Home / Browse projects / The Collection Premium

Registered No litigation declared Others project

The Collection Premium

By Bramhacorp Limited

RG-MH-23065 · RERA P52100032719 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 25 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2026Possession promisedno revision filed
19 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 80%
34 of 322Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

The Collection Premium is a Others project by Bramhacorp Limited in vadgaonsheri, 411014, registered with MahaRERA as P52100032719 on 24 Jan 2022. Possession is promised by 31 Dec 2026. 288 of the 322 units on this registration are recorded sold or booked, and 19 of 33 construction stages are filed complete.

At a glance

Project

  • NameThe Collection Premium
  • TypeOthers
  • Location
    • Vadgaonsheri Kalyaninagar Road
    • vadgaonsheri
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032719
  • ReraGenie IDRG-MH-23065

Builder

  • NameBramhacorp Limited
  • Entity typeCompany
  • CINU70101PN2012PLC142705
  • GSTIN27AAFCB0273N1ZI
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Other registrations25 more →
  • Completed8 of 26
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

this monthRegisteredJan 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed127 files

Current status

89%288 of 322 units booked
90.2%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA37281700170
B WINGNA37281000100
CommercialNA8305252

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 80%.

A WING69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises74%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
B WING69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Commercial82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes35%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed338

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots338
Closed/Covered338
BuildingClosed/CoveredTotal
A WING182182
B WING104104
Commercial5252

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,304 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI39809.29
Proposed, not sanctioned30,345 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCAMP PUNE
Estimated costRs 139.88 cr
Cost incurredRs 126.14 cr
Work done90.18%
BuildingWingEstimatedIncurred
A WINGNARs 56.02 crRs 52.55 cr
B WINGNARs 56.02 crRs 52.55 cr
-NARs 15.39 crRs 9.37 cr
CommercialNARs 12.45 crRs 11.68 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN SHAH
ArchitectFOURTH DIMENSION ARCHITECT PVT LTD
ArchitectImran Shaikh
ArchitectPadmakar Kole
EngineerPANKAJ SOMAWANSHI
EngineerDattatray Gaikwad
Chartered AccountantFAIZ SHAIKH & CO
Chartered AccountantF A A & Associates LLP
Chartered AccountantS D Kharadkar & Associates
PartnerRole in project
Bramhacorp Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mar 26_Collection Premium.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2_Mar 26_Collection Premium.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3_Mar 26_Collection Premium.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1_Dec 25_ Coll Premium.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2_Dec 25_ Coll Premium.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3_Dec 25_ Coll Premium.pdf28 Jan 2026
Withdrawal Update Form 1File: Form 1_Sep 25_Collection Premium.pdf14 Nov 2025
Withdrawal Update Form 2File: Form 2_Sep 25_Collection Premium.pdf14 Nov 2025
Withdrawal Update Form 3File: Form 3_Sep 25_Collection Premium.pdf14 Nov 2025
Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_Collection Premium.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1_June 25_Collection Premium.pdf9 Sep 2025
Withdrawal Update Form 2File: Form 2_June 25_Collection Premium.pdf9 Sep 2025
Withdrawal Update Form 3File: Form 3_June 25_Collection Premium.pdf9 Sep 2025
Form 2A (FY 2024-2025)File: Collection Premium.pdf30 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 25_Premium.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_Mar 25_Premium.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 25_Premium.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 25_Coll Premium.pdf18 Apr 2025
Details of encumbrancesFile: Encumbrance_Collection Premium.pdf31 Mar 2025
CERSAI detailsFile: Coll Premium H402CFC1537950 CERSAI_Search_Report_Security_Interest_Id_Based_Search_11_03_221 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24_Collection Premium.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Collection Premium.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Collection Premium.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24_Collectiom Premium.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_Collection Premium.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24_Coll Premium.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24_Coll Premium.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Coll Premium.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24_Collection Premium.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 24_Collection Premium.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jun 24_Coll Premium.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Jun 24_Collection Premium.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Jun 24_Collection Premium.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: Coll Premium.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 24_Premium.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 24_Premium.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24_Coll Premium.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Mar 24_Premium.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: THE COLLECTION PREMIUM.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 23_Coll Premium.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23_Coll Premium.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 23_Coll Premium.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Dec 23_Coll Premium.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Collection Premium_Sep 2023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ Collection Premium_Sep 2023.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Collection Premium_Sep 2023.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Coll Premium_Sep 23.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Coll Premium.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_The Collection Premium _Aug 2023.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION PREMIUM_AUG 2023.pdf21 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- The Collection Premium.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection Premium Form 3_ Aug 2023.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: Inventaory_ The Collection Premium Final.pdf11 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection Premium Form 3_ Jun 2023_.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: The Collection Premium.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ The Collection Premium _June 2023.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- The Collection Premium.pdf31 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection Premium Form 3_ Mar 2023.pdf20 Apr 2023
Declaration in FORM BFile: THE COLLECTION PREMIUM.pdf18 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Collection Premium _Mar 2023.pdf18 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION PREMIUM_MAR 2023.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- The Collection Premium.pdf18 Apr 2023
Disclosure of sold/ booked inventoryFile: The Collection ­ Premium.pdf12 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_The Collection Premium.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Collecition Premium Mar 22.pdf24 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Collection Premium Dec 22.pdf30 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION PREMIUM_Dec 2022.pdf24 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- The Collection Premium.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: The Collection Premium.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_The Collection Premium.pdf17 Jan 2023
Proforma of Agreement for saleFile: The Collection Premium- ISD.pdf9 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE COLLECTION PREMIUM.pdf14 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 THE COLLECTION PREMIUM.pdf14 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Collection Premium Form 3_Sep 2022.pdf14 Oct 2022
Disclosure of sold/ booked inventoryFile: The Collection ­ Premium (2).pdf12 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Collection Premium.pdf10 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A- The Collection Premium.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: THE COLLECTION PREMIUM.pdf30 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_The Collection Premium_Jun 22.pdf9 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Collection Premium.pdf20 Jul 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Bramha Exuberance CP52100001076KONDHWA, Pune-Jul 2017CompletedDec 2021Jan 2019
Bramha Vantage A / BSurvey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District Pune51-CompletedAug 2017Apr 2017
Bramha BaugSurvey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District Pune8-CompletedJan 2017Late, Feb 2017
Bramha Suncity PlatinumS No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Village Wadgaon Sheri Pune134-CompletedSep 2014Sep 2014

Keep The Collection Premium on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near vadgaonsheri

2 kmThe Collection PremiumCompleted 33Lapsed / revoked 11Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 82 registered projects within 2 km.

Builder: Bramhacorp Limited

Bramhacorp Limited has 26 registrations on MahaRERA, including Bramha Exuberance C and F RESIDENCES T5 T6 and T7. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if The Collection Premium is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Collection Premium?

The registered promoter entity is Bramhacorp Limited, a company as per the filing. Its CIN U70101PN2012PLC142705 and GSTIN 27AAFCB0273N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Collection Premium?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Collection Premium?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Collection Premium?

The professionals named in the filing: Architect: SACHIN SHAH; Architect: FOURTH DIMENSION ARCHITECT PVT LTD; Architect: Imran Shaikh; Architect: Padmakar Kole; Engineer: PANKAJ SOMAWANSHI; Engineer: Dattatray Gaikwad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Collection Premium?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Collection Premium. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Collection Premium to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.