Home / Browse projects / Palghar, Maharashtra / The Heaven-1
The Heaven-1
By OM GAYATRI BUILDER AND DEVELOPER
RG-MH-45830 · RERA P99000016724 · Last updated on MahaRERA portal: 22 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 58 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
The Heaven-1 is a Mixed project by OM GAYATRI BUILDER AND DEVELOPER in Palghar, Maharashtra, registered with MahaRERA as P99000016724 on 5 Jun 2018. Possession is promised by 31 Mar 2028. The completion date has moved by 58 months from the original filing.
At a glance
Project
- NameThe Heaven-1
- TypeMixed
- Location
- VELGAON ROAD
- KONDHAN
- Velgaon
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000016724
- ReraGenie IDRG-MH-45830
Builder
- NameOM GAYATRI BUILDER AND DEVELOPER
- Entity typePartnership
- GSTIN27AAEFO2900K1ZC
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersJAGRUTI VIRENDRA SHAH, VIRENDRA LALBHAI SHAH, Shilpa Amit Wadhwa
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Jun 2018
- Promised completion31 Mar 2028
- Revised completionRevised to 31 Mar 2028 (originally 30 May 2023)
- Buildings52 building records
- Documents filed136 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HEAVEN 1-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 1-D-1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 2-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 3-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 3-D-1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 4-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 4-D-1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 5-E | NA | 3 | 0 | 0 | 0 | 0 |
| HEAVEN 5-E-1 | NA | 3 | 0 | 0 | 0 | 0 |
| HEAVEN 6-E | NA | 3 | 0 | 0 | 0 | 0 |
| HEAVEN 7-C-A | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 7-C-A-1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 7-C-B | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 7-C-B1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 8-C-A | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 8-C-A1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 8-C1-B | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 8 -C1-B1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 8-C1-B2 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 9-E | NA | 3 | 0 | 0 | 0 | 0 |
| HEAVEN 9-E1 | NA | 3 | 0 | 0 | 0 | 0 |
| HEAVEN 10-E | NA | 3 | 0 | 0 | 0 | 0 |
| HEAVEN 10-E1 | NA | 3 | 0 | 0 | 0 | 0 |
| HEAVEN 11-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 11-D1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 12-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 12-D1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 13-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 13-D1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 14-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 14-D1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 15-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 15-D1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 16-D | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 16-D1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 17-F | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 18-C-A | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 18-C-A1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 18-C-A2 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 18-C1-B | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 18-C1-B2 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 19-C1-B | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 19-C-A | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 19-C1-B1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 19-C-A1 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 19-C1-B2 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN 19-C-A2 | NA | 2 | 0 | 0 | 0 | 0 |
| HEAVEN COMMERCIO 22 | NA | 13 | 0 | 0 | 0 | 0 |
| HEAVEN BLDG 21 B | NA | 17 | 0 | 0 | 0 | 0 |
| HEAVEN 21 B1 | NA | 17 | 0 | 0 | 0 | 0 |
| HEAVEN 20 B | NA | 17 | 0 | 0 | 0 | 0 |
| HEAVEN 20 B1 | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 22 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 53 buildings; the table lists the first 20.
72 of 572 construction stages are filed complete across 53 buildings. The stage furthest along is Staircases, at 90%.
HEAVEN 1-D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 1-D-10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 2-D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 3-D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 3-D-10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 4-D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 4-D-10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 5-E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 5-E-10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 6-E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 7-C-A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 7-C-A-10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 7-C-B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 7-C-B10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 8-C-A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 8-C-A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 8-C1-B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 8 -C1-B10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 8-C1-B20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
HEAVEN 9-E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 10% |
| Water Supply | Yes | 5% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 20% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 5% |
| Community Buildings | Yes | 10% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 5% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | Yes | 0% |
Parking filed162
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| HEAVEN 1-D | 0 | 1 | 1 |
| HEAVEN 1-D-1 | 0 | 1 | 1 |
| HEAVEN 2-D | 0 | 1 | 1 |
| HEAVEN 3-D | 0 | 1 | 1 |
| HEAVEN 3-D-1 | 0 | 1 | 1 |
| HEAVEN 4-D | 0 | 1 | 1 |
| HEAVEN 4-D-1 | 0 | 1 | 1 |
| HEAVEN 5-E | 0 | 1 | 1 |
| HEAVEN 5-E-1 | 0 | 1 | 1 |
| HEAVEN 6-E | 0 | 1 | 1 |
| HEAVEN 7-C-A | 0 | 1 | 1 |
| HEAVEN 7-C-A-1 | 0 | 1 | 1 |
| HEAVEN 7-C-B | 0 | 1 | 1 |
| HEAVEN 7-C-B1 | 0 | 1 | 1 |
| HEAVEN 8-C-A | 0 | 1 | 1 |
| HEAVEN 8-C-A1 | 0 | 1 | 1 |
| HEAVEN 8-C1-B | 0 | 1 | 1 |
| HEAVEN 8 -C1-B1 | 0 | 1 | 1 |
| HEAVEN 8-C1-B2 | 0 | 1 | 1 |
| HEAVEN 9-E | 0 | 1 | 1 |
| HEAVEN 9-E1 | 0 | 1 | 1 |
| HEAVEN 10-E | 0 | 1 | 1 |
| HEAVEN 10-E1 | 0 | 1 | 1 |
| HEAVEN 11-D | 0 | 1 | 1 |
| HEAVEN 11-D1 | 0 | 1 | 1 |
| HEAVEN 12-D | 0 | 1 | 1 |
| HEAVEN 12-D1 | 0 | 1 | 1 |
| HEAVEN 13-D | 0 | 1 | 1 |
| HEAVEN 13-D1 | 0 | 1 | 1 |
| HEAVEN 14-D | 0 | 1 | 1 |
| HEAVEN 14-D1 | 0 | 1 | 1 |
| HEAVEN 15-D | 0 | 1 | 1 |
| HEAVEN 15-D1 | 0 | 1 | 1 |
| HEAVEN 16-D | 0 | 1 | 1 |
| HEAVEN 16-D1 | 0 | 1 | 1 |
| HEAVEN 17-F | 0 | 1 | 1 |
| HEAVEN 18-C-A | 0 | 1 | 1 |
| HEAVEN 18-C-A1 | 0 | 1 | 1 |
| HEAVEN 18-C-A2 | 0 | 1 | 1 |
| HEAVEN 18-C1-B | 0 | 1 | 1 |
| HEAVEN 18-C1-B2 | 0 | 1 | 1 |
| HEAVEN 19-C1-B | 0 | 1 | 1 |
| HEAVEN 19-C-A | 0 | 1 | 1 |
| HEAVEN 19-C1-B1 | 0 | 1 | 1 |
| HEAVEN 19-C-A1 | 0 | 1 | 1 |
| HEAVEN 19-C1-B2 | 0 | 1 | 1 |
| HEAVEN 19-C-A2 | 0 | 1 | 1 |
| HEAVEN COMMERCIO 22 | 11 | 24 | 35 |
| HEAVEN BLDG 21 B | 12 | 8 | 20 |
| HEAVEN 21 B1 | 12 | 8 | 20 |
| HEAVEN 20 B | 12 | 8 | 20 |
| HEAVEN 20 B1 | 12 | 8 | 20 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | HITESH SURESH GORHEKAR |
| Engineer | PRANIT VITEKAR |
| Chartered Accountant | Mr K R Srinivasan |
| Chartered Accountant | NORO & Co |
| Chartered Accountant | Gupta & Jasoria |
| Partner | Role in project |
|---|---|
| OM GAYATRI BUILDER AND DEVELOPER | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThis is unit\villa development project of total 18 Villas. Out of which we have only sold and completed 4 villas. Based on the past experience on project Sale we estimate that we need another 48 months to sale and complete the entite project i.e. all 18Villa and Obtain project Completion certificate as Approving Authority will allot the Completion Certificate on Completion of all 18 Villa. Hence, we request provide extension till 31 March 2028. All existing 4 customers do not have any objection if we apply for new Project completion date as 31 March 2028. Copy of consent from all 4 Customers a
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 May 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 May 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 May 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 1 Feb 2023
Documents filed136
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-24.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-24.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sep-24.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-24.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form-03-The Heaven -Mar 2024.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form-03-The Heaven -Jun 2024.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form-03-The Heaven -Sep 2024.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form-03-The Heaven -Dec 2024.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Mar-24.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Jun-24.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Sep-24.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Dec-24.pdf | 22 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-The Heaven March 24.pdf | 22 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: The Heaven - Form 5 FY 22-23.pdf | 22 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: The Heaven - Form 5 FY 22-23.pdf | 22 Feb 2025 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 19 Mar 2024 |
| CERSAI detailsFile: Cersai Report.pdf | 19 Mar 2024 |
| Declaration in FORM BFile: Form B.pdf | 12 Mar 2024 |
| CERSAI detailsFile: 7000000062855702_82765674_2023_PNL_7000000062855702_82765674_2023_PNL_ABJPK1137A_Issue Let | 12 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosue of Interest in Other Organization.pdf | 12 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 revised.pdf | 12 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf | 1 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: The Heaven - Form 5 FY 22-23.pdf | 22 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven June-23.pdf | 21 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sep-23.pdf | 21 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-23.pdf | 21 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven June-23.pdf | 21 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Sep-23.pdf | 21 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Dec-23.pdf | 21 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Details of sold and unsold inventory-Dec 23.pdf | 21 Feb 2024 |
| Certificates of CA (Form 3)File: Form -3- The Heaven June-23.pdf | 21 Feb 2024 |
| Certificates of CA (Form 3)File: Form -3- The Heaven Sep-23.pdf | 21 Feb 2024 |
| Certificates of CA (Form 3)File: Form -3- The Heaven Dec-23.pdf | 21 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-18.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven dec-19.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-20.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-21.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-19.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-20.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-21.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-22.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sep-19.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sept-20.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven sept-21.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sep-22.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-19.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-20.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-21.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-22.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Mar 23.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Mar 23.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-Form -2- The Heaven Sept-18.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1-Form -2- The Heaven Dec-18.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3-Form -2- The Heaven Mar-19.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4-Form -2- The Heaven June-19.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5-Form -2- The Heaven Sep-19.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6-Form -2- The Heaven Dec-19.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4-Form -2- The Heaven June-19.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5-Form -2- The Heaven Sep-19.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6-Form -2- The Heaven Dec-19.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7-Form -2- The Heaven Mar-20.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8-Form -2- The Heaven June-20.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9-Form -2- The Heaven Sep-20.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-Form -2- The Heaven Dec-20.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11-Form -2- The Heaven Mar-21.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12-Form -2- The Heaven June-21.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13-Form -2- The Heaven Sep-21.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14-Form -2- The Heaven Dec-21.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15-Form -2- The Heaven Mar-22.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16-Form -2- The Heaven June-22.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17-Form -2- The Heaven Sep-22.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 18-Form -2- The Heaven Dec-22.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Mar 23.pdf | 23 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3)File: 1-Qtr-Sep 18.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3)File: 2-Qtr-Dec 18.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3)File: 3- Revised Qtr-Mar 19.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3)File: 4-Revised Qtr-Jun 19.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3)File: 5-Revised Qtr-Sep 19.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3)File: 5-Revised Qtr-Sep 19.pdf | 23 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 136 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep The Heaven-1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KONDHAN3,200+ in Palghar
Filed coordinates, straight-line distance. 14 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: OM GAYATRI BUILDER AND DEVELOPER
OM GAYATRI BUILDER AND DEVELOPER has 2 registrations on MahaRERA, including The Heaven-1 and THE HEAVEN-2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if The Heaven-1 is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of The Heaven-1?
The registered promoter entity is OM GAYATRI BUILDER AND DEVELOPER, a partnership as per the filing. Its GSTIN 27AAEFO2900K1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in The Heaven-1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for The Heaven-1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at The Heaven-1?
The professionals named in the filing: Architect: HITESH SURESH GORHEKAR; Engineer: PRANIT VITEKAR; Chartered Accountant: Mr K R Srinivasan; Chartered Accountant: NORO & Co; Chartered Accountant: Gupta & Jasoria. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in The Heaven-1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.