The Icon Phase 1

By Leading Frontier Private Limited

RG-MH-67975 · RERA P51700018370 · Last updated on MahaRERA portal: 23 Jan 2025

Source: official MahaRERA filing

Red flags

  • 8 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
8Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

The Icon Phase 1 is a Others project by Leading Frontier Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700018370 on 26 Oct 2018. The registration is recorded completed; possession was promised by 30 Dec 2023. The completion date has moved by 12 months from the original filing. 8 complaints are on record with the regulator.

At a glance

Project

  • NameThe Icon Phase 1
  • TypeOthers
  • Location
    • Highlands Garden Road
    • Dhokali
    • Thane (M Corp.)
    • Thane
    • 400608
  • Pincode400608
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700018370
  • ReraGenie IDRG-MH-67975

Builder

  • NameLeading Frontier Private Limited
  • Entity typeCompany
  • CINU45309MH2017FTC290088
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Directorzhengxing chen
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2018First promiseDec 2022Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Oct 2018
  • Promised completion30 Dec 2023
  • Revised completionRevised to 30 Dec 2023 (originally 30 Dec 2022)
  • Buildings2 building records
  • Documents filed143 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B1 Madison 1NA290000
A2 Madison 2NA330000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

B1 Madison 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A2 Madison 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 23 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes24%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Swimming PoolYes85%
Security SystemYes100%
DG back upYes100%
Children Play AreaYes60%

Parking filed465

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots465
Closed/Covered435
Open Space30
BuildingClosed/CoveredOpen SpaceTotal
B1 Madison 120815223
A2 Madison 222715242

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,237 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Siddhi Real Estate DevelopersThane (M Corp.)Thane
Gowani Hotel Pvt. Ltd.Thane (M Corp.)Thane

Approvals and building plan

Permissible FSI24277.18
Proposed, not sanctioned24,277 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALANAGAR BRANCH, BANDRA, MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Consortium
EngineerMahimtura Consutants Private Limted
Chartered AccountantAshwin B. Shah & CO
PartnerRole in project
Leading Frontier Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700008479Dec 2022 → Dec 2023

Reason as filed by the promoterImpact of COVID 19 is severe more particularly on Real Estate Sector. The major impacts are narrated as under :- 1. Set-back of Migrated Workers resulting in non availability of semi skilled and unskilled workers 2. Social Distancing During Construction has slow down the pace of construction 3. Isolation of Outside Workers while resuming on Construction Site 4. Procurement Delays in Material - many anciliary industries providing raw materials to Real estate are not yet functioning on full capacity. 5. Reduction in purchasing power of people - This has affected the demand & delay in decision of

Litigation declared8

CaseCourtStatus
Writ Petion No 1868/2016Bombay High CourtAt admission stage Next date Second July Two thousand Nineteen
Civil Suit no 791/2010/2010Thane Civil CourtMatter is for Evidence of Defendants are Ongoing Next date Eight March Two Thousand Nineteen
Writ Petition No 8395 of 2015 I to R/2015Bombay High CourtAt Admission Stage Next Date Twelth July Two Thousand Nineteen
Civil Suit No 426/2017/2017Thane Civil CourtStage of Matter was for written statement and reply of the Defendants next date sixteenth March Two
Thane Court, R C A 65/2017/2017Thane Civil CourtBombay High Court F Y Five Hundred Tow by Two thousand One is disposed and Trfd to Thane High Court
Writ Petition No 7204 of 2016/2016Bombay High CourtDose not pertains to Land but pertain to D P road now at admission stage Next date Eleventh March T
Before SDO Officer Thane Appeal no 202/2018 in Tahasildar Thane 84 CC proceeding no 87/2017/2018Before sub Divisional Officer ThaneTenancy Appeal against Order dated Eighteenth July Two Thousand Eighteen passed in Tahasildar Thane
Civil Writ Petition L No 35982/2018/2018High Court BombayWrit Petition is filed for quashing the proceedings filed before the Sun Divisional Office Thane bea

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000195246Nilesh Prabhakar DhageLeading Frontier Pvt Ltd14/12/2020
CC006000000500491Raj Meshram1)CHEN ZHENGXING 2) Darshan Maru 3) Peng Qing 4) Li Jian 5) Yiteng Hung 6) Ankita Bafna05/07/2024
CC006000000408094Prasad Jayakar ShettyLeading Frontier pvt Ltd07/11/2023
CC12400917Aldrich DantasLeading Frontier Private Limited28/11/2024
CC12500350Anushree Nair Ravindran NairLeading Frontier Private Limited31/01/2025
CC12501077priya dinesh navalkarLeading Frontier Private Limited31/03/2025
CC12501274Rajashree HambirLeading Frontier Private Limited16/04/2025
CC12504045Leading Frontier Private LimitedManisha Sudhir Suryavanshi and Sudhir N Suryavanshi17/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jan 2025

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: RERA CERTIFICATE FOR OC -PHASE 1DATED 22-05-2024 (2).PDF23 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A2 B1 Oc Certificate.pdf23 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: phase 1.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Phase 1 (1).pdf4 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE FOR PHASE 1.pdf1 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 (1) (1).PDF5 Feb 2024
Form 2AFile: Form 2A (Phase 1) (Q4 2023).pdf5 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase 1_compressed.pdf20 Oct 2023
Form 2AFile: Form-2A (Phase-1) (Q3 2023).pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Project Status Phase 1 (1).pdf4 Sep 2023
Form 2AFile: Form-2A Phase-1.pdf18 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase 1.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: RERA DISCLOSURE OF SOLD PH1 (2).pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 PH 1 FY 21-22.pdf16 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: phase1 (1)_compressed.pdf10 Nov 2022
Form 2AFile: Form-2A Phase-1 Q3 2022.pdf10 Nov 2022
Disclosure of sold/ booked inventoryFile: Sold Disclosuer Phase - 1.pdf10 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Phase 1 Society Certificate.pdf25 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 (1) (1).pdf21 Jul 2022
Form 2AFile: Form-2A P-1 Q2 2022.pdf21 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Disclosuer Phase - 1.pdf21 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed.pdf20 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-22.pdf20 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf20 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf20 May 2022
Certificates of CA (Form 3)File: Form 3.pdf20 May 2022
Certificates of CA (Form 3)File: Form 3 31-03-22_compressed.pdf20 May 2022
Certificates of CA (Form 3)File: Form 3 P1 Dec 2021.pdf19 May 2022
Certificates of CA (Form 3)File: Form 3 P1 Mar 2022.pdf19 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA - PHASE 1 - FORM 2 - As on 31 December 2021 (1).pdf11 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA - PHASE 1 - FORM 2 - As on 31 March 2022 (1).pdf11 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase 1 March 2022 (2).pdf10 May 2022
Form 2AFile: Form-2A P2 Mar 22.pdf10 May 2022
Disclosure of sold/ booked inventoryFile: Phase 1 Sold Units March 2022.pdf10 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase 1 Form 1_compressed.pdf14 Jan 2022
Form 2AFile: 23 Form-2A Phase-1.pdf14 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200227191455_For_Debtor_Based_Search_03_01_2022_11_50_43_274.pdf3 Jan 2022
Declaration about Commencement CertificateFile: Declaration about CC.PDF1 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA FORM 2 PHASE 1 30 06 2021.pdf25 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA FORM 2 PHASE 1 30 09 2021.pdf25 Nov 2021
Certificates of CA (Form 3)File: The Icon - Form 3 - 30-06-21.pdf24 Nov 2021
Certificates of CA (Form 3)File: The Icon - Form 3 - 30-09-21.pdf24 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 fy 2020-21.pdf12 Nov 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Socity Formation Phase 1.pdf19 Oct 2021
Disclosure of sold/ booked inventoryFile: Phase 1 Disclosure of sold booked inventory_compressed.pdf14 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase 1 - Form 1_compressed.pdf7 Oct 2021
Form 2AFile: Form-2A P-1 Jul-Sep 2021.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf24 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31032020.pdf10 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31032021.pdf10 Sep 2021
Certificates of CA (Form 3)File: Form 3 31032020.pdf10 Sep 2021
Certificates of CA (Form 3)File: Form 3 31032021.pdf10 Sep 2021
Disclosure of sold/ booked inventoryFile: Sold Units Ph 1 29 July 21.pdf10 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P1 - Form 1.pdf26 Jul 2021
Form 2AFile: Form-2A (Phase-1)_compressed.pdf26 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf14 Jul 2021
Certificates of CA (Form 3)File: Form 3.pdf14 Jul 2021
Certificates of CA (Form 3)File: Form 3.pdf14 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: phase 1_compressed.pdf20 Apr 2021
Form 2AFile: Form-2A Phase-1_compressed.pdf20 Apr 2021
Declaration in FORM BFile: Gowani Hotel Form B.pdf18 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf25 Jan 2021
Form 2AFile: Form 2A Dec 2020_compressed.pdf25 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 2020 (3rd Quarter 2020) New_compressed.pdf24 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf16 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: scan0012_compressed.pdf14 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form V.pdf26 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (1st Quarter 2020)-min.pdf22 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (1st Quarter 2020)-min.pdf22 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (2nd Quarter 2020)-min.pdf22 Sep 2020
Form 2AFile: Form-2A (4th Quarter 2019) signed.pdf22 Sep 2020
Form 2AFile: Form-2A (3rd Quarter 2019) signed.pdf22 Sep 2020
Form 2AFile: Form-2A (2nd Quarter 2020).pdf22 Sep 2020
Form 2AFile: Form-2A (1st Quarter 2020)- Signed.pdf22 Sep 2020
PAN CardFile: chen Pan.pdf27 Jun 2020
OtherFile: Declaration for Aadhar Card.pdf27 Jun 2020
Copy of the legal title reportFile: Clearance certificat 1-20.pdf20 Mar 2020
Copy of the legal title reportFile: Clearance certificat 21-40.pdf20 Mar 2020
Copy of the legal title reportFile: Clearance certificat 41-60.pdf20 Mar 2020
Copy of the legal title reportFile: Clearance certificat 61-81.pdf20 Mar 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Icon Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhokali7,600+ in Thane

2 kmThe Icon Phase 1Completed 168Lapsed / revoked 59Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 364 registered projects within 2 km.

Builder: Leading Frontier Private Limited

Leading Frontier Private Limited has 5 registrations on MahaRERA, including The Icon Phase 1 and The Icon Phase 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if The Icon Phase 1 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Icon Phase 1?

The registered promoter entity is Leading Frontier Private Limited, a company as per the filing. Its CIN U45309MH2017FTC290088 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Icon Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Icon Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Icon Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Icon Phase 1?

The professionals named in the filing: Architect: Design Consortium; Engineer: Mahimtura Consutants Private Limted; Chartered Accountant: Ashwin B. Shah & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Icon Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Icon Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Icon Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.