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sanctuary Tower 1 31 03 2023.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sanctuary Tower 3 31 03 2023.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SANCTUARY_TOWER 1_31-12-2022_FORM 1.pdf20 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SANCTUARY TOWER 3_31-12-2022_FORM 1.pdf20 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanctuary Tower 1 and 3 Engineers Certificate.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Sanctuary Tower 1 and 3 Sold Unsold.pdf20 Jan 2023
Certificates of CA (Form 3)File: Form 3 Sanctuary Tower 1 and 3.pdf16 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 The Sanctuary T 1 and 3 Sep 2022.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: sold unsold The Sanctuary Tower 1 and 3.pdf19 Oct 2022
Certificates of CA (Form 3)File: Form 3 The Sanctuary 1 and 3 Sep 2022.pdf19 Oct 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Runwal Pearl Tower Shell Coral and Oystervillage Chitalsar Manpada Thane288CompletedJun 2012Late, Nov 2013

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Sanctuary on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmThe SanctuaryCompleted 88Lapsed / revoked 59Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 264 registered projects within 2 km.

Builder: Runwal Construction Private Limited

Runwal Construction Private Limited has 10 registrations on MahaRERA, including RUNWAL SERENE and RUNWAL PEARL. Its filings disclose 12 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if The Sanctuary is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Sanctuary?

The registered promoter entity is Runwal Construction Private Limited, a company as per the filing. Its CIN U41001MH2023PTC406024 and GSTIN 27AAMCR8126K1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Sanctuary?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Sanctuary?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Sanctuary?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Sanctuary?

The professionals named in the filing: Architect: Ninad Dinkar Mhaskar; Architect: PALLAVI MATKARI; Engineer: Sanjay Singh; Chartered Accountant: M.B. Agrawal & Co.; Chartered Accountant: S P Gunjal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Sanctuary?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Sanctuary. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Sanctuary to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.