Home / Browse projects / Nashik, Maharashtra / THE GRAND BY PARKSYDE PHASE - 2
THE GRAND BY PARKSYDE PHASE - 2
RG-MH-14994 · RERA P51600034104 · Last updated on MahaRERA portal: 13 Jun 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 12 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE GRAND BY PARKSYDE PHASE - 2 is a Others project by JAIKUMAR CONSTRUCTIONS LTD in Nashik, Maharashtra, registered with MahaRERA as P51600034104 on 24 Mar 2022. The registration is recorded completed; possession was promised by 30 Apr 2027. 38 of the 58 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.
At a glance
Project
- NameTHE GRAND BY PARKSYDE PHASE - 2
- TypeOthers
- Location
- SURVEY NO 52 MOUJE CHANDSHI
- NEAR BAPU BRIDGE
- GANGAPUR ANNEX
- NASHIK
- CHANDSHI
- Nashik
- 422003
- Pincode422003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600034104
- ReraGenie IDRG-MH-14994
Builder
- NameJAIKUMAR CONSTRUCTIONS LTD
- Entity typeCompany
- CINU45100MH2020PLC338134
- GSTIN27AAECJ7816J2Z7
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsMERZYAN HOSI PATEL, HITEN HARIDAS RAJKOTIA
- Other registrations8 more →
- Completed4 of 9
- Declared earlier projects21 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Mar 2022
- Promised completion30 Apr 2027
- Revised completionNone
- Buildings2 building records
- Documents filed86 files
Current status
Figures as on 13 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C | NA | 17 | 16 | 29 | 0 | 29 |
| D | NA | 17 | 16 | 29 | 0 | 29 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed173
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| C | 84 | 3 | 87 |
| D | 83 | 3 | 86 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MANOJ JAIKUMAR TIBREWALA | Nashik | Nashik |
| VISHAL VIKRAM SHAH | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C | NA | Rs 15.22 cr | Rs 15.81 cr |
| D | NA | Rs 15.22 cr | Rs 15.81 cr |
| - | NA | Rs 1.94 cr | Rs 1.60 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Umesh Bagul |
| Engineer | Mr Puneet rai |
| Engineer | PRASHANT BHAURAO BORSE |
| Chartered Accountant | BKSK AND ASSOCIATES |
| Chartered Accountant | BKSK & ASSOCIATES |
| Chartered Accountant | S H A R P A A R T H & CO. |
| Partner | Role in project |
|---|---|
| JAIKUMAR CONSTRUCTIONS LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: COMPLETION C AND D.pdf | 13 Jun 2026 |
| Withdrawal Update Form 1File: ARCH- GRAND PHASE-2 MARCH 26.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: ARCH- GRAND PHASE-2 MARCH 26.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: ARCH- GRAND PHASE-2 MARCH 26.pdf | 13 May 2026 |
| Withdrawal Update Form 2File: ENGINEER GRAND PHASE-2 .pdf | 13 May 2026 |
| Withdrawal Update Form 2File: ENGINEER GRAND PHASE-2 .pdf | 13 May 2026 |
| Withdrawal Update Form 2File: ENGINEER GRAND PHASE-2 .pdf | 13 May 2026 |
| Withdrawal Update Form 3File: CA Grand Ph-2 Mar-26.pdf | 13 May 2026 |
| Withdrawal Update Form 3File: CA Grand Ph-2 Mar-26.pdf | 13 May 2026 |
| Withdrawal Update Form 3File: CA Grand Ph-2 Mar-26.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: ARCHITECT GRAND PHASE-2 JUNE-24.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: ENGINEER GRAND PHASE 2 MARCH-24.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: CA GRAND PHASE-2.pdf | 27 Apr 2026 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GRAND PHASE-2 ENGINEERS JUNE-24.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GRAND PHASE-2 ENGINEERS SEPT-24.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GRAND PHASE-2 ENGINEERS DEC-24.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRAND PHASE 2 SEPT-24.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRAND PHASE 2 SEPT-24.pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Grand Phase 2 june 24.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRAND PHASE 2 JUNE-24.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT GRAND PHASE-2 DEC-24.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT GRAND PHASE-2 SEPT-24.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT GRAND PHASE-2 JUNE-24.pdf | 25 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE GRAND PHASE-2 MARCH-24.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER GRAND PHASE 2 MARCH-24.pdf | 29 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRAND PHASE 2 MARCH-24.pdf | 29 Jun 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Grievance Redressal Cell- The Grand.pdf | 28 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY GRAND PHASE 2.pdf | 20 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT GRAND PHASE-2 MARCH-24.pdf | 30 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 GRAND PHASE 2 2024.pdf | 7 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE GRAND PHASE 2 DEC-23.pdf | 6 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER GRAND PHASE 2 DEC-23.pdf | 1 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRAND PHASE 2 DEC-23.pdf | 1 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER GRAND PHASE 2 DEC-23.pdf | 26 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRNAD PHASE 2 DEC-23.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT GRAND PHASE 2-DEC-23.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE GRAND PHASE-2.pdf | 28 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER GRAND PHASE-2 SEP23.pdf | 16 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRAND PHASE-2 SEP-23.pdf | 16 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT GRAND PHASE 2 SEPT-23.pdf | 13 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE GRAND PHASE 2.pdf | 12 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER JUNE-23 GRAND PHASE 2.pdf | 6 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRAND PHASE-2 JUNE-23.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRAND PHASE-2 JUNE-23.pdf | 31 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE GRAND P-2 MARCH-23.pdf | 5 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT GRAND PHASE 2 JUNE-23.pdf | 27 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GRAND PHASE 2 ENGINEER.pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA GRAND P2 MARCH-23.pdf | 10 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CA CERTIFICATE GRAND PHASE 2 MARCH-22.pdf | 25 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT GRAND PHASE 2 MARCH-23.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY PHASE-2.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER DEC-22 GRAND PHASE 2.pdf | 18 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA GRAND PHASE-2 DEC-22.pdf | 18 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER GRAND CD DEC-22.pdf | 10 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA CERTIFICATE GRAND PHASE 2 MARCH-22.pdf | 17 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GRAND ARCHITECH CERTIFICATE PHASE 2 Q3.pdf | 19 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Grand Phase-2 June 22.pdf | 3 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Grand Phase-2 Sept 22.pdf | 3 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Grand Phase-2 June 22.pdf | 3 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Grand Phase 2 Sept 22.pdf | 3 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Grand Phase-2 Sept 22.pdf | 13 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtect June 22 Phase-2.pdf | 18 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20220712173643.pdf | 18 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20220713174901.pdf | 18 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Grand Phase-2 March 22.pdf | 9 Apr 2022 |
| Copy of the legal title reportFile: Legal Title.pdf | 14 Mar 2022 |
| Details of encumbrancesFile: Encumbrance Declaration.pdf | 14 Mar 2022 |
| Declaration about Commencement CertificateFile: CC Dclaration Phase-2.pdf | 14 Mar 2022 |
| Declaration in FORM BFile: Form -B Phase-2.pdf | 14 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase-2 Grand.pdf | 14 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Phase-2.pdf | 14 Mar 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200232396951_For_Asset_Based_Search_14_03_2022_17_38_01_367.pdf | 14 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase-2.pdf | 14 Mar 2022 |
| Proforma of Allotment letterFile: Declaration Allotment letetr and agreement.pdf | 14 Mar 2022 |
| Layout approvalFile: Final Layout.pdf | 12 Feb 2022 |
| Building plan approvalFile: 1.pdf | 12 Feb 2022 |
| Building plan approvalFile: 7.pdf | 12 Feb 2022 |
| Building plan approvalFile: 9.pdf | 12 Feb 2022 |
| Building plan approvalFile: 5.pdf | 12 Feb 2022 |
| PAN CardFile: PAN JCL.pdf | 12 Feb 2022 |
Promoter's earlier projects15
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PARKSYDE NEST PHASE - 1P51600025620 | PANCHAVATI ANNEX, Nashik | - | Jul 2020 | Ongoing | Dec 2028 | Not due yet |
| THE PLATINUM MALL BY PARKSYDEP51600052862 | PANCHWATI ANNEX, Nashik | 756 | Oct 2023 | Ongoing | May 2028 | Not due yet |
| PARKSYDE NEST PHASE - 2P51600025619 | PANCHAVATI ANNEX, Nashik | - | Jul 2020 | Completed | Dec 2027 | Jun 2025 |
| THE GRAND BY PARKSYDE PHASE - 1P51600034070 | CHANDSHI, Nashik | 121 | Mar 2022 | Ongoing | Apr 2027 | Not due yet |
| PARKSYDE NEST PHASE - 3P51600025687 | [ANCHAVATI ANNEX, Nashik | - | Jul 2020 | Completed | Jun 2026 | Sep 2024 |
| PARKSYDE HOUSEP51600054662 | COLLEGE ROAD NASHIK, Nashik | - | Feb 2024 | Completed | Apr 2026 | Jun 2025 |
| PARKSYDE NEST PHASE-3AP51600033065 | PANCHAVATI ANNEX, Nashik | - | Feb 2022 | Completed | Dec 2025 | Sep 2024 |
| Parksyde Homes Phase 5AP51600004799 | Hanuman Nagar, Nashik | - | Aug 2017 | Completed | Jun 2025 | Sep 2023 |
| SHUBHARAMBHP51600030396 | PANCHAVATI ANNEX, Nashik | 187 | Aug 2021 | Completed | Aug 2024 | Aug 2024 |
| PARKSYDE HOMES PHASE 3 | PARKSYDE HOMES S NO 256 257 PART HANUMAN NAGAR NASHIK 422003 | 3 | - | Completed | Dec 2021 | Nov 2020 |
| PARKSYDE HOMES PHASE-2B | PARKSYDE HOMES S NO 256 PART 257 PART PANCHAVATI ANNEX NASHIK | 3 | - | Completed | Apr 2020 | Nov 2018 |
| PARKSYDE HOMES PHASE-2A | S NO. 256 257 PART HANUMAN NAGAR PANCHAVATI ANNEX NASHIK 422003 | 3 | - | Completed | Apr 2020 | Apr 2019 |
| PARKSYDE HOMES PHASE-4B | PARKSYDE HOMES S NO 256 PART 257 PART HANUMAN NAGAR PANCHAVATI NASHIK-422003 | 2 | - | Completed | Oct 2019 | Jul 2019 |
| PARKSYDE HOMES PHASE-4A | PARKSYDE HOMES S NO. 256 PART 257 PART HANUMAN NAGAR PANCHAVATI ANNEX NASHIK | 4 | - | Completed | Mar 2019 | Nov 2018 |
| PARKSYDE HOMES PHASE-1 | PARKSYDE HOMES S NO 256 257 PART HANUMAN NAGAR NASHIK 422003 | 5 | - | Completed | Jun 2018 | Oct 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
Keep THE GRAND BY PARKSYDE PHASE - 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHANDSHI4,100+ in Nashik
Filed coordinates, straight-line distance. 107 registered projects within 2 km.
THE PLATINUM MALL BY PARKSYDE
JAIKUMAR CONSTRUCTIONS LTD
AVADH UTOPIA
DHATRAK CONSTRUWELL
ROONGTA ELEGANTE APARTMENT
ROONGTA LANDMARKS LLP
Siddhivinayak Trade Center
Dhatrak Constructions
G SQUARE
GIRI ASSOCIATE CONSTRUCTION
SADGURU HOMES
SHREE SADGURU HOMES
See every Nashik project, with the district possession charts
Builder: JAIKUMAR CONSTRUCTIONS LTD
JAIKUMAR CONSTRUCTIONS LTD has 9 registrations on MahaRERA, including PARKSYDE NEST PHASE - 1 and PARKSYDE NEST PHASE - 2. Its filings disclose 21 earlier MahaRERA projects: declares 17 of 17 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if THE GRAND BY PARKSYDE PHASE - 2 is delayed beyond 30 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE GRAND BY PARKSYDE PHASE - 2?
The registered promoter entity is JAIKUMAR CONSTRUCTIONS LTD, a company as per the filing. Its CIN U45100MH2020PLC338134 and GSTIN 27AAECJ7816J2Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE GRAND BY PARKSYDE PHASE - 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE GRAND BY PARKSYDE PHASE - 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE GRAND BY PARKSYDE PHASE - 2?
The professionals named in the filing: Architect: Ar Umesh Bagul; Engineer: Mr Puneet rai; Engineer: PRASHANT BHAURAO BORSE; Chartered Accountant: BKSK AND ASSOCIATES; Chartered Accountant: BKSK & ASSOCIATES; Chartered Accountant: S H A R P A A R T H & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE GRAND BY PARKSYDE PHASE - 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback