ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / THE RIYASAT SANKALP

Completed No litigation declared Plotted project

THE RIYASAT SANKALP

By Riyasat Infra Developers Private Limited

RG-MH-07230 · RERA P52000054353 · Last updated on MahaRERA portal: 6 Nov 2025

Source: official MahaRERA filing

Red flags

  • Rs 50.00 crore secured on the land, in favour of Aditya Birla Finance Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
97 of 325Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

THE RIYASAT SANKALP is a Plotted project by Riyasat Infra Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000054353 on 15 Jan 2024. The registration is recorded completed; possession was promised by 31 Oct 2025. 228 of the 325 units on this registration are recorded sold or booked.

At a glance

Project

  • NameTHE RIYASAT SANKALP
  • TypePlotted
  • Location
    • NH -4
    • Mumbai Pune highway
    • Village Nadhal
    • Nadhal
    • Khalapur
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000054353
  • ReraGenie IDRG-MH-07230

Builder

  • NameRiyasat Infra Developers Private Limited
  • Entity typeCompany
  • CINU70109RJ2021PTC074734
  • GSTIN27AAKCR9676A1ZZ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorSUMER SINGH SAINI
  • DirectorSUBHASH Chand SAINI
  • Other registrations6 more →
  • Completed5 of 7
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2024PromisedOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jan 2024
  • Promised completion31 Oct 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed59 files

Current status

70%228 of 325 units booked
86.7%Work done, per cost certificate

Figures as on 6 Nov 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 6 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes85%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes85%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes85%
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area74,530 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Ltd
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on7 Aug 2025

Approvals and building plan

Sanctioning authorityMaharashtra State Road Development Corporation
Permissible FSI112540.19
Proposed, not sanctioned112,540 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Shop No-1 and 2, Prajapati House, Plot No 13 Sector-19,Panvel Mahtheran Road, New Panv
Estimated costRs 110.00 cr
Cost incurredRs 95.33 cr
Work done86.66%
BuildingWingEstimatedIncurred
-NARs 110.00 crRs 95.33 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectpRANAY P PASHILKAR
EngineerCREATOR RCC CONSULTANT LLP RUTVIJ PATEL
Chartered AccountantVKG & Company
Chartered AccountantBharat A Choudhary and Co
Chartered AccountantS D PARANJPE & ASSOCIATES CA SHANTANU PARANJAPE
PartnerRole in project
Riyasat Infra Developers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Nov 2025

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: acknowledged copy of completion letter submitted by the Architect to Planning Authority TR6 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 The Riyasat Sankalp 24-25.pdf28 Oct 2025
Completion CertificateFile: copy of the acknowledgement as per land sub-division layout with Architect Certificate TRS28 Oct 2025
Completion CertificateFile: Complation Certificate MSRDC TRS.pdf25 Oct 2025
Completion CertificateFile: Completion TRS.pdf25 Oct 2025
Completion CertificateFile: copy of the acknowledgement as per land sub-division layout TRS.pdf25 Oct 2025
Withdrawal Update Form 1File: Form 1 TRS.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2 TRS.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3 TRS_compressed.pdf24 Oct 2025
Withdrawal Update Form 1File: Form-1 SG Signed.pdf26 Aug 2025
Withdrawal Update Form 2File: Form -2 SG Signed.pdf26 Aug 2025
Withdrawal Update Form 3File: Form 3 TRS 30062025 Signed_compressed (2).pdf26 Aug 2025
Form 1File: Form 1 Architect Certificate - RIDPL.pdf23 May 2025
Form 2File: Form 2 Engineer Certificate - RIDPL.pdf23 May 2025
Form 3File: Final Signed Form 3_31-3-2025_ CA Certificate.pdf23 May 2025
Disclosure of Sold and Booked InventoryFile: Disclsoure of Sold and Booked Inventory_Riyasat Sankalp.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - RIDPL.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Signed Form 3_31-3-2025_ CA Certificate.pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - RIDPL.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate RIDPL - Final.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate RIDPL Mumbai_0001_compressed.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers CertificateRIDPL_0001_0001.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R -1 RIDPL 2 nd Quater (1).pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R -3 RIDPL 2 nd Quater_compressed.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R -2 RIDPL 2 nd Quater.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: pdf20240930_10101349 (1).pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture certificate.pdf1 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificiate_Q1.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Artchitect's Certificate Q4.pdf13 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q4 Final.pdf13 Jun 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrances Concerned to Finance.pdf3 Jan 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrances Concerned to Legal.pdf3 Jan 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrances Concerned to Finance.pdf3 Jan 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrances Concerned to Legal.pdf3 Jan 2024
Proforma of Agreement for saleFile: AFS.pdf3 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf3 Jan 2024
Building plan approval or NA orderFile: ress_compressed_compressed.pdf21 Dec 2023
PAN CardFile: PAn.pdf21 Dec 2023
Copy of the legal title reportFile: Legal Title Report New.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: ress_compressed_compressed.pdf21 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC (1).pdf21 Dec 2023
Declaration about Commencement CertificateFile: Declaration About Commencent Certificate.pdf21 Dec 2023
Declaration in FORM BFile: Affidavit cum Declaration.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (1)_compressed.pdf21 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of intt- Sumer Singh Saini.pdf21 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Intt-Subhash Chand Saini.pdf21 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Of Separate Bank Account.pdf21 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation 2 AL.pdf21 Dec 2023
Other - LegalFile: Board Resolution.pdf21 Dec 2023
Other - FinanceFile: Board Resolution.pdf21 Dec 2023
Other - TechnicalFile: Board Resolution.pdf21 Dec 2023
Layout approvalFile: Layout.pdf20 Dec 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf20 Dec 2023
CERSAI detailsFile: CERSAI.pdf20 Dec 2023
Proforma of Allotment letterFile: Final Allotment Letter.pdf4 Dec 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RIYASAT BLISSP52000079379Village Panshil and Talegaon, Raigarh243Mar 2025OngoingApr 2026Registered original: Dec 2025Not delivered
Riyasat Sankalp extension secondPP1270002500477Nadhal, Raigarh13Aug 2025CompletedOct 2025Late, Nov 2025
Riyasat Sankalp extension firstPP1270002500558Nadhal, Raigarh13Aug 2025CompletedOct 2025Oct 2025
RIYASAT SHOPPING COMPLEXP52000080641Mumbai Pune Highway, Raigarh24Jun 2025OngoingOct 2025Registered original: Jul 2025Not delivered

How this compares with Raigarh

70%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE RIYASAT SANKALP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Nadhal5,900+ in Raigarh

2 kmTHE RIYASAT SANKALPCompleted 5Lapsed / revoked 3Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: Riyasat Infra Developers Private Limited

Riyasat Infra Developers Private Limited has 7 registrations on MahaRERA, including THE RIYASAT SANKALP and RIYASAT BLISS. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if THE RIYASAT SANKALP is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE RIYASAT SANKALP?

The registered promoter entity is Riyasat Infra Developers Private Limited, a company as per the filing. Its CIN U70109RJ2021PTC074734 and GSTIN 27AAKCR9676A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE RIYASAT SANKALP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE RIYASAT SANKALP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE RIYASAT SANKALP?

The professionals named in the filing: Architect: pRANAY P PASHILKAR; Engineer: CREATOR RCC CONSULTANT LLP RUTVIJ PATEL; Chartered Accountant: VKG & Company; Chartered Accountant: Bharat A Choudhary and Co; Chartered Accountant: S D PARANJPE & ASSOCIATES CA SHANTANU PARANJAPE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE RIYASAT SANKALP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE RIYASAT SANKALP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE RIYASAT SANKALP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.