Home / Browse projects / Pune, Maharashtra / THE RISING

Registered No litigation declared Residential / Group Housing project

THE RISING

By SANIKET BUILDCON

RG-MH-89274 · RERA P52100050643 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedno revision filed
16 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 65%
69 of 348Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

THE RISING is a Residential / Group Housing project by SANIKET BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100050643 on 21 Apr 2023. Possession is promised by 31 Jul 2027. 279 of the 348 units on this registration are recorded sold or booked, and 16 of 44 construction stages are filed complete.

At a glance

Project

  • NameTHE RISING
  • TypeResidential / Group Housing
  • Location
    • ADARSH NAGAR
    • KIWALE
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050643
  • ReraGenie IDRG-MH-89274

Builder

  • NameSANIKET BUILDCON
  • Entity typePartnership
  • PartnersAVINASH VITTHAL WANI, RAVINDRA VITTHAL WANI, NITIN BHIKA CHITODKAR, NILESH SURESH PURKAR, RAJENDRA BHIKA CHITODKAR
  • Other registrations1 more →
  • Declared earlier projects7 →

Key dates

this monthRegisteredApr 2023PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion31 Jul 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed136 files

Current status

80%279 of 348 units booked
71.8%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B1 WINGNA242184084
B2 WINGNA242288088
B3 WINGNA242288088
B4 WINGNA242288088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 65%.

B1 WING48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
B2 WING48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
B3 WING48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
B4 WING48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed288

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots288
Closed/Covered288
BuildingClosed/CoveredTotal
B1 WING7272
B2 WING7272
B3 WING7272
B4 WING7272

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,943 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
AVINASH LAKSHMAN BARVE & ORSParvatiPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI40933.88
Proposed, not sanctioned34,934 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPMT BUILDING
Estimated costRs 130.06 cr
Cost incurredRs 93.45 cr
Work done71.85%
BuildingWingEstimatedIncurred
B1 WINGNARs 30.07 crRs 23.36 cr
B2 WINGNARs 30.07 crRs 23.36 cr
B3 WINGNARs 30.07 crRs 23.36 cr
B4 WINGNARs 30.07 crRs 23.36 cr
-NARs 9.76 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArcon Associates
EngineerJONES LANG LASALLE PROPERTY CONSULTANTS INDIA PRIVATE LIMITED
Chartered AccountantNitesh M Shah & Co
Chartered AccountantHNV & Co Chartered Accountants
PartnerRole in project
SANIKET BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - The Rising as on March 2026.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 - The Rising as on March 2026.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3 - The Rising as on March 2026.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1- The Rising Phase 1 as on Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 1File: Form 1- The Rising Phase 1 as on Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2- The Rising Phase 1 as on Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2- The Rising Phase 1 as on Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3- The Rising Phase 1 as on Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3- The Rising Phase 1 as on Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 1File: Form 1 - The Rising as on June 2025.pdf19 Dec 2025
Withdrawal Update Form 1File: Form 1 - The Rising as on June 2025.pdf19 Dec 2025
Withdrawal Update Form 1File: Form 1 - The Rising as on Sept 2025.pdf19 Dec 2025
Withdrawal Update Form 2File: Form 2 - The Rising as on June 2025.pdf19 Dec 2025
Withdrawal Update Form 2File: Form 2 - The Rising as on June 2025.pdf19 Dec 2025
Withdrawal Update Form 2File: Form 2 - The Rising as on Sept 2025.pdf19 Dec 2025
Withdrawal Update Form 3File: Form 1 - The Rising as on June 2025.pdf19 Dec 2025
Withdrawal Update Form 3File: Form 3 - The Rising as on June 2025.pdf19 Dec 2025
Withdrawal Update Form 3File: Form 3 - The Rising as on Sept 2025.pdf19 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - PHASE 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - PHASE 1.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - PHASE 1.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jan-25.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jan 25_11zon.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jan-25.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - THE RISING for FY 2023-24.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sept 24.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sept 24.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sept 24.pdf7 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Sept 24.pdf7 Nov 2024
Layout approvalFile: 1 OF 17 _12_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 2 OF 17_11_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 3 OF 17_10_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 4 OF 17 _9_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 5 OF 17 _8_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 6 OF 17 _7_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 7 of 17 _rotated.pdf17 Oct 2024
Building plan approvalFile: 8 OF 17_6_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 9 of 17 _5_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 10 OF 17 _4_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 11 OF 17 _3_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 12 of 17 _2_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 13 of 17 _1_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 14 of 17 _15_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 15 of 17 _14_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 16 of 17 _13_11zon_rotated.pdf17 Oct 2024
Building plan approvalFile: 16 of 17 _13_11zon_rotated_rotated.pdf17 Oct 2024
Building plan approvalFile: 17 of 17 (1)_rotated.pdf17 Oct 2024
Copy of Layout Approval (in case of layout)File: 1 OF 17 _12_11zon_rotated.pdf17 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-99-2024 Dated 7-10-2024.pdf17 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-99-2024 Dated 7-10-2024.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 11 OF 17 _3_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 of 17 _rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 12 of 17 _2_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 13 of 17 _1_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 14 of 17 _15_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 15 of 17 _14_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 16 of 17 _13_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 16 of 17 _13_11zon_rotated_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 17 of 17 (1)_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 OF 17 _4_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 9 of 17 _5_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 8 OF 17_6_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 OF 17 _7_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 OF 17 _8_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 OF 17 _9_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 OF 17_10_11zon_rotated.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 OF 17_11_11zon_rotated.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Saniket Buildcon_11zon.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- July 2024.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Certificate - FY 2023-24.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - July 2024.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - July 2024.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- July 2024_11zon (1).pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2) (4).pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - The Rising as on March 2024.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - The Rising as on March 2024.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - The Rising as on March 2024.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - The Rising as on Dec 2023.pdf18 Jan 2024

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
The Rising Phase - 2P52100079133Haveli, Pune260Feb 2025OngoingDec 2028Not due yet
METRO JAZZMHALUNGE PUNE 45236-CompletedDec 2022Jul 2020
WHITEFIELD PHASE-1SUS MULSHI PUNE190-CompletedDec 2019Jun 2019
SUNWINDSBAVDHAN KHURD PUNE 21142-CompletedDec 2019Oct 2018
TIMESCAPESNEAR SAHAKAR UDYAN ERANDAWANE PUNE 41100410-CompletedDec 2016May 2016
STYLUSNEAR MITCON COLLEGE BALEWADI PUNE 4522-CompletedDec 2016Oct 2016

How this compares with Pune

80%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE RISING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KIWALE13,700+ in Pune

2 kmTHE RISINGCompleted 17Lapsed / revoked 3Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: SANIKET BUILDCON

SANIKET BUILDCON has 2 registrations on MahaRERA, including THE RISING and The Rising Phase - 2. Its filings disclose 7 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if THE RISING is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE RISING?

The registered promoter entity is SANIKET BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE RISING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE RISING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE RISING?

The professionals named in the filing: Architect: Arcon Associates; Engineer: JONES LANG LASALLE PROPERTY CONSULTANTS INDIA PRIVATE LIMITED; Chartered Accountant: Nitesh M Shah & Co; Chartered Accountant: HNV & Co Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE RISING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE RISING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE RISING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.