The Collection - Residential W8
RG-MH-13164 · RERA P52100022277 · Last updated on MahaRERA portal: 30 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 25 other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
The Collection - Residential W8 is a Residential / Group Housing project by Bramhacorp Limited in Vadgaonsheri, 411014, registered with MahaRERA as P52100022277 on 9 Sep 2019. Possession is promised by 30 Dec 2029.
At a glance
Project
- NameThe Collection - Residential W8
- TypeResidential / Group Housing
- Location
- Vadgaonsheri- Kalyaninagar road
- Vadgaonsheri
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100022277
- ReraGenie IDRG-MH-13164
Builder
- NameBramhacorp Limited
- Entity typeCompany
- CINU70101PN2012PLC142705
- GSTIN27AAFCB0273N1ZI
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Other registrations25 more →
- Completed8 of 26
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Sep 2019
- Promised completion30 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed126 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| The Collection - Residential W8 | NA | 37 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.
The Collection - Residential W8: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed190
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | FOURTH DIMENSION ARCHITECT PVT LTD |
| Architect | SACHIN SHAH |
| Engineer | Mr Pankajkumar Somwanshi |
| Chartered Accountant | Faiz Shaikh & Co |
| Partner | Role in project |
|---|---|
| Bramhacorp Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Apr 2025
Documents filed126
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Collection Residential W8.pdf | 30 Jun 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part 19 W8.pdf | 20 Apr 2025 |
| Details of encumbrancesFile: Encumbrance_W8.pdf | 31 Mar 2025 |
| CERSAI detailsFile: The Collection H402CFC1537958 CERSAI_Search_Report_Security_Interest_Id_Based_Search_11_03 | 21 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24_W8.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: W8.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: W8.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24_W8.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_W8.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24_W8.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24_W8.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: W8.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24_Collection W8.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: W8.pdf | 2 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 24_W8.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jun 24_W8.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Jun 24_W8.pdf | 13 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Jun 24_W8.pdf | 13 Jul 2024 |
| Layout approvalFile: layout 1 sheet.pdf | 2 May 2024 |
| Copy of Layout Approval (in case of layout)File: layout 1 sheet.pdf | 2 May 2024 |
| Disclosure of sold/ booked inventoryFile: Coll W8.pdf | 30 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 24_W8.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 24_Resi W8.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24_W8.pdf | 29 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Mar 24_W8.pdf | 29 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: THE COLLECTION W8_.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 23_Coll W8.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23_Coll W8.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 23_Coll W8.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Dec 23_Coll W8.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: W8 RESIDENTIAL.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_W8_Sep 23.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_W8_Sep 23.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_W8_Sep 23.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_W8_Sep 23.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Coll Residential W8.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_The Collection W8 _Aug 2023.pdf | 20 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION W8_AUG 2023.pdf | 20 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- The Collection Residential W8.pdf | 20 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: The Collection W8.pdf | 20 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection W8 Residential Form 3_ Aug 2023.pdf | 20 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory_ The Collection Residential W8.pdf | 5 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection W8 Residential Form 3_ Jun 2023.pdf | 5 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Collection - Residential W8.pdf | 4 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_The Collection W8 _June 2023.pdf | 31 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- The Collection Residential W8.pdf | 31 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection W8 Form 3_ Mar 2023.pdf | 20 Apr 2023 |
| Declaration in FORM BFile: THE COLLECTION RESIDENTIAL W8.pdf | 18 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Collection W8 _Mar 2023.pdf | 18 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION W8_MAR 2023.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- The Collection Residential W8.pdf | 18 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: The Collection Residential W8.pdf | 12 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_The Collection W8.pdf | 27 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Collecition Residential W8 Mar 22.pdf | 24 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Collection W8 Residential Dec 22.pdf | 30 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION W8_Dec 2022.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- The Collection Residential W8.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: The Collection W8.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_The Collection Residential W8.pdf | 17 Jan 2023 |
| Layout approvalFile: Sheet 1.pdf | 15 Dec 2022 |
| Building plan approvalFile: Sheet 34 - W8 Floor Plan and Calculation.pdf | 15 Dec 2022 |
| Building plan approvalFile: Sheet 35 - W8 Floor Plan and Calculation.pdf | 15 Dec 2022 |
| Building plan approvalFile: Sheet 36 - W8 Section and elevation.pdf | 15 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: Sheet 1.pdf | 15 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 34 - W8 Floor Plan and Calculation.pdf | 15 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 35 - W8 Floor Plan and Calculation.pdf | 15 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 36 - W8 Section and elevation.pdf | 15 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_Building.pdf | 15 Dec 2022 |
| Proforma of Agreement for saleFile: The Collection W8 Resi- ISD.pdf | 9 Dec 2022 |
| Proforma of Agreement for saleFile: The Collection W8 Resi-ESD.pdf | 9 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_THE COLLECTION RESIDENTIAL W8_Nov 2022.pdf | 19 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION W8.pdf | 14 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection W8 Residential Form 3_Sep 2022.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: The Collection W8.pdf | 12 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Collection W8.pdf | 10 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A- The Collection Residential W8.pdf | 7 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: THE COLLECTION RESIDENTIAL W8.pdf | 30 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_The Collection Residential W8 _Jun 22_compressed.pdf | 9 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_The Collection Residential W8 _Jun 22.pdf | 8 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: The Collection Residential W8.pdf | 21 Jul 2022 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Bramha Exuberance CP52100001076 | KONDHWA, Pune | - | Jul 2017 | Completed | Dec 2021 | Jan 2019 |
| Bramha Vantage A / B | Survey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District Pune | 51 | - | Completed | Aug 2017 | Apr 2017 |
| Bramha Baug | Survey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District Pune | 8 | - | Completed | Jan 2017 | Late, Feb 2017 |
| Bramha Suncity Platinum | S No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Village Wadgaon Sheri Pune | 134 | - | Completed | Sep 2014 | Sep 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 25 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 126 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep The Collection - Residential W8 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vadgaonsheri
Filed coordinates, straight-line distance. 82 registered projects within 2 km.
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: Bramhacorp Limited
Bramhacorp Limited has 26 registrations on MahaRERA, including Bramha Exuberance C and F RESIDENCES T5 T6 and T7. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if The Collection - Residential W8 is delayed beyond 30 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of The Collection - Residential W8?
The registered promoter entity is Bramhacorp Limited, a company as per the filing. Its CIN U70101PN2012PLC142705 and GSTIN 27AAFCB0273N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in The Collection - Residential W8?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for The Collection - Residential W8?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at The Collection - Residential W8?
The professionals named in the filing: Architect: FOURTH DIMENSION ARCHITECT PVT LTD; Architect: SACHIN SHAH; Engineer: Mr Pankajkumar Somwanshi; Chartered Accountant: Faiz Shaikh & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in The Collection - Residential W8?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback