Home / Browse projects / The Collection - W2 and W7
The Collection - W2 and W7
RG-MH-17431 · RERA P52100028754 · Last updated on MahaRERA portal: 23 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
The Collection - W2 and W7 is a Others project by Bramhacorp Limited in Vadgaonsheri, 411014, registered with MahaRERA as P52100028754 on 30 Mar 2021. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 289 of the 338 units on this registration are recorded sold or booked, and 20 of 33 construction stages are filed complete.
At a glance
Project
- NameThe Collection - W2 and W7
- TypeOthers
- Location
- Vadgaonsheri Kalyaninagar road
- Vadgaonsheri
- 411014
- Pincode411014
- RERA no.P52100028754
- ReraGenie IDRG-MH-17431
Builder
- NameBramhacorp Limited
- Entity typeCompany
- CINU70101PN2012PLC142705
- GSTIN27AAFCB0273N1ZI
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Other registrations25 more →
- Completed8 of 26
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Mar 2021
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings3 building records
- Documents filed133 files
Current status
Figures as on 23 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| The Collection - Residential W2 | NA | 37 | 28 | 150 | 0 | 150 |
| The Collection - Residential W7 | NA | 37 | 28 | 149 | 0 | 149 |
| The Collection - Commercial W2 | NA | 8 | 3 | 0 | 39 | 39 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 23 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 96%.
The Collection - Residential W285%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
The Collection - Residential W786%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
The Collection - Commercial W285%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 23 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 85% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 85% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 25% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 85% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 85% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 85% |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed326
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| The Collection - Residential W2 | 144 | 144 |
| The Collection - Residential W7 | 143 | 143 |
| The Collection - Commercial W2 | 39 | 39 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| The Collection - Residential W2 | NA | Rs 73.78 cr | Rs 71.06 cr |
| The Collection - Residential W7 | NA | Rs 67.44 cr | Rs 66.50 cr |
| - | NA | Rs 11.81 cr | Rs 11.34 cr |
| The Collection - Commercial W2 | NA | Rs 7.07 cr | Rs 6.67 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | FOURTH DIMENSION ARCHITECTS PVT. LTD. |
| Architect | SACHIN SHAH |
| Architect | Imran Shaikh |
| Architect | Padmakar Kole |
| Engineer | PANKAJ SOMWANSHI |
| Engineer | Dattatray Gaikwad |
| Chartered Accountant | Faiz Shaikh |
| Chartered Accountant | F A A & Associates LLP |
| Chartered Accountant | S D Kharadkar & Associates |
| Partner | Role in project |
|---|---|
| Bramhacorp Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Mar 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 May 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed133
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Dec 25_ W2 W7.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_Dec 25_ W2 W7.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: Form 3_Dec 25_ W2 W7.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: Form 1_Sep 25_W2 W7.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Form 2_Sep 25_W2 W7.pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: Form 3_Sep 25_W2 W7.pdf | 15 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_W2 W7.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Form 1_June 25_W2 W7.pdf | 11 Sep 2025 |
| Withdrawal Update Form 2File: Form 2_June 25_W2 W7.pdf | 11 Sep 2025 |
| Withdrawal Update Form 3File: Form 3_June 25_W2 W7.pdf | 11 Sep 2025 |
| Form 2A (FY 2024-2025)File: Collection W2 W7.pdf | 30 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 25_W2 W7.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Mar 25_W2 W7.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 25_W2 W7_compressed.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 25_W2 W7.pdf | 18 Apr 2025 |
| Details of encumbrancesFile: Encumbrance_W2 W7.pdf | 31 Mar 2025 |
| CERSAI detailsFile: The Collection H402CFC1537958 CERSAI_Search_Report_Security_Interest_Id_Based_Search_11_03 | 21 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24_W2 W7.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: W2 W7.pdf | 21 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: W2 W7.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24_W2 W7.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_W2 W7.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24_W2 W7.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24_W2 W7.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: W2 W7.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24_Collection W2 and W7.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: W2 W7.pdf | 2 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 24_W2 W7.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jun 24_W2 W7.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Jun 24_W2 W7.pdf | 13 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Jun 24_W2 W7.pdf | 13 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Coll W2 W7.pdf | 30 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 24_W2 W7.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 24_W2 W7.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24_W2 W7.pdf | 29 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Mar 24_W2W7.pdf | 29 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: W2 AND W7.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 23_Coll W2 W7.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23_Coll W2 W7.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 23_Coll W2 W7.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Dec 23_Coll W2 W7.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: W2 and W7 RESIDENTIAL.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_W2 W7_Sep 23.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_W2 W7_Sep 23.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_W2 W7_Sep 23.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_W2 W7_Sep 23.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Coll W2 W7.pdf | 30 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION W2 AND W7_JUNE 2023.pdf | 5 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory_The Collection W2 and W7.pdf | 5 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection W2 W7 Form 3_ Jun 2023_.pdf | 5 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ The Collection W2 AND W7 _June 2023.pdf | 31 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- The Collection Residential W2 and W7.pdf | 31 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection W2 W7 Form 3_ Mar 2023.pdf | 20 Apr 2023 |
| Declaration in FORM BFile: THE COLLECTION W2 AND W7.pdf | 18 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Collection W2 AND W7 _Mar 2023.pdf | 18 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION W2 AND W7_MAR 2023.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- The Collection Residential W2 and W7.pdf | 18 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: The Collection W2 and W7.pdf | 12 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_The Collection W2 and W7.pdf | 27 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Collection W2 W7 Dec 22.pdf | 30 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION W2 AND W7_Dec 2022.pdf | 24 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: The collection W2 and W7.pdf | 23 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- The Collection Residential W2 and W7.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_The Collection W2 and W7.pdf | 17 Jan 2023 |
| Layout approvalFile: Sheet 1.pdf | 26 Dec 2022 |
| Building plan approvalFile: Sheet 23 - W2 Floor Plan and Calculation.pdf | 26 Dec 2022 |
| Building plan approvalFile: Sheet 24 - W2 Floor Plan Calculation and Elevation.pdf | 26 Dec 2022 |
| Building plan approvalFile: Sheet 25 - Building W2 Sections.pdf | 26 Dec 2022 |
| Building plan approvalFile: Sheet 31 - Building W7 Floor Plan and Calculation.pdf | 26 Dec 2022 |
| Building plan approvalFile: Sheet 32 - W7 Floor Plan and Calculations.pdf | 26 Dec 2022 |
| Building plan approvalFile: Sheet 33 - W7 Section and Elevation.pdf | 26 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: Sheet 1.pdf | 26 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 23 - W2 Floor Plan and Calculation.pdf | 26 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 24 - W2 Floor Plan Calculation and Elevation.pdf | 26 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 25 - Building W2 Sections.pdf | 26 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 31 - Building W7 Floor Plan and Calculation.pdf | 26 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 32 - W7 Floor Plan and Calculations.pdf | 26 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 33 - W7 Section and Elevation.pdf | 26 Dec 2022 |
| Declaration about Commencement CertificateFile: CC_Building.pdf | 26 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_THE COLLECTION W2 and W7_Nov 2022 (1).pdf | 26 Dec 2022 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Bramha Exuberance CP52100001076 | KONDHWA, Pune | - | Jul 2017 | Completed | Dec 2021 | Jan 2019 |
| Bramha Vantage A / B | Survey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District Pune | 51 | - | Completed | Aug 2017 | Apr 2017 |
| Bramha Baug | Survey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District Pune | 8 | - | Completed | Jan 2017 | Late, Feb 2017 |
| Bramha Suncity Platinum | S No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Village Wadgaon Sheri Pune | 134 | - | Completed | Sep 2014 | Sep 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 25 other registrations, which the RERA portal never shows together
- All 133 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep The Collection - W2 and W7 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vadgaonsheri
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: Bramhacorp Limited
Bramhacorp Limited has 26 registrations on MahaRERA, including Bramha Exuberance C and F RESIDENCES T5 T6 and T7. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if The Collection - W2 and W7 is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of The Collection - W2 and W7?
The registered promoter entity is Bramhacorp Limited, a company as per the filing. Its CIN U70101PN2012PLC142705 and GSTIN 27AAFCB0273N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in The Collection - W2 and W7?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for The Collection - W2 and W7?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at The Collection - W2 and W7?
The professionals named in the filing: Architect: FOURTH DIMENSION ARCHITECTS PVT. LTD.; Architect: SACHIN SHAH; Architect: Imran Shaikh; Architect: Padmakar Kole; Engineer: PANKAJ SOMWANSHI; Engineer: Dattatray Gaikwad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in The Collection - W2 and W7?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback