Red flags

  • Completion date moved by 58 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 58 months from the original
72 of 572Construction stages doneacross 53 buildings; furthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

The Heaven-1 is a Mixed project by OM GAYATRI BUILDER AND DEVELOPER in Palghar, Maharashtra, registered with MahaRERA as P99000016724 on 5 Jun 2018. Possession is promised by 31 Mar 2028. The completion date has moved by 58 months from the original filing.

At a glance

Project

  • NameThe Heaven-1
  • TypeMixed
  • Location
    • VELGAON ROAD
    • KONDHAN
    • Velgaon
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000016724
  • ReraGenie IDRG-MH-45830

Builder

  • NameOM GAYATRI BUILDER AND DEVELOPER
  • Entity typePartnership
  • GSTIN27AAEFO2900K1ZC
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersJAGRUTI VIRENDRA SHAH, VIRENDRA LALBHAI SHAH, Shilpa Amit Wadhwa
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2018First promiseMay 2023Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Jun 2018
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 30 May 2023)
  • Buildings52 building records
  • Documents filed136 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HEAVEN 1-DNA20000
HEAVEN 1-D-1NA20000
HEAVEN 2-DNA20000
HEAVEN 3-DNA20000
HEAVEN 3-D-1NA20000
HEAVEN 4-DNA20000
HEAVEN 4-D-1NA20000
HEAVEN 5-ENA30000
HEAVEN 5-E-1NA30000
HEAVEN 6-ENA30000
HEAVEN 7-C-ANA20000
HEAVEN 7-C-A-1NA20000
HEAVEN 7-C-BNA20000
HEAVEN 7-C-B1NA20000
HEAVEN 8-C-ANA20000
HEAVEN 8-C-A1NA20000
HEAVEN 8-C1-BNA20000
HEAVEN 8 -C1-B1NA20000
HEAVEN 8-C1-B2NA20000
HEAVEN 9-ENA30000
HEAVEN 9-E1NA30000
HEAVEN 10-ENA30000
HEAVEN 10-E1NA30000
HEAVEN 11-DNA20000
HEAVEN 11-D1NA20000
HEAVEN 12-DNA20000
HEAVEN 12-D1NA20000
HEAVEN 13-DNA20000
HEAVEN 13-D1NA20000
HEAVEN 14-DNA20000
HEAVEN 14-D1NA20000
HEAVEN 15-DNA20000
HEAVEN 15-D1NA20000
HEAVEN 16-DNA20000
HEAVEN 16-D1NA20000
HEAVEN 17-FNA20000
HEAVEN 18-C-ANA20000
HEAVEN 18-C-A1NA20000
HEAVEN 18-C-A2NA20000
HEAVEN 18-C1-BNA20000
HEAVEN 18-C1-B2NA20000
HEAVEN 19-C1-BNA20000
HEAVEN 19-C-ANA20000
HEAVEN 19-C1-B1NA20000
HEAVEN 19-C-A1NA20000
HEAVEN 19-C1-B2NA20000
HEAVEN 19-C-A2NA20000
HEAVEN COMMERCIO 22NA130000
HEAVEN BLDG 21 BNA170000
HEAVEN 21 B1NA170000
HEAVEN 20 BNA170000
HEAVEN 20 B1NA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 22 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 53 buildings; the table lists the first 20.

72 of 572 construction stages are filed complete across 53 buildings. The stage furthest along is Staircases, at 90%.

HEAVEN 1-D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 1-D-10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 2-D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 3-D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 3-D-10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 4-D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 4-D-10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 5-E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 5-E-10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 6-E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 7-C-A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 7-C-A-10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 7-C-B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 7-C-B10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 8-C-A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 8-C-A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 8-C1-B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 8 -C1-B10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 8-C1-B20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HEAVEN 9-E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes5%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes10%
Street LightingYes5%
Community BuildingsYes10%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes5%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes0%

Parking filed162

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots162
Closed/Covered59
Open Space103
BuildingClosed/CoveredOpen SpaceTotal
HEAVEN 1-D011
HEAVEN 1-D-1011
HEAVEN 2-D011
HEAVEN 3-D011
HEAVEN 3-D-1011
HEAVEN 4-D011
HEAVEN 4-D-1011
HEAVEN 5-E011
HEAVEN 5-E-1011
HEAVEN 6-E011
HEAVEN 7-C-A011
HEAVEN 7-C-A-1011
HEAVEN 7-C-B011
HEAVEN 7-C-B1011
HEAVEN 8-C-A011
HEAVEN 8-C-A1011
HEAVEN 8-C1-B011
HEAVEN 8 -C1-B1011
HEAVEN 8-C1-B2011
HEAVEN 9-E011
HEAVEN 9-E1011
HEAVEN 10-E011
HEAVEN 10-E1011
HEAVEN 11-D011
HEAVEN 11-D1011
HEAVEN 12-D011
HEAVEN 12-D1011
HEAVEN 13-D011
HEAVEN 13-D1011
HEAVEN 14-D011
HEAVEN 14-D1011
HEAVEN 15-D011
HEAVEN 15-D1011
HEAVEN 16-D011
HEAVEN 16-D1011
HEAVEN 17-F011
HEAVEN 18-C-A011
HEAVEN 18-C-A1011
HEAVEN 18-C-A2011
HEAVEN 18-C1-B011
HEAVEN 18-C1-B2011
HEAVEN 19-C1-B011
HEAVEN 19-C-A011
HEAVEN 19-C1-B1011
HEAVEN 19-C-A1011
HEAVEN 19-C1-B2011
HEAVEN 19-C-A2011
HEAVEN COMMERCIO 22112435
HEAVEN BLDG 21 B12820
HEAVEN 21 B112820
HEAVEN 20 B12820
HEAVEN 20 B112820

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,173 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCollector Office Palghar
Permissible FSI11587.78
Proposed, not sanctioned2,242 sq m
Buildings approved18
Buildings sanctioned52

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFORT, MUMBAI

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHITESH SURESH GORHEKAR
EngineerPRANIT VITEKAR
Chartered AccountantMr K R Srinivasan
Chartered AccountantNORO & Co
Chartered AccountantGupta & Jasoria
PartnerRole in project
OM GAYATRI BUILDER AND DEVELOPER-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000019154May 2023 → Mar 2028

Reason as filed by the promoterThis is unit\villa development project of total 18 Villas. Out of which we have only sold and completed 4 villas. Based on the past experience on project Sale we estimate that we need another 48 months to sale and complete the entite project i.e. all 18Villa and Obtain project Completion certificate as Approving Authority will allot the Completion Certificate on Completion of all 18 Villa. Hence, we request provide extension till 31 March 2028. All existing 4 customers do not have any objection if we apply for new Project completion date as 31 March 2028. Copy of consent from all 4 Customers a

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Feb 2023

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-24.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-24.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sep-24.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-24.pdf22 Feb 2025
Certificates of CA (Form 3)File: Form-03-The Heaven -Mar 2024.pdf22 Feb 2025
Certificates of CA (Form 3)File: Form-03-The Heaven -Jun 2024.pdf22 Feb 2025
Certificates of CA (Form 3)File: Form-03-The Heaven -Sep 2024.pdf22 Feb 2025
Certificates of CA (Form 3)File: Form-03-The Heaven -Dec 2024.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Mar-24.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Jun-24.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Sep-24.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Dec-24.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-The Heaven March 24.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: The Heaven - Form 5 FY 22-23.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: The Heaven - Form 5 FY 22-23.pdf22 Feb 2025
Declaration about Commencement CertificateFile: CC Declaration.pdf19 Mar 2024
CERSAI detailsFile: Cersai Report.pdf19 Mar 2024
Declaration in FORM BFile: Form B.pdf12 Mar 2024
CERSAI detailsFile: 7000000062855702_82765674_2023_PNL_7000000062855702_82765674_2023_PNL_ABJPK1137A_Issue Let12 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosue of Interest in Other Organization.pdf12 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 revised.pdf12 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf1 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: The Heaven - Form 5 FY 22-23.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven June-23.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sep-23.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-23.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven June-23.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Sep-23.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- The Heaven Dec-23.pdf21 Feb 2024
Disclosure of sold/ booked inventoryFile: Details of sold and unsold inventory-Dec 23.pdf21 Feb 2024
Certificates of CA (Form 3)File: Form -3- The Heaven June-23.pdf21 Feb 2024
Certificates of CA (Form 3)File: Form -3- The Heaven Sep-23.pdf21 Feb 2024
Certificates of CA (Form 3)File: Form -3- The Heaven Dec-23.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-18.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven dec-19.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-20.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Dec-21.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-19.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-20.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-21.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Jun-22.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sep-19.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sept-20.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven sept-21.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Sep-22.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-19.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-20.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-21.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- The Heaven Mar-22.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Mar 23.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Mar 23.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-Form -2- The Heaven Sept-18.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1-Form -2- The Heaven Dec-18.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3-Form -2- The Heaven Mar-19.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4-Form -2- The Heaven June-19.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5-Form -2- The Heaven Sep-19.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6-Form -2- The Heaven Dec-19.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4-Form -2- The Heaven June-19.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5-Form -2- The Heaven Sep-19.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6-Form -2- The Heaven Dec-19.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7-Form -2- The Heaven Mar-20.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8-Form -2- The Heaven June-20.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9-Form -2- The Heaven Sep-20.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-Form -2- The Heaven Dec-20.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11-Form -2- The Heaven Mar-21.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12-Form -2- The Heaven June-21.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13-Form -2- The Heaven Sep-21.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14-Form -2- The Heaven Dec-21.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15-Form -2- The Heaven Mar-22.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16-Form -2- The Heaven June-22.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17-Form -2- The Heaven Sep-22.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 18-Form -2- The Heaven Dec-22.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Mar 23.pdf23 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory.pdf23 Jun 2023
Certificates of CA (Form 3)File: 1-Qtr-Sep 18.pdf23 Jun 2023
Certificates of CA (Form 3)File: 2-Qtr-Dec 18.pdf23 Jun 2023
Certificates of CA (Form 3)File: 3- Revised Qtr-Mar 19.pdf23 Jun 2023
Certificates of CA (Form 3)File: 4-Revised Qtr-Jun 19.pdf23 Jun 2023
Certificates of CA (Form 3)File: 5-Revised Qtr-Sep 19.pdf23 Jun 2023
Certificates of CA (Form 3)File: 5-Revised Qtr-Sep 19.pdf23 Jun 2023

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 58 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Heaven-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KONDHAN3,200+ in Palghar

2 kmThe Heaven-1Completed 7Lapsed / revoked 4Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: OM GAYATRI BUILDER AND DEVELOPER

OM GAYATRI BUILDER AND DEVELOPER has 2 registrations on MahaRERA, including The Heaven-1 and THE HEAVEN-2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if The Heaven-1 is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Heaven-1?

The registered promoter entity is OM GAYATRI BUILDER AND DEVELOPER, a partnership as per the filing. Its GSTIN 27AAEFO2900K1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Heaven-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Heaven-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Heaven-1?

The professionals named in the filing: Architect: HITESH SURESH GORHEKAR; Engineer: PRANIT VITEKAR; Chartered Accountant: Mr K R Srinivasan; Chartered Accountant: NORO & Co; Chartered Accountant: Gupta & Jasoria. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Heaven-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Heaven-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Heaven-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.