Home / Browse projects / Thane, Maharashtra / THARWANI STELLA PHASE II

Registered No litigation declared Others project

THARWANI STELLA PHASE II

By M/S THARWANI REALTORS

RG-MH-91191 · RERA P51700055028 · Last updated on MahaRERA portal: 3 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
1 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

THARWANI STELLA PHASE II is a Others project by M/S THARWANI REALTORS in Thane, Maharashtra, registered with MahaRERA as P51700055028 on 26 Feb 2024. Possession is promised by 31 Dec 2029. 0 of the 1 unit on this registration is recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHARWANI STELLA PHASE II
  • TypeOthers
  • Location
    • DESAI VILLAGE
    • Thane (M Corp.)
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700055028
  • ReraGenie IDRG-MH-91191

Builder

  • NameM/S THARWANI REALTORS
  • Entity typePartnership
  • PartnersANIL HARDASMAL THARWANI, DHIREN ANIL THARWANI, ABHISHEK ANIL THARWANI
  • Other registrations1 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Feb 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed53 files

Current status

0%0 of 1 units booked

Figures as on 3 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CASTOR - Building No 1NA31101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

CASTOR - Building No 1: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership45

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,700 sq m
Land owned byThe promoter, with other names on the file
Named landowners45
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2025
LandownerVillageDistrict
CHANDRAKANT H MHATREThane (M Corp.)Thane
GANESH MHATREThane (M Corp.)Thane
SHARAD KASHINATH MHATREThane (M Corp.)Thane
KASHINATH MHATREThane (M Corp.)Thane
AMIT SHUBASH MHATREThane (M Corp.)Thane
VILAS LAXMAN MHATREThane (M Corp.)Thane
SHATRUGAN SHRIPAT MHATREThane (M Corp.)Thane
SHAHSHIKANT H MHATREThane (M Corp.)Thane
SHILPA RAMAKANT MHATREThane (M Corp.)Thane
NANDA MHATREThane (M Corp.)Thane
PRAVIN MHATREThane (M Corp.)Thane
UJJWALA PRAKASH BHOIRThane (M Corp.)Thane
AARTI PADMAKAR DESLEThane (M Corp.)Thane
BABAN SHRIPAT PATILThane (M Corp.)Thane
NAKUL DATTU MHATREThane (M Corp.)Thane
RAMESH DATTU MHATREThane (M Corp.)Thane
KANTABAI RAMESH MHATREThane (M Corp.)Thane
SHARDA CHINTA PATILThane (M Corp.)Thane
SHAKUNTALA SHAMBU SAWANTThane (M Corp.)Thane
VASANT SHANKAR MHATREThane (M Corp.)Thane
KALURAM RAGHUNATH MHATREThane (M Corp.)Thane
ROSHAN MAHU MHATREThane (M Corp.)Thane
NAVANATH LAHU MHATREThane (M Corp.)Thane
INDUBAI RAMCHANDRA MHATREThane (M Corp.)Thane
SUSHMA RAMCHANDRA MHATREThane (M Corp.)Thane
SHAKTI RAMCHANDRA MHATREThane (M Corp.)Thane
ARUNA VISHAL PATILThane (M Corp.)Thane
RAKESH RAMCHANDRA MHATREThane (M Corp.)Thane
INDRABAI WAMAN MHATREThane (M Corp.)Thane
YOGESH VAMAN MHATREThane (M Corp.)Thane
DHIRAJ VAMAN MHATREThane (M Corp.)Thane
BALARAM ARJUN MHATREAmbiste Kh.Palghar
USHA BALARAM MHATREThane (M Corp.)Thane
LAXMAN ARJUN MHATREThane (M Corp.)Thane
LATA LAXMAN MHATREThane (M Corp.)Thane
BHARAT KASHINATH MHATREThane (M Corp.)Thane
DEVRAJ KASHINATH MHATREThane (M Corp.)Thane
KAILASH KASHINATH MHATREThane (M Corp.)Thane
CHHAYA GURUNATH GODHALIThane (M Corp.)Thane
SHAM KASHINATH MHATREThane (M Corp.)Thane
RESHMA HARICHAND DHONDEThane (M Corp.)Thane
VAALMIK BALARAM MHATREThane (M Corp.)Thane
JANMANJAY BALARAM MHATREThane (M Corp.)Thane
RAMCHANDRA MHATREThane (M Corp.)Thane
VAISHALI PATILThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPOATION
Permissible FSI23030.57
Proposed, not sanctioned2,281 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHADAKPADA KALYAN

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architect10 FOLDS ARCHITECTS AND CONSULTANTS
EngineerKIRAN SHARAD WARE
Chartered AccountantSUNNY BHAGIA AND ASSOCIATES
Chartered AccountantVINOD SANTOSHKUMAR DHANKANI
PartnerRole in project
M/S THARWANI REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Final Form 5_Tharwani Stella Phase II- 2024-25.pdf3 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Stella Phase 2 _31-12-2024.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Stella Phase 2.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned_Final Form 3 Stella Phase 2 dec-24.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Stella Phase 2_Dec 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Stella Phase 2 _Sept 2024.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Stella Phase 2_Sept 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_Stella Phase II_Sep 2024.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _Stella Ph II_June 2024.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL SCANNED FORM 3.pdf23 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: THARWANI REALTORS STELLA PHASE-2.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 STELLA PHASE -II.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Stella Phase 2.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Stella Ph II.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Stella Phase II_March 2024.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: STELLA PHASE 2 FORM 1.pdf20 May 2024
Other - TechnicalFile: Other technical.pdf24 Feb 2024
Copy of the legal title reportFile: Co owners summary Final.pdf16 Feb 2024
Other - TechnicalFile: Other technical.pdf8 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation AFS 2.pdf7 Feb 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf4 Sep 2023
Building plan approvalFile: Ground Floor.pdf4 Sep 2023
Building plan approvalFile: 1St FLoor Podium.pdf4 Sep 2023
Building plan approvalFile: 1st Floor Residential.pdf4 Sep 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Ground Floor.pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 1St FLoor Podium.pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 1st Floor Residential.pdf4 Sep 2023
Copy of the legal title reportFile: 1 Copy of the legal title report (5).pdf4 Aug 2023
Layout approvalFile: Layout.pdf3 Aug 2023
Building plan approvalFile: Index.pdf3 Aug 2023
Details of encumbrances concerned to FinanceFile: 04_Non Encumbrance Certificate_Legal.pdf3 Aug 2023
Details of encumbrances concerned to FinanceFile: Financial encumbrances.pdf3 Aug 2023
Details of encumbrances concerned to LegalFile: 04_Non Encumbrance Certificate_Legal.pdf3 Aug 2023
Details of encumbrances concerned to LegalFile: Financial encumbrances.pdf3 Aug 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf3 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Index.pdf3 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf3 Aug 2023
Declaration in FORM BFile: 12_Form B Declaration- Phase II.pdf3 Aug 2023
Declaration about Commencement CertificateFile: 11_DECLARATION ABOUT COMMENCEMENT CERTIFICATE PHASE II.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13_Architect Certificate_Form I_Phase Ii.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14_Engineer's Certificate_Form 2-Stella phase II.pdf2 Aug 2023
CERSAI detailsFile: Cersai declaration.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 22a_Annexure A - Anil Tharwani.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 22b_Annexure A - Dhiren Tharwani.pdf2 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 22c_Annexure A - Abhishek Tharwani.pdf2 Aug 2023
Proforma of Allotment letterFile: ALLOTMENT OF THE SAID UNIT PHASE II.pdf2 Aug 2023
Proforma of Agreement for saleFile: AFS.pdf2 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow2 Aug 2023
Deviation Report with respect to Allotment letterFile: 40_DEVIATION REPORT WITH RESPECT TO ALLOMENT LETTER II.pdf2 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation AFS 1.pdf2 Aug 2023
PAN CardFile: 1 PAN Card-2.pdf13 Oct 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
THARWANI ARIANA PHASE IIISURVEY NO 133 1 AND 133 P VILLAGE CHIKHLOLI TALUKA AMBERNATH240CompletedApr 2022Late, Jun 2022
THARWANI SOLITAIRE PHASEIIITHARWANI SOLITAIRE KALYAN MURBAD ROAD MHARAL TALUKA KALYAN DIST THANE60CompletedDec 2019Late, Sep 2022
THARWANI SOLITAIRE PHASE IITHARWANI SOLITAIRE KALYAN MURBAD ROAD MHARAL TALUKA KALYAN DIST THANE 421301238CompletedDec 2019Oct 2019
THARWANI ARIANA PHASE 1SURVEY NO 133 1 AND 133 P VILLAGE CHIKHLOLI TALUKA AMBERNATH238CompletedDec 2019Dec 2016
THARWANI SOLITAIRE PHASE ITHARWANI SOLITAIRE KALYAN MURBAD ROAD MHARAL TALUKA KALYAN DIST. THANE 421301196CompletedDec 2017Late, May 2018
THARWANI ARIANA PHASE IISURVEY NO 133 1 AND 133P VILLAGE CHIKHLOLI TALUKA AMBERNATH84CompletedSep 2017Apr 2014

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THARWANI STELLA PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DESAI VILLAGE7,600+ in Thane

Builder: M/S THARWANI REALTORS

M/S THARWANI REALTORS has 2 registrations on MahaRERA, including THARWANI STELLA PHASE 1 and THARWANI STELLA PHASE II. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 6 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if THARWANI STELLA PHASE II is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THARWANI STELLA PHASE II?

The registered promoter entity is M/S THARWANI REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THARWANI STELLA PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THARWANI STELLA PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THARWANI STELLA PHASE II?

The professionals named in the filing: Architect: 10 FOLDS ARCHITECTS AND CONSULTANTS; Engineer: KIRAN SHARAD WARE; Chartered Accountant: SUNNY BHAGIA AND ASSOCIATES; Chartered Accountant: VINOD SANTOSHKUMAR DHANKANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THARWANI STELLA PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THARWANI STELLA PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THARWANI STELLA PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.