Home / Browse projects / Nashik, Maharashtra / SHUBHARAMBH

Completed No litigation declared Others project

SHUBHARAMBH

By JAIKUMAR CONSTRUCTIONS LTD

RG-MH-14051 · RERA P51600030396 · Last updated on MahaRERA portal: 13 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Aug 2024Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SHUBHARAMBH is a Others project by JAIKUMAR CONSTRUCTIONS LTD in Nashik, Maharashtra, registered with MahaRERA as P51600030396 on 20 Aug 2021. The registration is recorded completed; possession was promised by 31 Aug 2024.

At a glance

Project

  • NameSHUBHARAMBH
  • TypeOthers
  • Location
    • NEAR PARKSYDE HOMES
    • PANCHAVATI ANNEX
    • Nashik (M Corp.)
    • Nashik
    • 422003
  • Pincode422003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600030396
  • ReraGenie IDRG-MH-14051

Builder

  • NameJAIKUMAR CONSTRUCTIONS LTD
  • Entity typeCompany
  • DirectorsMERZYAN HOSI PATEL, HITEN HARIDAS RAJKOTIA
  • Other registrations8 more →
  • Completed4 of 9
  • Declared earlier projects21 →

Key dates

this monthRegisteredAug 2021PromisedAug 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Aug 2021
  • Promised completion31 Aug 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA170000
BNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

A80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Closed/Covered2
Open Space59
BuildingClosed/CoveredOpen SpaceTotal
A11415
B14546

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,572 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11761.86
Proposed, not sanctioned11,762 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASTUSHRI NO 3 THATTHE NAGAR GANGAPUR LINK ROAD NASHIK 422005

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Umesh Bagul
EngineerMr Puneet Dinesh Chandhra Rai
Chartered AccountantSHARP AARTH AND CO
PartnerRole in project
JAIKUMAR CONSTRUCTIONS LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Feb 2025

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 SHUBHARAMBH REVISED.pdf13 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 SHUBHARAMBH REVISED.pdf25 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupancy Certificate A Wing 22-08-2024.pdf25 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 SHUBHARAMBH REVISED.pdf27 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 SHUBHARAMBH.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT SHUBHARAMBH JUNE-24.pdf25 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Grievance Redressal Cell- Shubharambh.pdf28 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20240529161650.pdf29 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY SHUBHARAMBH.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT SHUBHARMABH HOUSE MARCH -24.pdf30 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SHUBHARAMBH 2024.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SHUBHARAMBH DEC-23.pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER SHUBH DEC-23.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SHUBH DEC-23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT SHUBHARAMBH-DEC-23.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER SHUBHARAMB SEP-23.pdf16 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SHUBHARAMBH SEP-23.pdf16 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT SHUBHARAMBH JUNE-23.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER JUNE-23 SHUBHARAMBH.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SHUBHARAMBH JUNE-23.pdf4 Sep 2023
Proforma of Agreement for saleFile: Agreement-For-Sale-Shubharambh.pdf5 Aug 2023
Proforma of Allotment letterFile: ANNEXURE-1 for allotment Shubharambh .pdf5 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT SHUBH JUNE-23.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHUBHARAMBH.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA MARCH-23.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT SHUBH MARCH-23.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY SHUBHARAMBH.pdf11 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA CERTIFICATE MARCH-22 FORM 5.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER DEC-22 SHUBHARAMBH.pdf18 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SHUBARAMBH DEC-22.pdf18 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Shubharambh June 2022.pdf2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHUBHARAMBH Q1 ENGINEER.pdf2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHUBHARAMBH Q2 ENGINEER.pdf2 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHUBHARAMBH CA Q1.pdf2 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHUBHAARAMBH Q2 CA.pdf2 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA CERTIFICATE MARCH-22.pdf17 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE SHUBARAMBH.pdf14 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE SHUBARAMBH Q-3.pdf13 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Shubharambh Sept 22.pdf13 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Shubharambh June 2022.pdf18 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engg Shubharambh Mar 22.pdf18 Aug 2022
Disclosure of sold/ booked inventoryFile: Disclosure Shubharambh June 22.pdf18 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Shubarambh MAr 22.pdf18 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Shubarambh Mar-22.pdf9 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Shubarambh Mar22.pdf9 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20220331212704.pdf31 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Parksyde-Shubharambh Q3.pdf31 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate .pdf7 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CERTIFICATE FORM-A.pdf6 Jan 2022
Disclosure of sold/ booked inventoryFile: disclosure of inventory dec 21 shubharambh.pdf6 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate shubarambh sept 21.pdf9 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20211008211825.pdf9 Oct 2021
Disclosure of sold/ booked inventoryFile: 20211009171603.pdf9 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shubharambh_compressed.pdf9 Oct 2021
Layout approvalFile: Layout letter.pdf6 Aug 2021
Building plan approvalFile: 1.pdf6 Aug 2021
Building plan approvalFile: 2.pdf6 Aug 2021
Building plan approvalFile: 3.pdf6 Aug 2021
PAN CardFile: PAN JCL.pdf6 Aug 2021
Copy of the legal title reportFile: Title Certificate.pdf6 Aug 2021
Details of encumbrancesFile: Encrubrance letter.pdf6 Aug 2021
Copy of Layout Approval (in case of layout)File: Layout letter.pdf6 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf6 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf6 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf6 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-Subharambh.pdf6 Aug 2021
Declaration about Commencement CertificateFile: Declaration about Commencement certificate.pdf6 Aug 2021
Declaration in FORM BFile: Form B.pdf6 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM-1.pdf6 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Form-2.pdf6 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf6 Aug 2021
Proforma of Allotment letterFile: Allotment and agreement Letter.pdf6 Aug 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PARKSYDE HOMES PHASE-2BPARKSYDE HOMES S NO 256 257 PART HANUMAN NAGAR PANCHAVATI ANNEX NASHIK 4220033CompletedApr 2020Nov 2018
PARKSYDE HOMES PHASE-2APARKSYDE HOMES S NO 256 257 PART HANUMAN NAGAR PANCHAVATI ANNEX NASHIK 4220033CompletedApr 2020Apr 2019
PARKSYDE HOMES PHASE-4BPARKSYDE HOMES S NO 256 257 PART HANUMAN NAGAR PANCHAVATI ANNEX NASHIK 4220032CompletedOct 2019Jul 2019
PARKSYDE HOMES PHASE-4APARKSYDE HOMES S NO 256 257 PART HANUMAN NAGAR PANCHAVATI ANNEX NASHIK 4220034CompletedMar 2019Nov 2018
PARKSYDE HOMES PHASE-1PARKSYDE HOMES S NO 256 257 PART HANUMAN NAGAR PANCHAVATI ANNEX NASHIK 4220035CompletedJun 2018Oct 2017

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHUBHARAMBH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANCHAVATI ANNEX4,100+ in Nashik

Builder: JAIKUMAR CONSTRUCTIONS LTD

JAIKUMAR CONSTRUCTIONS LTD has 9 registrations on MahaRERA, including PARKSYDE NEST PHASE - 1 and PARKSYDE NEST PHASE - 2. Its filings disclose 21 earlier MahaRERA projects: declares 17 of 17 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHUBHARAMBH is delayed beyond 31 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHUBHARAMBH?

The registered promoter entity is JAIKUMAR CONSTRUCTIONS LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHUBHARAMBH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHUBHARAMBH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHUBHARAMBH?

The professionals named in the filing: Architect: Ar Umesh Bagul; Engineer: Mr Puneet Dinesh Chandhra Rai; Chartered Accountant: SHARP AARTH AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUBHARAMBH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUBHARAMBH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUBHARAMBH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.