Home / Browse projects / Pune, Maharashtra / THE CONNECT

Completed No litigation declared Commercial project

THE CONNECT

By AIM HOUSING PRIVATE LIMITED

RG-MH-80036 · RERA P52100018628 · Last updated on MahaRERA portal: 11 Mar 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2022Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Staircases, 34%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

THE CONNECT is a Commercial project by AIM HOUSING PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100018628 on 22 Nov 2018. The registration is recorded completed; possession was promised by 30 Mar 2022.

At a glance

Project

  • NameTHE CONNECT
  • TypeCommercial
  • Location
    • Near to Pune Banglore Highway road
    • Bavdhan Budruk Tal. Mulshi
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411021
  • Pincode411021
  • RERA no.P52100018628
  • ReraGenie IDRG-MH-80036

Builder

  • NameAIM HOUSING PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsRajesh Omkarnath Malpani, Ashish Madhav Malpani

Key dates

this monthRegisteredNov 2018PromisedMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Nov 2018
  • Promised completion30 Mar 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
I T BUILDINGNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 34%.

I T BUILDING: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks34%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.3%

Progress on shared amenities15

As on 11 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,952 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11903.72
Proposed, not sanctioned11,904 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchF C Road Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSubhas Shah
EngineerMr Sunil Mutalik and Associates
PartnerRole in project
AIM HOUSING PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Mar 2024

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: M Connect OC.PDF11 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: M Connect architect Form 4 06022024.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M Connect architect Form 1 As on 30062023_compressed.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M Connect architect Form 1 As on 30092023_compressed.pdf1 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A M Connect AIM Housing 22 23.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 The Connect as on 30092023.pdf30 Dec 2023
Disclosure of sold/ booked inventoryFile: 1 Sold Unold Inventory The Connect as on 30092023.pdf30 Dec 2023
Certificates of CA (Form 3)File: CA Form 3 The Connect as on 30092023_compressed.pdf30 Dec 2023
Layout approvalFile: sanction plan 1 of 5 29122022.pdf29 Dec 2023
Building plan approvalFile: sanction plan 2 of 5_compressed.pdf29 Dec 2023
Building plan approvalFile: sanction plan 3 of 5_compressed.pdf29 Dec 2023
Building plan approvalFile: sanction plan 4 of 5_compressed.pdf29 Dec 2023
Building plan approvalFile: sanction plan 5 of 5_compressed.pdf29 Dec 2023
Copy of Layout Approval (in case of layout)File: sanction plan 1 of 5 29122022.pdf29 Dec 2023
Building Plan Approval (IOD)File: sanction plan 2 of 5_compressed.pdf29 Dec 2023
Building Plan Approval (IOD)File: sanction plan 3 of 5_compressed.pdf29 Dec 2023
Building Plan Approval (IOD)File: sanction plan 4 of 5_compressed.pdf29 Dec 2023
Building Plan Approval (IOD)File: sanction plan 5 of 5_compressed.pdf29 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate 29122022.pdf29 Dec 2023
Certificates of CA (Form 3)File: 5 Form 3 The Connect 31032023.pdf29 Dec 2023
Certificates of CA (Form 3)File: 6 Form 3 The Connect 30062023.pdf29 Dec 2023
Proforma of Agreement for saleFile: Agreement MConnect AIM Housing final.pdf8 Sep 2023
Deviation Report with respect to model copy of AgreementFile: No deviation Agreement MConnect AIM Housing.pdf8 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrance merged.pdf6 Sep 2023
Details of encumbrances concerned to LegalFile: Encumbrance merged.pdf6 Sep 2023
Declaration in FORM BFile: Form B M Connect Aim Housing.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Engineer THE CONNECT as on 31062022 compressed.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 Engineer THE CONNECT as on 30092022 compressed.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 Engineer THE CONNECT as on 31122022 compressed.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 Engineer THE CONNECT as on 31032023 compressed.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 Engineer THE CONNECT as on 30062023 compressed.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: 2 Disclosure of Sold and Unsold Inventory The Connect 30062022.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: 3 Disclosure of Sold and Unsold Inventory The Connect 30092022.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: 4 Disclosure of Sold and Unsold Inventory The Connect 31122022.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: 5 Disclosure of Sold and Unsold Inventory The Connect 31032023.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: 6 Disclosure of Sold and Unsold Inventory The Connect 30062023.pdf6 Sep 2023
Certificates of CA (Form 3)File: 2 Form 3 The Connect 30062022.pdf6 Sep 2023
Certificates of CA (Form 3)File: 3 Form 3 The Connect 30092022.pdf6 Sep 2023
Certificates of CA (Form 3)File: 4 Form 3 The Connect 31122022.pdf6 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure merged the connect.pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020 2021 M Connect.pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021 2022 M Connect.pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022 2023 M Connect.pdf6 Sep 2023
Proforma of Allotment letterFile: Draft Allotment Letter M Connect.pdf6 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Account Declaration Format A The Connect.pdf6 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account change merged doc.pdf6 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviatoin Allotment Letter M Connect.pdf6 Sep 2023
PAN CardFile: PAN CARD AIM housing.pdf24 Aug 2023
CERSAI detailsFile: No cersai letter final.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Connect 31032022 compressed.pdf7 Jun 2023
Disclosure of sold/ booked inventoryFile: Inventory Details Connect 3102022 compressed.pdf7 Jun 2023
Certificates of CA (Form 3)File: Form 3 The Connect 31032022 CompresSED.pdf7 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM2A CONNECT 31320.pdf5 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A CONNECT 31321.pdf5 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM2A CONNECT 31322.pdf5 May 2023
Declaration about Commencement CertificateFile: Commencement Certificate - Connect.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Connect - 31032021-compressed.pdf23 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 - Connect - 31032021-compressed.pdf23 Aug 2021
Disclosure of sold/ booked inventoryFile: RERA - Inventory Disclosure - Connect - 30062021 - Final.pdf23 Aug 2021
Certificates of CA (Form 3)File: Form 3 - June 2021 -The Connect.pdf23 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_Connect_1920.pdf16 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM- 5 Annual Report on Account Statement- Bavdhan.pdf31 Dec 2019
Building plan approvalFile: 2 (1).pdf1 Nov 2018
Building plan approvalFile: 3 (1).pdf1 Nov 2018
Building plan approvalFile: 4 (1).pdf1 Nov 2018
Building plan approvalFile: 5 (1).pdf1 Nov 2018
Layout approvalFile: SHEET 1 (1).pdf1 Nov 2018
Copy of the legal title reportFile: TITLE REPORT (1).pdf1 Nov 2018
Details of encumbrancesFile: No Encumberance Certificate.pdf1 Nov 2018
Copy of Layout Approval (in case of layout)File: SHEET 1 (1).pdf1 Nov 2018
Building Plan Approval (IOD)File: 2 (1).pdf1 Nov 2018
Building Plan Approval (IOD)File: 3 (1).pdf1 Nov 2018
Building Plan Approval (IOD)File: 4 (1).pdf1 Nov 2018
Building Plan Approval (IOD)File: 5 (1).pdf1 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf1 Nov 2018
Declaration in FORM BFile: FORM - B.pdf1 Nov 2018
Certificates of CA (Form 3)File: Form 3- CA Certificate 15092018.pdf1 Nov 2018
Proforma of Allotment letterFile: Draft - Agreement.pdf1 Nov 2018
Proforma of Allotment letterFile: Draft - Agreement.pdf1 Nov 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE CONNECT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bavdhan Budruk Tal. Mulshi13,700+ in Pune

Builder: AIM HOUSING PRIVATE LIMITED

AIM HOUSING PRIVATE LIMITED has 1 registration on MahaRERA, including THE CONNECT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if THE CONNECT is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE CONNECT?

The registered promoter entity is AIM HOUSING PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE CONNECT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE CONNECT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE CONNECT?

The professionals named in the filing: Architect: Subhas Shah; Engineer: Mr Sunil Mutalik and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE CONNECT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE CONNECT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE CONNECT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.